FIR19-00479
| INSP-Sprinkler Rough-in | 7/25/2019 | 7/25/2019 | 7/25/2019 2:41:29 PM | P | PART |
|
|
Partial rough to cover inspection for area of work complete, notated city approved drawings areas approved for cover.
Mike Phone #: ###-####
|
FIR19-00519
| INSP-Sprinkler Rough-in | 7/25/2019 | 7/25/2019 | 7/25/2019 2:17:02 PM | P | PASS |
|
|
Rough to cover inspection for overhead fire sprinkler piping in area of work complete, area of work approved for cover.
Tony Cetani is the contact. Thank you for your hard work! Phone #: ###-#### Inspection requested via web by Stan Beus
|
FIR16-00804
| INSP-Final Inspection | 7/24/2019 | 7/25/2019 | 7/25/2019 1:28:38 PM | A | PASS |
|
|
Final fire sprinkler inspection for area of work complete.
Please call Clarence Phone #: ###-#### Inspection requested via web by Jessia Maxwell
|
FIR16-00703
| INSP-Final Inspection | 7/24/2019 | 7/25/2019 | 7/25/2019 1:28:38 PM | A | PASS |
|
|
Final fire sprinkler inspection for area of work complete.
Please call Clarence ###-#### Phone #: ###-#### Inspection requested via web by Jessia Maxwell
|
FIR16-00553
| INSP-Final Inspection | 7/24/2019 | 7/25/2019 | 7/25/2019 1:28:38 PM | A | PASS |
|
|
Final fire sprinkler inspection for area of work complete.
Please call Clarence at ###-#### Phone #: ###-#### Inspection requested via web by Jessia Maxwell
|
FIR19-00500
| INSP-Final Inspection | 7/23/2019 | 7/25/2019 | 7/25/2019 11:37:54 AM | A | PASS |
|
|
Final fire alarm inspection for area of work complete.
Please call 1/2 before arriving. Thanks Phone #: ###-#### Inspection requested via web by david davis
|
FIR19-00449
| INSP-Final Inspection | 7/23/2019 | 7/25/2019 | 7/25/2019 11:37:34 AM | A | PASS |
|
|
Final fire alarm inspection for area of work complete.
Dave Phone #: ###-####
|
FIR19-00410
| INSP-Final Inspection | 7/24/2019 | 7/25/2019 | 7/25/2019 11:37:13 AM | A | PASS |
|
|
Final fire alarm inspection for area of work complete.
Dave Phone #: ###-####
|
FIR19-00512
| INSP-Final Inspection | 7/24/2019 | 7/25/2019 | 7/25/2019 11:36:55 AM | A | PASS |
|
|
Final fire alarm inspection for area of work complete.
Dave Phone #: ###-####
|
BLD19-00278
| FIRE-Conference | 7/24/2019 | 7/25/2019 | 7/25/2019 9:39:29 AM | A | CANC |
|
|
Conference cancelled per conversation with point of contact, insulation was not ready, rescheduled for AM on 26JULY2019.
Battered wall insulation at living alcove B108 and outside units B115 and B118 (east side of building). Phone #: ###-#### Inspection requested via web by Corey Hockersmith
|
FIR19-00358
| INSP-Sprinkler Rough-in/Hydro | 7/24/2019 | 7/25/2019 | 7/25/2019 9:37:24 AM | A | DONE |
|
|
24 hour air test has been witnessed, no pressure loss observed.
24 hour air test. Mike Phone #: ###-#### Inspection requested via web by Nathan Stenquist
|
FIR19-00101
| INSP-Final Inspection | 7/25/2019 | 7/25/2019 | 7/25/2019 9:02:04 AM | A | FAIL |
|
|
Irrigation system is not complete, irrigation will need to be completed to test water flow shutdown to irrigation when flow switch activates during fire sprinkler water flow.
Call James before heading out. Thanks! Phone #: ###-#### Inspection requested via web by Anthony Minichiello
|
FIR19-00019
| INSP-Final Inspection | 7/25/2019 | 7/25/2019 | 7/25/2019 9:00:50 AM | A | FAIL |
|
|
Wiring for irrigation shutdown has not been installed correctly at sprinkler timer, due to this issue the final inspection for fire sprinklers will not be completed until landscape irrigation is complete and shutdown can be tested, flow switch was not tested.
Call James before heading out, thanks! Phone #: ###-#### Inspection requested via web by Anthony Minichiello
|