Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
FIR19-00111 INSP-Sprinkler Rough-in/Hydro9/6/20199/6/20199/6/2019 3:09:26 PMPDONE
Hydrostatic test for FDC witnessed, no pressure loss observed.

Contact Noemi Carrero ###-#### 30 Min Prior to Hydro on FDC Insp please.

Thank YOU Phone #: ###-#### Inspection requested via web by Teri Cruickshank
FIR18-00883 INSP-Final Inspection9/6/20199/6/20199/6/2019 3:09:26 PMPPASS
Final inspection for underground supply complete.

Contact Noemi Carrero ###-#### 30 min prior to UG Final Insp start please

Thank YOU Phone #: ###-#### Inspection requested via web by Teri Cruickshank
BLD19-01975 FIRE-Final Inspection9/6/20199/6/20199/6/2019 2:03:36 PMPPASS
Fire sprinkler inspection is complete, fire alarm inspection is complete, fire extinguishers are placed with current inspection tags. 2 Heat detectors have been installed in the penthouse per the alternate agreement to allow fire sprinklers to be omitted from penthouse. Final life fire safety inspection for area of work complete, signatures provided for inspected trades on signature card.

Phone #: 2083188954 >> Inspection requested via mobile web by Jim Douglas
FIR19-00543 INSP-Final Inspection9/5/20199/6/20199/6/2019 2:02:54 PMAPASS
Previously noted items have been corrected, final fire alarm inspection is complete.

2 Heat detectors have been installed in the penthouse per the alternate agreement to allow fire sprinklers to be omitted from penthouse.

Call ahead as I am not sure which tech will still be onsite. Phone #: ###-#### Inspection requested via web by Kristin Dolan
FIR19-00667 INSP-Final Inspection9/6/20199/6/20199/6/2019 1:50:51 PMPPASS
Final fire alarm inspection for scope of work complete.

Inspection of 2 existing supervisory duct detectors and HVAC shutdown. Call Joe Hobbs @ ###-#### for jobsite. Phone #: ###-#### Inspection requested via web by Philip Williams
FIR19-00664 INSP-Sprinkler Rough-in9/6/20199/6/20199/6/2019 1:50:24 PMPPASS
Rough to cover inspection for scope of work complete, approved for cover.

Phone #: ###-#### Inspection requested via web by Sam Ball
FIR18-00633 INSP-Final Inspection9/5/20199/6/20199/6/2019 1:32:20 PMPCANC
Fire alarm system was not ready to test devices, inspection will need to be rescheduled, this request is cancelled.

Kenny Caldwell is the contact for this final inspection. We appreciate your help. Thank you. Phone #: ###-#### Inspection requested via web by Stan Beus
FIR18-00360 INSP-Final Inspection9/5/20199/6/20199/6/2019 1:31:42 PMPFAIL
Walkthrough on level 1 performed, notated city approved drawings with red ink areas requiring correction, inspection stopped on level 1 due to amount of items marked. No sprinkler monitoring devices or initiating devices tested.

David Phone #: ###-####
FIR18-00398 INSP-Final Inspection9/5/20199/6/20199/6/2019 1:29:26 PMPPASS
Final inspection for underground supply complete.

Kenny Caldwell is the contact for this final inspection. Thanks for your help. Phone #: ###-#### Inspection requested via web by Stan Beus
FIR19-00006 INSP-Final Inspection9/5/20199/6/20199/6/2019 10:38:53 AMACANC
Cancelled per conversation with point of contact, hole for sprinkler head relocate has not been patched, inspection request will be rescheduled for a later date.

Call Anthony before heading out, thanks! Phone #: ###-#### Inspection requested via web by Anthony Minichiello
BLD18-02872 FIRE-Final Inspection9/4/20199/6/20199/6/2019 10:11:27 AMAFAIL
Ceilings have been removed in 3 areas, pendant fire sprinkler heads still in place, pendant heads need to be removed and plugged, a permit will be required for any sprinkler modifications. Fire extinguisher needs to have annual inspection performed and tagged with a current inspection tag.

Rachel Phone #: ###-####
FIR19-00237 INSP-Final Inspection9/5/20199/6/20199/6/2019 8:56:08 AMAPART
Partial final inspection for overhead fire sprinklers complete, fire panel is new so tampers and flow switch need to be coordinated with the fire alarm vendor to inspect/verify monitoring.

Contact Tyler Loomis ###-#### pleae Text or email tylerloomis50@gmail.com 30 min prior to Final Insp please.

Thank YOU Phone #: ###-#### Inspection requested via web by Teri Cruickshank
BLD19-01714 FIRE-Final Inspection9/5/20199/6/20199/6/2019 8:22:08 AMAPASS
No fire sprinklers, no fire alarms, hood suppression system inspection has been completed, fire extinguisher is mounted with a current inspection tag, thumb turn deadbolt on main door to be changed out before BLD final. Final life fire safety inspection for area of work complete.

Dale Phone #: ###-####