Inspections for the day of: Friday, July 19, 2019.
Number of inspections: 12
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorJim Page
TitleFIRE INSPECTOR
Phone #208-914-5431
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
FIR18-00834 INSP-Sprinkler Rough-in/Hydro7/17/20197/19/20197/19/2019 2:45:20 PMADONE
Hydrostatic test for underground supply witnessed, no pressure loss observed.

Troy Lowe is the contact. Thank you for your hard work! Phone #: ###-#### Inspection requested via web by Stan Beus
BLD18-02814 FIRE-Final Inspection7/19/20197/19/20197/19/2019 1:51:49 PMPPASS
Fire sprinkler inspection is complete, fire alarm inspection is complete, fire extinguishers are in common areas with current inspection tags. Final life fire safety inspection for area of work complete.

Jon Phone #: ###-####
FIR19-00403 INSP-Final Inspection7/18/20197/19/20197/19/2019 1:49:48 PMPPASS
Previously noted items have been corrected, final fire alarm inspection for area of work complete.

Contact is Dirk. Phone #: ###-#### Inspection requested via web by Morgan Ahten
BLD18-03208 FIRE-Final Inspection7/19/20197/19/20197/19/2019 12:26:10 PMPPASS
Fire sprinkler modifications have been completed (Annual inspection for fire sprinklers is current), no fire alarm modifications, fire extinguishers are placed with current inspection tags, knox box is located by the main entry, refer previous note entered by Joe Bruce for racking, slide bolt on door btween warehouse and sales floor was rem oved at time of inspection. Final life fire safety inspection complete.

tamra Phone #: ###-####
FIR19-00469 INSP-Sprinkler Rough-in7/18/20197/19/20197/19/2019 11:06:16 AMPPASS
Rough to cover inspection for overhead fire sprinkler piping in area of work complete, area of work approved for cover. Notated an area on the city approved draiwngs where there is exposed combustible material above the ceiling grid, will verify area is covered by sprinkler protection at final inspection.

Zack is The contact Phone #: ###-#### Inspection requested via web by Chris Green
BLD18-03233 FIRE-Final Inspection7/17/20197/19/20197/19/2019 8:51:39 AMAPASS
Fire sprinkler inspection is complete, no fire alarm modifications, fire extinguishers are placed with current inspection tags. Final life fire safety inspection for area of work complete.

Michael Phone #: ###-####
FIR19-00443 INSP-Final Inspection7/19/20197/19/20197/19/2019 8:50:47 AMAPASS
Final fire sprinkler inspection for area of work complete.
BLD18-02797 FIRE-Final Inspection7/18/20197/19/20197/19/2019 8:49:14 AMAPART
Fire sprinkler inspection is complete, fire alarm inspection is complete, fire extinguishers are placed with current inspection tags. Partial final inspection complete for life fire safety, last remaining items to be completed before final life fire safety sign off is provide FACP signage on door leading to fire panel, install fire lane signage as specified in review comments under notes 9 and 10 of the building permit fire code review comments. Need to verify if old fire pump room is staying in place ot being removed, if existing pump room stays then fire sprinklers will need to be provided. 30 day TCO authorized per conversation with Ron Johnson with Boise Fire contingent on the 3 noted items getting completed.

mIKE Phone #: ###-####
FIR19-00095 INSP-Final Inspection7/19/20197/19/20197/19/2019 8:43:24 AMAPASS
Final fire alarm inspection is complete.
FIR18-00964 INSP-Final Inspection7/17/20197/19/20197/19/2019 8:42:22 AMACANC
Phone #: ###-#### Inspection requested via web by Lonnie Greenfield
FIR18-00964 INSP-Final Inspection7/19/20197/19/20197/19/2019 8:41:27 AMAPASS
Final fire sprinkler inspection for area of work complete.

BLD19-00142 FIRE-Conference7/18/20197/19/20197/18/2019 4:07:30 PMACANC
Room 102 (Front Office) Phone #: ###-#### >> Inspection requested via web by Doug Storey Inspection cancelled from web by: Doug Storey