FIR17-00412
| INSP-Sprinkler Rough-in | 5/11/2018 | 5/14/2018 | 5/14/2018 2:39:06 PM | P | PART |
|
|
Rough to cover inspection for overhead fire sprinkler piping located above hardlids in the southwest restrooms and corridor complete, approved for cover.
Mike Martin is the contact for this rough to cover inspection. He is hoping for an appointment in the PM. Thank you for your help. Phone #: ###-#### Inspection requested via web by Stan Beus
|
BLD17-02915
| FIRE-Final Inspection | 5/14/2018 | 5/14/2018 | 5/14/2018 2:38:07 PM | P | PASS |
|
|
Exit discharge light is installed at main entry, final life fire safety inspection complete.
Derek Phone #: ###-####
|
FIR17-00755
| INSP-Sprinkler Rough-in | 5/11/2018 | 5/14/2018 | 5/14/2018 1:30:25 PM | P | PART |
|
|
Partial rough to cover inspection complete for overhead fire sprinkler piping, remaining overhead fire sprinkler piping in area of work to be inspected at a later date.
Jeff Chaney is the contact for this rough to cover inspection. Thank you for your help. Phone #: ###-#### Inspection requested via web by Stan Beus
|
FIR17-00317
| INSP-Final Inspection | 5/9/2018 | 5/14/2018 | 5/14/2018 12:39:51 PM | P | PART |
|
|
Final fire sprinkler inspection for levels 2 through 5 complete, level 1 to be completed at a later date. Fire sprinkler heads in bike storage area on level 1 will need to have the insulation raised so it's not resting on the uprights or pendant heads will need to be installed before level 1 final.
Jon Beazer is the contact for this inspection. Thank you. Phone #: ###-#### Inspection requested via web by Stan Beus
|
FIR17-00585
| INSP-Alarm Testing | 5/14/2018 | 5/14/2018 | 5/14/2018 12:38:13 PM | A | PART |
|
|
Fire alarm testing for all fire sprinkler related components complete. Audio visual devices on levels 2 through 5 that were obstructed have been moved. Fire alarm testing for levels 2 through 5 complete.
Phone #: 2088301311 >> Inspection requested via mobile web by Nathan Price
|
FIR17-00206
| INSP-Final Inspection | 5/9/2018 | 5/14/2018 | 5/14/2018 10:29:08 AM | P | PASS |
|
|
Final inspection for underground supply complete.
Jon Beazer is the contact for this inspection. Thank you. Phone #: ###-#### Inspection requested via web by Stan Beus
|
FIR17-00267
| INSP-Sprinkler Rough-in | 5/11/2018 | 5/14/2018 | 5/14/2018 10:10:39 AM | A | PART |
|
|
Rough to cover inspection for overhead fire sprinkler piping above hardlids in level 1 east hallway, west conference room and swimming pool area complete, areas inspected approved for cover.
Contact Ken Orahood ###-#### 30 min prior to 1st floor rough in ; hard lid inspection start please.
Thank YOU Phone #: ###-#### Inspection requested via web by Teri Cruickshank
|
BLD18-00341
| FIRE-Final Inspection | 5/14/2018 | 5/14/2018 | 5/14/2018 9:59:36 AM | P | FAIL |
|
|
Missing ceiling tile for fire sprinkler needs installed for heat collection. Sheetrock needs to be installed in remodeled restroom for fire sprinkler head heat collection.
Steve-please call 15 mintues prior for access Phone #: ###-####
|
FIR18-00367
| INSP-Sprinkler Rough-in | 5/14/2018 | 5/14/2018 | 5/14/2018 9:44:59 AM | P | PASS |
|
|
Rough to cover inspection for overhead fire sprinkler piping in area of work complete, approved for cover.
troy nelson is our foreman Phone #: ###-#### Inspection requested via web by Brad Bettencourt
|
FIR18-00350
| INSP-Sprinkler Rough-in | 5/13/2018 | 5/14/2018 | 5/14/2018 9:27:35 AM | A | PASS |
|
|
Rough to cover inspection for overhead fire sprinkler piping/tenting complete, approved for cover.
Tenting inspection, call Anthony before heading out, thanks! Phone #: ###-#### Inspection requested via web by Anthony Minichiello
|
FIR18-00387
| INSP-Sprinkler Rough-in | 5/13/2018 | 5/14/2018 | 5/14/2018 8:48:11 AM | A | PASS |
|
|
Rough to cover inspection for drop-downs in scope of work for this permit complete, approved for cover.
Call Anthony before heading out, thanks! Phone #: ###-#### Inspection requested via web by Anthony Minichiello
|