Inspections for the day of: Wednesday, July 3, 2019.
Number of inspections: 13
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorJim Page
TitleFIRE INSPECTOR
Phone #208-914-5431
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
FIR19-00306 INSP-Sprinkler Rough-in7/3/20197/3/20197/3/2019 2:27:55 PMPPART
Partial rough to cover inspection for overhead fire sprinkler piping in area of work complete, notated city approved drawings areas approved for cover.

Parcel cover job is broke up in phases. Phone #: ###-#### Inspection requested via web by Sam Ball
FIR19-00214 INSP-Final Inspection7/2/20197/3/20197/3/2019 2:26:41 PMPPASS
Final fire sprinkler inspection for area of work complete.

Plans are in Marks office Phone #: ###-#### Inspection requested via web by Sam Ball
BLD18-04518 FIRE-Final Inspection7/2/20197/3/20197/3/2019 1:47:34 PMAFAIL
Need FIR permits for fire sprinkler and fire alarm finaled before life fire safety inspection can be performed.

Ron Phone #: ###-####
FIR19-00232 INSP-Final Inspection7/1/20197/3/20197/3/2019 1:19:01 PMPFAIL
Relocate horn/strobe in mens restroom on level 1 to correct coverage, relocate horn strobe in womans restroom basement level. Provide coverage at west en of basement level corridor. Lower horn strobe in southeast level 1 room. Provide monitoring for PIV. Provide coverage for room off of southeast basement classroom, area is marked storage, room is not a storage room. No device testing was done, need corrections made before sounding alarms.

Final inspection with Shilo Sprinklers ; Crane Alarm
Please call Eric ###-#### with Crane Alarm to confirm actual time.
Requesting for 11:00 am inspection. Phone #: ###-#### Inspection requested via web by Heather Stier
FIR18-00180 INSP-Final Inspection7/2/20197/3/20197/3/2019 1:12:40 PMAFAIL
Notated city approved drawings areas that need to be corrected. Submit plan modification to have sway bracing removed from city approved drawings.

Please call Dillion Phone #: ###-#### Inspection requested via web by Jessia Maxwell
FIR19-00126 INSP-Sprinkler Rough-in/Hydro7/2/20197/3/20197/3/2019 1:08:22 PMADONE
Hydrostatic test for basement level witnessed, no pressure loss observed.

Contact Noemi Carrero ###-#### 30 min prior to Hydro Insp start please.

Thank YOU Phone #: ###-#### Inspection requested via web by Teri Cruickshank
FIR19-00094 INSP-Sprinkler Rough-in/Hydro7/2/20197/3/20197/3/2019 1:07:44 PMAFAIL
Underground supply lost 10PSI during hydro test.

Contact Noemi Carrero - ###-#### 30 min prior to Hydro insp start please

Thank YOU Phone #: ###-#### Inspection requested via web by Teri Cruickshank
FIR19-00258 INSP-Sprinkler Rough-in/Hydro7/2/20197/3/20197/3/2019 11:59:43 AMADONE
Hydrostatic test for overhead fire sprinkler piping witnessed, np pressure loss observed.

Phone #: ###-#### Inspection requested via web by Lonnie Greenfield
FIR18-00834 INSP-Sprinkler Rough-in7/3/20197/3/20197/3/2019 9:29:54 AMPPASS
Rough to cover inspection for remaining underground supply complete, approved for cover.

Bryan Collins is the contact. He has already been in contact with Jim Page who has agreed to have this done today, he just needed the paper trail. Thank you for your hard work! Phone #: ###-#### Inspection requested via web by Stan Beus
FIR19-00404 INSP-Sprinkler Rough-in7/3/20197/3/20197/3/2019 9:14:46 AMAPASS
Rough to cover ispection for overhead fire sprinkler piping complete, all tenting in place at time of insulation, approved for cover.
FIR19-00404 INSP-Sprinkler Rough-in/Hydro7/2/20197/3/20197/3/2019 9:13:20 AMADONE
Hydrostatic test for overhead fire sprinkler piping witnessed at 150PSI, above what is required by 13D, no pressure loss observed.

Gabe Garduno is the contact. Thank you for your hard work! Phone #: ###-#### Inspection requested via web by Stan Beus
BLD18-02797 FIRE-Conference7/2/20197/3/20197/3/2019 8:25:34 AMADONE
Fire conference is complete, items that are not associated with construction are not to be stored in the warehouse. As of this entry the racking permit has not been inspected, the fire alarms cannot be completed due to the fire alarm permit being under review and no life fire safety inspection has been performed. I spoke with Ron Johnson with Boise Fire Department and he agrees with my decision.

call ahead // Mike Phone #: ###-####
FIR19-00112 INSP-Final Inspection6/26/20197/3/20197/3/2019 8:04:51 AMACANC
Inspection request will be rescheduled per conversation with point of contact, the 7AM inspection time was not cooodinated, need a minimum of a 24 hour notice with my approval as well as my supervisors approval for inspections outside of my normal working hours. Next inspection needs to be coordinated or it will result in a fail, this request is cancelled.

Requesting inspection at 7AM - John Howard, Technician Phone #: ###-#### Inspection requested via web by John Siewert