Inspections for the day of: Tuesday, August 13, 2019.
Number of inspections: 31
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorJim Page
TitleFIRE INSPECTOR
Phone #208-914-5431
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
FIR19-00584 INSP-Sprinkler Rough-in8/13/20198/13/20198/13/2019 4:05:48 PMPPASS
Rough to cover inspection for overhead fire sprinkler piping in area of work complete, approved for cover.

Phone #: ###-#### Inspection requested via web by Sam Ball
BLD19-02534 FIRE-Final Inspection8/13/20198/13/20198/13/2019 2:54:09 PMPPASS
Previously noted item for fire sprinkler repair has been completed. Fire sprinkler modifications complete, no fire alarm modifications, fire extinguisher is placed with a current inspection tag. Final life fire safety inspection for area of work complete.

call for access- Jay Phone #: ###-####
FIR16-00809 INSP-Final Inspection8/13/20198/13/20198/13/2019 2:50:25 PMPPASS
Final fire sprinkler inspection for area of work complete, plastic sheeting that was placed on sprinkler heads to protect from fire proofing was still in place in numerous locations, plastic sheeting will need to be removed before life fire safety inspection.
FIR16-00809 INSP-Sprinkler Rough-in/Hydro8/13/20198/13/20198/13/2019 2:49:02 PMPDONE
Hydrostatic test for this system has been witnessed, no pressure loss was observed.
FIR16-00809 INSP-Sprinkler Rough-in8/13/20198/13/20198/13/2019 2:48:32 PMPPASS
Rough in inspection for this system has been completed.
FIR16-00808 INSP-Final Inspection8/13/20198/13/20198/13/2019 2:48:02 PMPPASS
Final fire sprinkler inspection for scope of work complete.
FIR17-00089 INSP-Final Inspection8/13/20198/13/20198/13/2019 2:43:53 PMPPASS
Final fire sprinkler inspection for scope of work has been completed. Drop downs have been added for future obstruction install, as of these notes it is not clear when obstructions will be placed, a seperate permit will be requested when obstructions are designed and placed. A temp overhead door has been added as well as an open vent grate on the exterior wall, need coverage under overhead door and verify that the sprinkler piping next to open exterior vent will not freeze due to vent being exposed to outside atmosphere. Noted items will need to be addressed before life fire safety inspection. A seperate permit will be required for items noted.
FIR17-00089 INSP-Sprinkler Rough-in/Hydro8/13/20198/13/20198/13/2019 2:39:43 PMPDONE
Hydrostatic test for this system has been witnessed, no pressure loss was observed.
FIR17-00089 INSP-Sprinkler Rough-in8/13/20198/13/20198/13/2019 2:39:11 PMPPASS
Rough in inspection for this system has been completed. Drop downs for obstruction coverage are in place but obstructions have not been installed.
FIR17-00754 INSP-Final Inspection8/12/20198/13/20198/13/2019 2:34:50 PMAPASS
Final fire sprinkler inspection for scope of work has been completed. Piping and ductwork obstructions have been added that were not part of the original scope of work, obstructions will need coverage before life fire safety inspection, a seperate permit will be required for obstruction coverage.

Clarence Phone #: ###-#### Inspection requested via web by Jessia Maxwell
FIR17-00774 INSP-Final Inspection8/12/20198/13/20198/13/2019 2:34:29 PMAPASS
Final fire sprinkler inspection for scope of work has been completed. Sprinkler head under added ductwork that was outside scope of work will need to be added before life fire safety final, a seperate permit will be required for obstruction coverage.

CLarence Phone #: ###-####
FIR17-00300 INSP-Final Inspection8/12/20198/13/20198/13/2019 2:28:18 PMAPASS
Final fire sprinkler inspection for scope of work complete.

Clarence Phone #: ###-#### Inspection requested via web by Jessia Maxwell
FIR17-00301 INSP-Final Inspection8/12/20198/13/20198/13/2019 2:27:34 PMAPASS
Final inspection for scope of work has been completed. Catwalks have been added that were outside the scope of work, fire sprinkler coverage will be required for life fire safety to be completed, a seperate permit will be required for obstruction coverage.

Clarence Phone #: ###-#### Inspection requested via web by Jessia Maxwell
FIR18-00424 INSP-Final Inspection8/12/20198/13/20198/13/2019 2:08:39 PMAPASS
Final fire sprinkler inspection for area of work complete.

