FIR18-00005
| INSP-Final Inspection | 5/29/2018 | 5/29/2018 | 5/29/2018 1:39:43 PM | P | FAIL |
|
|
Fire alarm panel was in alarm at time of inspection and fire panel would not reset, fire alarm panel issue needs resloved before fire alarm inspection can be finaled.
We are requesting a final on this project. our off-site contact in Larry ###-#### K2 On-site is Derrick ###-#### Phone #: ###-#### Inspection requested via web by Larry Looney
|
BLD17-04634
| FIRE-Final Inspection | 5/25/2018 | 5/29/2018 | 5/29/2018 1:38:30 PM | A | FAIL |
|
|
Fire alarm panel was in alarm at time of inspection and fire panel would not reset, life fire safety inspection will need to be rescheduled after fire alarm issue is resolved.
Derek Phone #: ###-####
|
FIR17-00763
| INSP-Final Inspection | 5/25/2018 | 5/29/2018 | 5/29/2018 1:36:56 PM | P | PASS |
|
|
Final fire sprinkler inspection for area of work complete.
We would like to perform this inspection in conjunction with the BLD fire life safety. Phone #: ###-#### Inspection requested via web by Jeff Packham
|
BLD17-01763
| FIRE-Conference | 5/29/2018 | 5/29/2018 | 5/29/2018 11:14:44 AM | P | DONE |
|
|
Fire conference complete, a 24 hour fire watch will be required due to added fuel load from shelves being stocked, once fire sprinklers and fire alarm monitoring are complete and active then 24 hour fire watch will not be required.
Phone #: ###-#### Inspection requested via web by Mike Beeson
|
FIR17-00689
| INSP-Sprinkler Rough-in | 5/29/2018 | 5/29/2018 | 5/29/2018 11:12:42 AM | A | PART |
|
|
Rough to cover inspection for overhead fire sprinkler piping/pendant heads in the butcher area and the bakery area complete, approved for cover.
|
BLD17-04686
| FIRE-Conference | 5/25/2018 | 5/29/2018 | 5/29/2018 10:36:22 AM | A | DONE |
|
|
Fire conference complete.
Pete Phone #: ###-####
|
BLD17-00563
| FIRE-Conference | 5/26/2018 | 5/29/2018 | 5/29/2018 9:25:51 AM | A | DONE |
|
|
Fire conference complete.
Call prior to going Phone #: 6084448102 >> Inspection requested via mobile web by David Hull
|
FIR18-00144
| INSP-Sprinkler Rough-in/Hydro | 5/24/2018 | 5/29/2018 | 5/29/2018 9:08:20 AM | A | CANC |
|
|
Inspection request cancelled per point of contact, inspection request will be rescheduled for a later date.
Mike Martin is the contact for this above ground hydro and rough-in. Thank you. Phone #: ###-#### Inspection requested via web by Stan Beus
|
FIR18-00150
| INSP-Final Inspection | 5/25/2018 | 5/29/2018 | 5/29/2018 8:19:49 AM | A | CANC |
|
|
Inspection request cancelled per point of contact, inspection request will be rescheduled for a later date.
Dave Phone #: ###-####
|
FIR17-00290
| INSP-Final Inspection | 5/29/2018 | 5/29/2018 | 5/29/2018 8:18:18 AM | A | CANC |
|
|
Inspection request cancelled per point of contact, inspection request will be rescheduled for a later date.
Incorporate with the fire alarm inspection Phone #: ###-#### Inspection requested via web by John Wheeler
|
FIR17-00276
| INSP-Final Inspection | 5/25/2018 | 5/29/2018 | 5/29/2018 8:18:04 AM | A | CANC |
|
|
Inspection request cancelled per point of contact, inspection request will be rescheduled for a later date.
Please call 1/2 hour before arriving. Thanks Phone #: ###-#### Inspection requested via web by david davis
|