BLD19-01427
| FIRE-Conference | 9/25/2019 | 9/25/2019 | 9/25/2019 3:47:51 PM | P | DONE |
|
|
Fire conference complete.
call to meet // Jon Phone #: ###-####
|
FIR19-00331
| INSP-Sprinkler Rough-in | 9/25/2019 | 9/25/2019 | 9/25/2019 3:47:06 PM | P | CANC |
|
|
Duplicate inspection request, this request is cancelled.
Randy Phone #: ###-####
|
FIR19-00331
| INSP-Sprinkler Rough-in | 9/25/2019 | 9/25/2019 | 9/25/2019 3:46:19 PM | P | PASS |
|
|
Rough to cover inspection for remaining overhead fire sprinkler piping in area of work complete, approved for cover.
Randy Phone #: ###-####
|
BLD19-03648
| FIRE-Final Inspection | 9/25/2019 | 9/25/2019 | 9/25/2019 3:12:00 PM | P | FAIL |
|
|
Provide fire extinguisher as stated on city approved drawings. Provide sprinkler escutcheon in restroom, escutcheon is missing. Remove thumb-turn deadbolt on rear exit door, door hardware must comply with the 2015 Intenational fire code, section 1010.1.9.1.
ins Scott Phone #: ###-####
|
FIR19-00583
| INSP-Sprinkler Rough-in | 9/24/2019 | 9/25/2019 | 9/25/2019 11:35:08 AM | A | PASS |
|
|
Previously noted items have been corrected, rough to cover inspection is complete, approved for cover.
Contact Noemi Carerro 208###-#### 30 min prior to RTC insp start please.
Thank YOU Phone #: ###-#### Inspection requested via web by Teri Cruickshank
|
FIR19-00702
| INSP-Sprinkler Rough-in/Hydro | 9/24/2019 | 9/25/2019 | 9/25/2019 11:34:32 AM | A | DONE |
|
|
Hydrostatic test for underground supply witnessed, no pressure loss observed.
Underground rough ; hydro - call James before heading out! Phone #: ###-#### Inspection requested via web by Anthony Minichiello
|
FIR19-00702
| INSP-Sprinkler Rough-in | 9/25/2019 | 9/25/2019 | 9/25/2019 11:33:51 AM | A | PASS |
|
|
Rough to cover inspection for underground supply complete, approved for cover.
|
FIR19-00682
| INSP-Sprinkler Rough-in | 9/23/2019 | 9/25/2019 | 9/25/2019 10:35:59 AM | A | FAIL |
|
|
2 pendant heads are less than 4 inches from wall, a minimum of 4 inches is required per NFPA 13. All insulation needs to be in place and secured, insulation is blocking some of the upright heads.
Call before heading out, thanks! Phone #: ###-#### Inspection requested via web by Anthony Minichiello
|
FIR19-00672
| INSP-Sprinkler Rough-in | 9/25/2019 | 9/25/2019 | 9/25/2019 10:18:27 AM | P | PASS |
|
|
Plan mods have been accepted, all tenting is in place, cover is approved for overhead fire sprinkler piping.
Gabe Garduno is the contact. Thank you for your hard work! Phone #: ###-#### Inspection requested via web by Stan Beus
|
FIR19-00540
| INSP-Sprinkler Rough-in | 9/24/2019 | 9/25/2019 | 9/25/2019 10:13:36 AM | A | PART |
|
|
Tenting inspection for units 1 and 2, starting from the southside complete, approved for cover, Remaining living units to be inspected at a later date.
Robert Chambers is the contact. This rough-in is for the 3rd floor. Thank you for your hard work! Phone #: ###-#### Inspection requested via web by Stan Beus
|
FIR19-00562
| INSP-Sprinkler Rough-in | 9/24/2019 | 9/25/2019 | 9/25/2019 10:11:53 AM | A | PASS |
|
|
Rough to cover inspection for overhead fire sprinkler pipng above hardlids complete, hardlids approved for cover.
TOM Phone #: ###-####
|
FIR19-00590
| INSP-Final Inspection | 9/24/2019 | 9/25/2019 | 9/24/2019 2:56:54 PM | A | PASS |
|
|
Final fire alarm inspection for area of work complete.
|