BLD19-01454
| FIRE-Final Inspection | 8/12/2019 | 8/12/2019 | 8/12/2019 4:37:05 PM | P | PASS |
|
|
No fire sprinklers, no fire alarms, fire extinguishers are placed with current inspection tags. Final life fire safety inspection for area of work complete.
Mike Phone #: ###-####
|
FIR19-00059
| INSP-Final Inspection | 8/12/2019 | 8/12/2019 | 8/12/2019 2:47:37 PM | P | FAIL |
|
|
Provide freeze protection for fire sprinkler piping in storage closets. Storage closets have exposed CPVC, exposed CPVC is not allowed per manufacture specs. Provide signage for FDC bell as required.
Kristin Phone #: ###-####
|
FIR19-00060
| INSP-Final Inspection | 8/12/2019 | 8/12/2019 | 8/12/2019 2:45:21 PM | P | FAIL |
|
|
Last inspection request was on 21MAY2019 for cover, notes indicate cover was not approved due too no tenting being installed, cover material has been installed and according to the last entry, cover was not approved.
Kristin Phone #: ###-####
|
FIR19-00221
| INSP-Sprinkler Rough-in | 8/12/2019 | 8/12/2019 | 8/12/2019 2:06:50 PM | P | PART |
|
|
Partial rough to cover inspection for level 2 complete for tenting and soffits, notated city approved drawings with yellow highlighter and red ink areas approved for cover.
Rick Phone #: ###-####
|
BLD19-02432
| FIRE-Final Inspection | 8/12/2019 | 8/12/2019 | 8/12/2019 1:15:11 PM | P | PASS |
|
|
No fire sprinklers, no fire alarms, fire extinguisher will be mounted in discussed location, door hardware is existing. Final life fire safety inspection for water damage repair complete.
Chris Phone #: ###-####
|
BLD17-02261
| FIRE-Conference | 8/12/2019 | 8/12/2019 | 8/12/2019 12:49:15 PM | P | DONE |
|
|
Fire conference complete, discussed required life safety items that will need to be completed, discussed required items for possible TCO.
fire life safety // Curtis Phone #: ###-####
|
FIR19-00436
| INSP-Final Inspection | 8/12/2019 | 8/12/2019 | 8/12/2019 11:29:34 AM | P | FAIL |
|
|
As discussed with Clint, Fire alarm install does not match city approved drawings, all sprinkler related devices are shown in the fire sprinkler riser room on level 1, tampers and flow for level 2 have been relocated to level 2, not on level 1 as shown on city approved drawings, instructed Clint on 09AUG2019 that city approved drawings need to be updated showing the change in order to complete inspections.
kristen Phone #: ###-####
|
FIR19-00061
| INSP-Sprinkler Rough-in | 8/12/2019 | 8/12/2019 | 8/12/2019 11:25:44 AM | P | FAIL |
|
|
As stated with Clint, fire sprinkler plans are under review, plan mods on 01MAY2019 and 07AUG2019 were both failed, no inspection will be performed until plans are back in issued status and modification does not result in a failure.
kristen Phone #: ###-####
|
BLD19-00261
| FIRE-Final Inspection | 8/9/2019 | 8/12/2019 | 8/12/2019 10:24:45 AM | A | PASS |
|
|
Fire sprinkler inspection has been completed, no fire alarm modifications, fire extinguishers are placed with current inspection tags. Final life fire safety inspection for area of work complete.
Jason Phone #: ###-####
|
BLD19-02784
| FIRE-Final Inspection | 8/9/2019 | 8/12/2019 | 8/12/2019 9:49:14 AM | A | PASS |
|
|
Fire sprinkler annual inspection is complete with no fire sprinkler modifications, fire alarm monitoring is active with no fire alarm modifications, fire extinguishers are placed with current inspection tags. Final life fire safety inspection for area of work complete.
Ali Phone #: ###-####
|
BLD19-01002
| FIRE-Final Inspection | 8/11/2019 | 8/12/2019 | 8/12/2019 9:31:43 AM | A | PASS |
|
|
Previously noted items have been corrected, no fire sprinklers, no fire alarms, fire extinguishers are placed with current inspection tags, addressing will be installed before BLD final. Final life fire safety inspection for area of work complete.
Kris will be the contact for this inspection. Phone #: ###-#### Inspection requested via web by Ryan Allen
|
FIR19-00531
| INSP-Sprinkler Rough-in | 8/9/2019 | 8/12/2019 | 8/12/2019 9:14:00 AM | A | PART |
|
|
Previously noted item for bury depth of IBR corrected, IBR is below 4foot 6 inches, IBR approved for cover, remaining undergorund to be installed at a later date.
Inspection of 6” In Building Riser. Please contact Matt Barnard one hour prior to showing up at Phone #: ###-#### Inspection requested via web by Matt Barnard
|
BLD18-00776
| FIRE-Final Inspection | 8/9/2019 | 8/12/2019 | 8/12/2019 8:26:49 AM | A | FAIL |
|
|
Project related FIR permits need to inspected and finaled before life fire safety. Informed point of contact on 09AUG2019 that the fire hydrant on the southeast side of project is pointed the wrong way, steamer connection needs to be pointing at the fire lane, response was "I think that was the school disticts scope". Fire hydrants are on page A1.01 and are part of the new scope of work. Hydrant on the northwest side is in different location than what is shown on the city approved drawings. No other items inspected at this time.
Ron Phone #: ###-####
|
FIR18-00678
| INSP-Final Inspection | 8/9/2019 | 8/12/2019 | 8/9/2019 11:54:11 AM | A | CANC |
|
|
Phone #: ###-#### >> Inspection requested via web by Connie Danes Inspection cancelled from web by: Connie Danes
|
FIR18-00935
| INSP-Final Inspection | 8/7/2019 | 8/12/2019 | 8/9/2019 11:09:48 AM | A | CANC |
|
|
Please call Nate at ###-#### with inspection time. Phone #: ###-#### >> Inspection requested via web by Lori Brungardt Inspection cancelled from web by: Lori Brungardt
|