Clarence Phone #: ###-#### Inspection requested via web by Jessia Maxwell
FIR18-00424 INSP-Sprinkler Rough-in8/13/20198/13/20198/13/2019 2:08:12 PMAPASS
Rough in inspection for area of work has been completed.
FIR17-00754 INSP-Sprinkler Rough-in8/13/20198/13/20198/13/2019 2:07:11 PMAPASS
Rough in inspection for this system has been completed.
FIR17-00754 INSP-Sprinkler Rough-in/Hydro8/13/20198/13/20198/13/2019 2:06:38 PMADONE
Hydrostatic test for this system has been witnessed, no pressure loss was observed.
FIR17-00774 INSP-Sprinkler Rough-in8/13/20198/13/20198/13/2019 2:05:17 PMAPASS
Rough in inpsection for this system has been completed.
FIR17-00774 INSP-Sprinkler Rough-in/Hydro8/13/20198/13/20198/13/2019 2:04:49 PMADONE
Hydrostatic test for this system has been witnessed, no pressure loss was observed.
FIR17-00301 INSP-Sprinkler Rough-in/Hydro8/13/20198/13/20198/13/2019 2:03:08 PMADONE
Hydrostatic test for this system has been witnessed, no pressure loss was observed.
FIR17-00301 INSP-Sprinkler Rough-in8/13/20198/13/20198/13/2019 2:02:37 PMAPASS
Rough in inspection for this system has been completed.
FIR17-00300 INSP-Sprinkler Rough-in/Hydro8/13/20198/13/20198/13/2019 2:01:10 PMADONE
Hydrostatic test for this system has been witnessed, no pressure loss was observed.
FIR17-00300 INSP-Sprinkler Rough-in8/13/20198/13/20198/13/2019 2:00:39 PMAPASS
Rough in inspection for this system has been completed.
FIR17-00287 INSP-Final Inspection8/12/20198/13/20198/13/2019 1:59:09 PMAPASS
Final fire sprinkler inspection for area of work complete.

Clarence 51 Deluge Phone #: ###-#### Inspection requested via web by Jessia Maxwell
FIR17-00287 INSP-Sprinkler Rough-in8/13/20198/13/20198/13/2019 1:58:45 PMAPASS
Rough in inspection for this system has been completed.
FIR17-00287 INSP-Sprinkler Rough-in/Hydro8/13/20198/13/20198/13/2019 1:58:20 PMADONE
Hydrostatic test has been witnessed for this system, no pressure loss was observed.
BLD19-00278 FIRE-Conference8/13/20198/13/20198/13/2019 1:44:55 PMPDONE
Northwest battered wall filled with insulation, this battered wall is the last battered wall for inspection, approved for cover, as-builts for fire sprinklers needs to show the deleted fire sprinklers where insualtion was placed in the battered walls.

Battered wall insulation at northwest corner. Phone #: ###-#### Inspection requested via web by Corey Hockersmith
BLD17-02261 FIRE-Conference8/13/20198/13/20198/13/2019 12:56:54 PMADONE
Fire conference is complete, note number 11 on building permit fire review comments mentions no parking signage being installed on the west side of 25th, west side of 25th is under a seperate permit with a different general contractor, this permit was issued after the review was completed for this project, follow up for signage will be done on the St. Lukes project which is on the west side of 25th, signage will not be required for this life fire safety inspection.
FIR19-00572 INSP-Sprinkler Rough-in8/12/20198/13/20198/13/2019 11:05:39 AMAPASS
Rough to cover inspection for overhead fire sprinkler piping in area of work complete, area of work approved for cover.

Peyton Phone #: ###-####
BLD19-01449 FIRE-Conference8/12/20198/13/20198/13/2019 10:07:06 AMADONE
Fire conference complete.

Could you please call and give me a 30 minute heads up when you are on your way? Phone #: ###-#### Inspection requested via web by Dirk Dunham
FIR19-00254 INSP-Sprinkler Rough-in8/12/20198/13/20198/13/2019 9:45:45 AMAPASS
Correctionhas been made, approved for cover.

Call James for more info. Tenting re-inspection at entry due to proximity of pipe to exterior deck above. Phone #: ###-#### Inspection requested via web by Anthony Minichiello