Inspections for the day of: Thursday, July 25, 2019.
Number of inspections: 13
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorJim Page
TitleFIRE INSPECTOR
Phone #208-914-5431
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
FIR19-00479 INSP-Sprinkler Rough-in7/25/20197/25/20197/25/2019 2:41:29 PMPPART
Partial rough to cover inspection for area of work complete, notated city approved drawings areas approved for cover.

Mike Phone #: ###-####
FIR19-00519 INSP-Sprinkler Rough-in7/25/20197/25/20197/25/2019 2:17:02 PMPPASS
Rough to cover inspection for overhead fire sprinkler piping in area of work complete, area of work approved for cover.

Tony Cetani is the contact. Thank you for your hard work! Phone #: ###-#### Inspection requested via web by Stan Beus
FIR16-00804 INSP-Final Inspection7/24/20197/25/20197/25/2019 1:28:38 PMAPASS
Final fire sprinkler inspection for area of work complete.

Please call Clarence Phone #: ###-#### Inspection requested via web by Jessia Maxwell
FIR16-00703 INSP-Final Inspection7/24/20197/25/20197/25/2019 1:28:38 PMAPASS
Final fire sprinkler inspection for area of work complete.

Please call Clarence ###-#### Phone #: ###-#### Inspection requested via web by Jessia Maxwell
FIR16-00553 INSP-Final Inspection7/24/20197/25/20197/25/2019 1:28:38 PMAPASS
Final fire sprinkler inspection for area of work complete.

Please call Clarence at ###-#### Phone #: ###-#### Inspection requested via web by Jessia Maxwell
FIR19-00500 INSP-Final Inspection7/23/20197/25/20197/25/2019 11:37:54 AMAPASS
Final fire alarm inspection for area of work complete.

Please call 1/2 before arriving. Thanks Phone #: ###-#### Inspection requested via web by david davis
FIR19-00449 INSP-Final Inspection7/23/20197/25/20197/25/2019 11:37:34 AMAPASS
Final fire alarm inspection for area of work complete.

Dave Phone #: ###-####
FIR19-00410 INSP-Final Inspection7/24/20197/25/20197/25/2019 11:37:13 AMAPASS
Final fire alarm inspection for area of work complete.

Dave Phone #: ###-####
FIR19-00512 INSP-Final Inspection7/24/20197/25/20197/25/2019 11:36:55 AMAPASS
Final fire alarm inspection for area of work complete.

Dave Phone #: ###-####
BLD19-00278 FIRE-Conference7/24/20197/25/20197/25/2019 9:39:29 AMACANC
Conference cancelled per conversation with point of contact, insulation was not ready, rescheduled for AM on 26JULY2019.

Battered wall insulation at living alcove B108 and outside units B115 and B118 (east side of building). Phone #: ###-#### Inspection requested via web by Corey Hockersmith
FIR19-00358 INSP-Sprinkler Rough-in/Hydro7/24/20197/25/20197/25/2019 9:37:24 AMADONE
24 hour air test has been witnessed, no pressure loss observed.

24 hour air test. Mike Phone #: ###-#### Inspection requested via web by Nathan Stenquist
FIR19-00101 INSP-Final Inspection7/25/20197/25/20197/25/2019 9:02:04 AMAFAIL
Irrigation system is not complete, irrigation will need to be completed to test water flow shutdown to irrigation when flow switch activates during fire sprinkler water flow.

Call James before heading out. Thanks! Phone #: ###-#### Inspection requested via web by Anthony Minichiello
FIR19-00019 INSP-Final Inspection7/25/20197/25/20197/25/2019 9:00:50 AMAFAIL
Wiring for irrigation shutdown has not been installed correctly at sprinkler timer, due to this issue the final inspection for fire sprinklers will not be completed until landscape irrigation is complete and shutdown can be tested, flow switch was not tested.

Call James before heading out, thanks! Phone #: ###-#### Inspection requested via web by Anthony Minichiello