BLD18-02427
| BLD-Footing | 10/8/2018 | 10/8/2018 | 10/8/2018 4:59:03 PM | P | PASS |
|
|
Work in progress
|
BLD18-01281
| BLD-Final | 10/8/2018 | 10/8/2018 | 10/8/2018 4:58:37 PM | P | FAIL |
|
|
Need trades finaled, no walk thru at this time...
|
BLD18-02933
| BLD-Wall Bracing | 10/8/2018 | 10/8/2018 | 10/8/2018 4:57:58 PM | P | PASS |
|
|
Eric Phone #: ###-####
|
BLD18-02004
| BLD-Final | 10/8/2018 | 10/8/2018 | 10/8/2018 4:57:43 PM | P | PEND |
|
|
Original permit OK... Proposed covered patio to be added to permit and constructed at a later date...
|
BLD18-00887
| BLD-Framing/Rough-in | 10/8/2018 | 10/8/2018 | 10/8/2018 4:54:26 PM | P | PART |
|
|
Ok to cover exterior walls and exterior sides of ceiling "clouds", Fire sprinkler rough in needs to be inspected...
|
BLD18-02045
| BLD-Wall Bracing | 10/8/2018 | 10/8/2018 | 10/8/2018 2:25:15 PM | P | PART |
|
|
Work in progress- Misiing hold downs to be installed before framing rough-in...
|
BLD18-03290
| BLD-Wall Bracing | 10/5/2018 | 10/8/2018 | 10/8/2018 11:39:16 AM | A | PART |
|
|
Work in progress- 3x3 nailing grid and 2x2 washers needed
|
BLD18-03189
| BLD-Foundation | 10/7/2018 | 10/8/2018 | 10/8/2018 11:38:05 AM | A | CANC |
|
|
Wrong permit
|
BLD17-03890
| BLD-Wall Bracing | 10/5/2018 | 10/8/2018 | 10/8/2018 11:37:35 AM | A | PART |
|
|
Work in progress- hold downs and floor to floor straps
|
BLD18-01281
| BLD-Final | 10/5/2018 | 10/8/2018 | 10/8/2018 10:54:22 AM | A | CANC |
|
|
Joel Phone #: ###-####
|
BLD18-01292
| BLD-Final | 10/5/2018 | 10/8/2018 | 10/8/2018 10:51:57 AM | A | PASS |
|
|
Brad Phone #: ###-####
|
BLD18-01292
| DOC - Permit Finaled | 10/8/2018 | 10/8/2018 | 10/8/2018 10:51:47 AM | P | PASS |
|
|
|
BLD18-01279
| BLD-Energy code compliance | 10/5/2018 | 10/8/2018 | 10/8/2018 10:51:34 AM | A | PASS |
|
|
Phone #: ###-#### Inspection requested via web by Braxton Hansen
|