BLD19-03342
| FIRE-Alarm Testing | 7/2/2020 | 7/2/2020 | 7/8/2020 12:26:41 PM | P | DONE |
|
|
Alarm testing and life safety completed for phase 1 completed on 02JULY2020.
Fire Alarm couldn''t get their inspection in until pm today so I''m moving this inspection from am to pm. ALso, Fire sprinkler and Structural are scheduled for PM as well Phone #: ###-#### Inspection requested via web by Brandon Reynolds
|
FIR20-00457
| INSP-Sprinkler Rough-in | 7/1/2020 | 7/2/2020 | 7/2/2020 3:50:30 PM | P | PASS |
|
|
Rough to cover inspection for scope of work is complete, approved for cover.
Call Anthony before heading out. He will need to meet you there. Phone #: ###-#### Inspection requested via web by Anthony Minichiello
|
BLD19-03342
| FIRE-Final Inspection | 7/2/2020 | 7/2/2020 | 7/2/2020 3:50:00 PM | P | PART |
|
|
Fire sprinkler and fire alarm inspections for TCO phase 1 complete, fire extinguishers for phase 1 are placed. Final life fire safety inspection for TCO phase 1 complete, signatures provided on temporary line for phase 1.
Fire Alarm couldn''t get their inspection in until pm today so I''m moving this inspection from am to pm. ALso, Fire sprinkler and Structural are scheduled for PM as well Phone #: ###-#### Inspection requested via web by Brandon Reynolds
|
FIR20-00136
| INSP-Final Inspection | 7/2/2020 | 7/2/2020 | 7/2/2020 3:48:44 PM | P | PART |
|
|
Final fire alarm inspection for TCO phase 1 complete.
Contact is Dan. Phone #: ###-#### Inspection requested via web by Morgan Ahten
|
FIR19-00623
| INSP-Sprinkler Rough-in | 7/1/2020 | 7/2/2020 | 7/2/2020 3:48:12 PM | A | PASS |
|
|
Remaining rough to cover inspection is complete, approved for cover.
system #1 Phone #: ###-#### Inspection requested via web by Matthew Lewis
|
FIR20-00047
| INSP-Final Inspection | 7/2/2020 | 7/2/2020 | 7/2/2020 3:17:16 PM | P | PART |
|
|
Final fire sprinkler inspection for TCO phase 1 complete.
Richard Clark is the contact. Phone #: ###-#### Inspection requested via web by Stan Beus
|
BLD20-00356
| FIRE-Final Inspection | 7/1/2020 | 7/2/2020 | 7/2/2020 1:31:42 PM | A | PART |
|
|
Fire sprinkler inspection is complete, fire alarm inspection is complete, partial placement of fire extinguishers is complete (racking is not completed or inspected, fire extinguishers will be placed in areas still needing racking completion), exit signage is attached to racking in numerous areas, as stated racking needs to be completed , once racking is completed the remaining exit signs can be installed for life fie safety. 30 day TCO authorized for life fire safety, final sign off is contingent upon racking install, life fire safety inspection and completion for racking permit, final placement for ALL fire extinguishers as well as exit signage.
Rod Phone #: ###-####
|
BLD19-03269
| FIRE-Final Inspection | 7/2/2020 | 7/2/2020 | 7/2/2020 1:24:36 PM | A | PASS |
|
|
Fire sprinkler inspection is complete, fire alarm inspection is complete, fire extinguishers are placed with current inspection tags, knox box is located by fire sprinklerriser, fire pump room. Final life fire safety inspection for core and shell complete, signature provided on permit sign off card.
|
FIR20-00393
| INSP-Sprinkler Rough-in | 7/1/2020 | 7/2/2020 | 7/2/2020 12:23:45 PM | A | FAIL |
|
|
Dry pendants are installed on couplings, literature shows dry pendants to be installed in T's, not couplings.
Gabe Torres is the contact. Thanks! (: Phone #: ###-#### Inspection requested via web by Stan Beus
|
FIR20-00429
| INSP-Sprinkler Rough-in | 7/1/2020 | 7/2/2020 | 7/2/2020 11:21:06 AM | A | FAIL |
|
|
Insulation/insulation barrier has been detached from numerous areas, barrier is resting/blocking upright heads throughout tenant space, insulation/insulation barrier needs to be repaired. Provide down grade to flexible dry pendants as shown in installation instructions.
