BLD19-01828
| FIRE-Final Inspection | 7/29/2020 | 7/29/2020 | 7/29/2020 4:47:03 PM | P | CANC |
|
|
Cancelled per conversation with point of contat due too fire alarm volume issues, alarm vendor is troublshooting to fix.
Phone #: ###-#### Inspection requested via web by Brock Landon
|
FIR19-00681
| INSP-Final Inspection | 7/29/2020 | 7/29/2020 | 7/29/2020 4:46:05 PM | P | CANC |
|
|
Cancelled per conversation with point of contact, still troublshootoing area's were sound exceeds 110db.
SCREENED // James Phone #: ###-####
|
FIR19-00940
| INSP-Sprinkler Rough-in/Hydro | 7/29/2020 | 7/29/2020 | 7/29/2020 4:45:01 PM | P | PART |
|
|
Hydrostaic test for remote FDC and underground supply witnessed, no pressure loss observed at gauge provided on the remote FDC. Could not complete overhead hydro, still have more heads/piping to be installed after finish ceilings.
Overhead rough/hydro, underground hydro, FDC underground hydro, call James to coordinate a time. Thanks! Phone #: ###-#### Inspection requested via web by Anthony Minichiello
|
FIR20-00432
| INSP-Final Inspection | 7/28/2020 | 7/29/2020 | 7/29/2020 11:03:47 AM | A | PASS |
|
|
Previously noted items have been corrected, hood suppression system activation has been witnessed.
Leo- */Screening*/ *Retirement Center unsure if there is a recent case of COVID but inspector should proceed with caution. Phone #: ###-####
|
FIR20-00435
| INSP-Sprinkler Rough-in | 7/28/2020 | 7/29/2020 | 7/29/2020 10:33:04 AM | A | PART |
|
|
Rough in inspection is complete, no tenting installed at time of inspection.
Phone #: ###-#### Inspection requested via web by Jonathan Lee
|
FIR20-00424
| INSP-Sprinkler Rough-in | 7/28/2020 | 7/29/2020 | 7/29/2020 10:32:45 AM | A | PART |
|
|
Rough in inspection is complete, no tenting installed at time of inspection.
Phone #: ###-#### Inspection requested via web by Jonathan Lee
|
FIR20-00434
| INSP-Sprinkler Rough-in | 7/28/2020 | 7/29/2020 | 7/29/2020 10:31:28 AM | A | FAIL |
|
|
Install does not match city approved drawings.
Phone #: ###-#### Inspection requested via web by Jonathan Lee
|
FIR20-00437
| INSP-Sprinkler Rough-in | 7/28/2020 | 7/29/2020 | 7/29/2020 10:30:11 AM | A | FAIL |
|
|
City approved plans not on site at time of inspection.
Phone #: ###-#### Inspection requested via web by Jonathan Lee
|
FIR20-00216
| INSP-Sprinkler Rough-in | 7/28/2020 | 7/29/2020 | 7/29/2020 10:28:22 AM | A | PART |
|
|
Areas approved for cover have been notated on the city approved draiwngs with green highlighter and red ink.
Austin Farnworth is the contact, he has asked that he is called before inspection. Thank you Phone #: ###-#### Inspection requested via web by Stan Beus
|
FIR19-00522
| INSP-Final Inspection | 7/24/2020 | 7/29/2020 | 7/28/2020 3:18:01 PM | A | CANC |
|
|
Please call Mike 1 hr before arriving. Phone #: ###-#### >> Inspection requested via web by James Williams Inspection cancelled from web by: James Williams
|