FIR15-00485
| INSP-Final Inspection | 9/15/2015 | 9/15/2015 | 9/15/2015 3:49:00 PM | A | PART |
|
|
Partial fire sprinkler inspection passed/complete per this scope of work associated with this FIR permit.
The work that was submitted, approved and installed was ok. However, additional sprinklers are required to protect inside equipment and below equipment which was not shown on the drawings. A plan mod is required. TRF 9/16/2015
|
FIR15-00504
| INSP-Final Inspection | 9/15/2015 | 9/15/2015 | 9/15/2015 3:47:39 PM | P | FAIL |
|
|
Space above commercial hood not protected, exposed combustible material in pocket, needs fire sprinkler heads installed to protect area.
|
BLD15-02460
| FIRE-Final Inspection | 9/15/2015 | 9/15/2015 | 9/15/2015 2:14:02 PM | P | PASS |
|
|
Life fire safety passed/complete
|
FIR12-00323
| FIR-Aging Inspection | 9/15/2015 | 9/15/2015 | 9/15/2015 2:13:00 PM | | CANC |
|
|
|
FIR15-00568
| INSP-Final Inspection | 9/15/2015 | 9/15/2015 | 9/15/2015 2:11:04 PM | P | PASS |
|
|
Final fire sprinkler inspection passed/complete
|
BLD14-03551
| FIRE-Final Inspection | 9/14/2015 | 9/15/2015 | 9/15/2015 1:58:41 PM | A | PASS |
|
|
Life fire safety passed/complete
|
BLD15-02423
| FIRE-Final Inspection | 9/15/2015 | 9/15/2015 | 9/15/2015 1:43:58 PM | A | PASS |
|
|
Life fire safety passed/complete
|
FIR15-00088
| INSP-Sprinkler Rough-in | 9/14/2015 | 9/15/2015 | 9/15/2015 10:22:30 AM | A | PART |
|
|
Rough in inspection passed/complete, first floor and basement level approved for cover, need to verify insulation installation on upper level before cover can be approved.
|
BLD15-02501
| FIRE-Final Inspection | 9/14/2015 | 9/15/2015 | 9/15/2015 8:25:42 AM | A | PASS |
|
|
Life fire safety passed/complete
|