Inspections for the day of: Wednesday, June 12, 2019.
Number of inspections: 20
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorJim Page
TitleFIRE INSPECTOR
Phone #208-914-5431
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
FIR12-00309 FIR-Aging Inspection6/12/20196/12/20196/20/2019 9:11:29 AM FAIL
Plans do not reflect circuit layout on the line drawings.
BLD19-00242 FIRE-Final Inspection6/12/20196/12/20196/12/2019 4:20:00 PMPPART
Previously noted items have been corrected, fire sprinkler inspection is complete, fire alarm inspection is complete, fire extinguishers will be placed in discussed location. TCO is authorized contingent on the racking permit (BLD19-02023) getting inspected and passed. After racking permit is finaled then a final life fire safety inspection will be required to finalize inspection process for life safety.

David Phone #: ###-####
NAF19-00023 INSP-Final6/12/20196/12/20196/12/2019 3:48:03 PMPFAIL
Insulation is resting/covering numerous upright sprinkler heads in warehouse, insulation cannot be resting/covering sprinkler heads, insulation will need to be raised.

Call prior to going Phone #: 2089473955 >> Inspection requested via mobile web by David
NAF18-00124 INSP-Sprinkler Rough-in6/11/20196/12/20196/12/2019 3:22:03 PMPPART
Inspection for overhead fire sprinkler piping above hardlids on level 1 breezeway and level 1 parking on the northwest complete, areas inspected approved for cover.

side of Call prior to going Phone #: 2082979090 >> Inspection requested via mobile web by Ken
FIR19-00208 INSP-Final Inspection6/11/20196/12/20196/12/2019 3:05:48 PMPPASS
Final hood suppression system inspection compete.

Please call 1 hour prior to arrival to allow us time to get there and set up.
We typically work nights so we are not early risers... Phone #: ###-#### Inspection requested via web by JJ Wallace
FIR19-00330 INSP-Final Inspection6/12/20196/12/20196/12/2019 2:48:01 PMPPASS
Final fire alarm inspection for scope of work complete.
FIR15-00088 INSP-Final Inspection6/10/20196/12/20196/12/2019 2:46:15 PMPPASS
Final fire sprinkler inspection complete.

John Phone #: ###-####
FIR19-00258 INSP-Sprinkler Rough-in6/12/20196/12/20196/12/2019 2:45:53 PMPPART
Rough to cover inspection for underground stub in complete, approved for cover.

UG rough in. Phone #: ###-#### Inspection requested via web by Lonnie Greenfield
FIR18-00698 INSP-Sprinkler Rough-in/Hydro6/12/20196/12/20196/12/2019 2:19:14 PMPDONE
Hydrostatic test for underground supply witnessed, no pressure loss observed.
FIR19-00215 INSP-Sprinkler Rough-in/Hydro6/11/20196/12/20196/12/2019 2:14:07 PMADONE
Hydrostatic test for overhead fire sprinkler piping witnessed, no pressure loss observed.

Gabe Garduno is the contact. This inspection is to be done in connection with an underground flush/hydro for 11783 W. Fairview at 10:00 AM, as well as an underground flush/hydro for this building. Thank you for the hard work! Phone #: ###-#### Inspection requested via web by Stan Beus
BLD19-00637 FIRE-Final Inspection6/12/20196/12/20196/12/2019 11:48:18 AMPCANC
Inspection request will be rescheduled to coincide with fire sprinkler inspection. This request is cancelled per conversation with point of contact.

Joe Phone #: ###-####
FIR18-00435 INSP-Conference6/11/20196/12/20196/12/2019 11:45:28 AMPDONE
Per conversation with Ron Johnson, the material that Petra wants to move in needs to be non-combustible material, due to fire sprinklers not being monitored/active then material cannot be combustible. Moving in combustibles that are not associated with cunstruction is fuel loading and per Ron Johnson with Boise Fire this is not acceptable until active fire protection is in place.

Jon Beazer is the contact. Thank you for your hard work! Phone #: ###-#### Inspection requested via web by Stan Beus
FIR19-00414 INSP-Sprinkler Rough-in6/12/20196/12/20196/12/2019 11:22:26 AMPFAIL
Rough in inspection for new sprinkler piping complete, cover is not approved due to insulation/insulation foil is resting on some of the uprights, insualtion and foil must be secure and not resting/blocking fire sprinkler heads.

Jon Beazer is the contact. Thank you for your hard work! Phone #: ###-#### Inspection requested via web by Stan Beus
FIR19-00309 INSP-Sprinkler Rough-in/Hydro6/11/20196/12/20196/12/2019 11:17:34 AMACANC
Cancelled per conversation with point of contact, leak was found, hydrostatic test to be rescheduled for a later date.

Gabe Garduno is the contact. This inspection is to be done in connection with an underground flush/hydro for 11792 W. Fairview at 10:00 AM, as well as an underground flush/hydro for this building. Thank you for the hard work! Phone #: ###-#### Inspection requested via web by Stan Beus
FIR18-00698 INSP-Supply line flush6/11/20196/12/20196/12/2019 10:40:55 AMADONE
Underground main line flush complete.

Gabe Garduno is the contact. Stacey with Suez will be at this building as well as 11783 at 10:00 AM to do this underground flush. This inspection is to be at the same time as above ground hydros for both buildings as well. Thank you for your hard work! Phone #: ###-#### Inspection requested via web by Stan Beus
FIR18-00697 INSP-Supply line flush6/11/20196/12/20196/12/2019 10:40:25 AMADONE
Underground main line flush complete.

Gabe Garduno is the contact. Stacey with Suez will be at this building as well as 11792 at 10:00 AM to do this underground flush. This inspection is to be at the same time as above ground hydros for both buildings as well. Thank you for your hard work! Phone #: ###-#### Inspection requested via web by Stan Beus
BLD18-03484 FIRE-Final Inspection6/12/20196/12/20196/12/2019 10:25:36 AMPFAIL
Self closing door hinges on east level 1 units are not operable, doors will not close on their own. Provide signage for fire sprinkler riser room and FACP for fire alarm control panel. Provide apartment unit number for each apartment, signage not in place at time of inspection. Install knox box for fire department. Bill Phone #: ###-####
FIR19-00263 INSP-Sprinkler Rough-in6/11/20196/12/20196/12/2019 9:40:32 AMAPART
Partial rough to cover inspection for attic dry system complete, notated city approved drawings with yellow highlighter areas approved for cover on the dry system.

Daniel Arce is the contact for this RTC inspection. He is requesting it to be done on the dry system. Thank you for your help. Phone #: ###-#### Inspection requested via web by Stan Beus
FIR19-00168 INSP-Sprinkler Rough-in6/11/20196/12/20196/12/2019 9:00:09 AMAPART
Rough to cover inspection for sprinkler piping above hardlids in locker rooms complete, approved for cover.

Lonnie Phone #: ###-#### Inspection requested via web by Lonnie Greenfield
FIR18-00824 INSP-Final Inspection6/11/20196/12/20196/12/2019 8:35:07 AMAPASS
Final fire sprinkler ispection complete.

Call James to coordinate, thanks! Phone #: ###-#### Inspection requested via web by Anthony Minichiello