TI Rough-in; Terry Phone #: ###-#### Inspection requested via web by Nathan Stenquist
|
FIR20-00430
| INSP-Sprinkler Rough-in | 7/1/2020 | 7/2/2020 | 7/2/2020 11:20:47 AM | A | FAIL |
|
|
Insulation/insulation barrier has been detached from numerous areas, barrier is resting/blocking upright heads throughout tenant space, insulation/insulation barrier needs to be repaired. Provide down grade to flexible dry pendants as shown in installation instructions.
TI Rough-in; Terry Phone #: ###-#### Inspection requested via web by Nathan Stenquist
|
FIR19-00748
| INSP-Sprinkler Rough-in/Hydro | 7/1/2020 | 7/2/2020 | 7/2/2020 11:20:47 AM | A | DONE |
|
|
Hydrostatic test for overhead fire sprinkler piping witnessed, no pressure loss observed at riser provided gauge.
Shell Hydro; Terry Phone #: ###-#### Inspection requested via web by Nathan Stenquist
|
FIR20-00428
| INSP-Sprinkler Rough-in | 7/1/2020 | 7/2/2020 | 7/2/2020 10:00:50 AM | A | PASS |
|
|
Rough to cover inspection for area of work complete, approved for cover.
Austin Phone #: ###-####
|
FIR19-00702
| INSP-Supply line flush | 7/1/2020 | 7/2/2020 | 7/2/2020 9:46:55 AM | A | DONE |
|
|
Main line flush witnessed.
Scheduled with Pat at Suez for 9:30am pending your availability (did not reach out as you were on vacation) Anthony will check with you early to confirm availability. If time does not work, can be moved to afternoon, Pat is flexible in afternoon (or can be rescheduled for next week if not available) Phone #: ###-#### Inspection requested via web by Anthony Minichiello
|
FIR20-00340
| INSP-Supply line flush | 7/2/2020 | 7/2/2020 | 7/2/2020 9:28:43 AM | A | DONE |
|
|
Re-route supply main flush witnessed via video.
|
FIR20-00340
| INSP-Sprinkler Rough-in | 7/1/2020 | 7/2/2020 | 7/2/2020 9:27:36 AM | A | PART |
|
|
Rough to cover inspection for fire service main underground re-route complete, plans need to reflect re-route before final inspection, re-route approved for cover at contractors descretion provided re-route does not effect water calculations for down-stream fire sprinkler services.
Dustin Phone #: ###-####
|
FIR20-00404
| INSP-Final Inspection | 6/30/2020 | 7/2/2020 | 7/2/2020 8:44:24 AM | A | FAIL |
|
|
Conveyor line did not shut down on fire alarm activation as stated in building permit fire code review comments.
I am trying to get Rick from TVFP at the same time as my FINAL. Please call me early as possible on Thursday so I can get Rick from TVFP on board Phone #: ###-#### Inspection requested via web by Jason Heath
|
FIR20-00274
| INSP-Sprinkler Rough-in | 7/1/2020 | 7/2/2020 | 7/2/2020 8:43:41 AM | A | PART |
|
|
Rough in inspection for paint booth area is complete, sprinklers will be required in second phase of the painting/baking operation.
ADAM IS OUR FOREMAN Phone #: ###-#### Inspection requested via web by Brad Bettencourt
|
FIR20-00274
| INSP-Final Inspection | 7/1/2020 | 7/2/2020 | 7/2/2020 8:43:03 AM | A | PART |
|
|
Final inspection for paint booth area is complete, sprinklers will be required in second phase of the painting/baking operation.ADAM IS OUR FOREMAN Phone #: ###-#### Inspection requested via web by Brad Bettencourt
|
BLD19-03342
| FIRE-Final Inspection | 7/1/2020 | 7/2/2020 | 7/2/2020 8:26:01 AM | A | CANC |
|
|
Building B fire sprinkler final See approved phasing plan approved by the city on 6-15 Call Brandon when on site Phone #: ###-#### >> Inspection requested via web by Brandon Reynolds Inspection cancelled from web by: Brandon Reynolds
|