Inspections for the day of: Thursday, January 3, 2019.
Number of inspections: 20
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorBrandon Shaw
TitleBLD-COM/RES INSPECTOR
Phone #208-954-9358
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
BLD18-01491 BLD-Footing1/3/20191/3/20191/3/2019 5:02:12 PMPPASS
Frost protection is required...
BLD18-03097 BLD-Energy code compliance1/2/20191/3/20191/3/2019 5:01:39 PMPPASS
Corrections SAT...
BLD18-01002 BLD-Framing/Rough-in1/3/20191/3/20191/3/2019 5:01:15 PMPPEND
OK to insulate pending..."cpvc piping compatibility with the insulation spray foam needs to be verified prior to cover on any of the vertical sprinkler lines." As per Troy Cobbley...
BLD18-01611 BLD-Final1/3/20191/3/20191/3/2019 4:58:44 PMPPASS
Phone #: ###-#### Inspection requested via web by Gus Brandon
BLD18-01611 DOC - Permit Finaled1/3/20191/3/20191/3/2019 4:58:33 PMPPASS
BLD18-01611 BLD-Blower Door Test Results1/3/20191/3/20191/3/2019 4:58:26 PMPDONE
ACH50- 3.79
BLD18-01167 BLD-Final1/2/20191/3/20191/3/2019 4:57:41 PMPPASS
Phone #: ###-#### Inspection requested via web by Gus Brandon
BLD18-01167 DOC - Permit Finaled1/3/20191/3/20191/3/2019 4:57:33 PMPPASS
BLD18-01167 BLD-Blower Door Test Results1/2/20191/3/20191/3/2019 4:57:25 PMPDONE
ACH50- 3.46
BLD18-01211 BLD-Final1/2/20191/3/20191/3/2019 4:57:05 PMPPASS
Phone #: ###-#### Inspection requested via web by Gus Brandon
BLD18-01211 DOC - Permit Finaled1/3/20191/3/20191/3/2019 4:56:57 PMPPASS
BLD18-01211 BLD-Blower Door Test Results1/2/20191/3/20191/3/2019 4:56:49 PMPDONE
ACH50- 3.19
BLD18-01032 BLD-Blower Door Test Results1/3/20191/3/20191/3/2019 12:16:10 PMPCANC
Phone #: ###-#### Inspection requested via web by Kyle Seick
BLD18-01032 BLD-Final1/3/20191/3/20191/3/2019 12:15:56 PMPNR
Ned PLM final
BLD18-03805 BLD-Energy code compliance1/2/20191/3/20191/3/2019 12:08:33 PMAPEND
Pending Mech rough and cover appoval...
BLD18-03043 BLD-Ceiling Grid Inspection1/2/20191/3/20191/3/2019 12:07:55 PMAPASS
Soffit
BLD18-00505 BLD-Framing/Rough-in1/3/20191/3/20191/3/2019 12:07:37 PMAPASS
OK to insulate
BLD18-00498 BLD-Framing/Rough-in1/3/20191/3/20191/3/2019 12:07:15 PMAPASS
OK to insulate
BLD18-00494 BLD-Energy code compliance1/2/20191/3/20191/3/2019 12:06:33 PMAPART
Section C energy code compliance
BLD06-02316 BLD-Footing1/2/20191/3/20191/3/2019 11:13:29 AMAPART
OK pending STRATA special insp. tests and approvals.