Inspections for the day of: Tuesday, July 24, 2018.
Number of inspections: 10
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorJim Page
TitleFIRE INSPECTOR
Phone #208-914-5431
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
FIR13-00616 FIR-Aging Inspection7/24/20187/24/20188/1/2018 1:37:05 PM DONE
Final inspection was completed on 11/15/2013
BLD17-03435 FIRE-Final Inspection7/24/20187/24/20187/24/2018 1:23:28 PMPPASS
Fire sprinkler inspection complete, no fire alarm modifications, fire extinguisher will be placed in discussed location. Final life fire safety inspection for area of work complete.

Nate Phone #: ###-####
FIR16-00563 INSP-Sprinkler Rough-in7/24/20187/24/20187/24/2018 1:22:22 PMPPART
Rough to cover inspection for uderground supply complete, approved for cover.
BLD18-00968 FIRE-Final Inspection7/24/20187/24/20187/24/2018 11:44:33 AMPFAIL
Fire alarm work/permit needs to be completed before life fire safety can be completed.

Zac Phone #: ###-####
BLD17-04217 FIRE-Final Inspection7/24/20187/24/20187/24/2018 11:43:52 AMPFAIL
Fire alarm permit needs to be finaled befoe life fire safety inspection can be completed.

Zac Phone #: ###-####
BLD16-03292 FIRE-Final Inspection7/23/20187/24/20187/24/2018 10:28:29 AMAPASS
Final life fire safety inspection complete.

Jeff Phone #: ###-####
FIR18-00492 INSP-Final Inspection7/23/20187/24/20187/24/2018 9:31:24 AMAPASS
Final fire sprinkler inspection for area of work complete.

Phone #: ###-#### Inspection requested via web by Stan Beus
BLD18-01269 FIRE-Final Inspection7/23/20187/24/20187/24/2018 9:30:46 AMAPART
Final life fire safety inspection for restroom remodel on levls 2, 3 and 10 complete, level 12 to be completed at a later date.

Zach Phone #: ###-####
FIR18-00027 INSP-Sprinkler Rough-in7/24/20187/24/20187/24/2018 9:14:00 AMAPASS
Rough to cover inspection for overhead fire sprinkler piping complete for buidling B levels 1, 2 and 3. General contractor needs to provide documentation for foam sheet insulation rating of installed an the deck, a minimum of R-38 is required for freeze protection on level 3, cover is approved at general contractors risk, if sheeting is not R-38 rated then any cover material over fire sprinkler piping will need to be removed and a R-38 or higher rating will need to be installed. Cover is approved for building A for overhead fire sprinkler piping.
FIR18-00027 INSP-Sprinkler Rough-in/Hydro7/23/20187/24/20187/24/2018 9:07:49 AMADONE
Hydrostatic test for overhead fire sprinkler piping witnessed, no pressure loss observed at riser provided gauges.

RANDY IS OUR FOREMAN Phone #: ###-#### Inspection requested via web by Brad Bettencourt