Inspections for the day of: Monday, October 8, 2018.
Number of inspections: 13
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorBrandon Shaw
TitleBLD-COM/RES INSPECTOR
Phone #208-954-9358
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
BLD18-02427 BLD-Footing10/8/201810/8/201810/8/2018 4:59:03 PMPPASS
Work in progress
BLD18-01281 BLD-Final10/8/201810/8/201810/8/2018 4:58:37 PMPFAIL
Need trades finaled, no walk thru at this time...
BLD18-02933 BLD-Wall Bracing10/8/201810/8/201810/8/2018 4:57:58 PMPPASS
Eric Phone #: ###-####
BLD18-02004 BLD-Final10/8/201810/8/201810/8/2018 4:57:43 PMPPEND
Original permit OK...
Proposed covered patio to be added to permit and constructed at a later date...
BLD18-00887 BLD-Framing/Rough-in10/8/201810/8/201810/8/2018 4:54:26 PMPPART
Ok to cover exterior walls and exterior sides of ceiling "clouds", Fire sprinkler rough in needs to be inspected...
BLD18-02045 BLD-Wall Bracing10/8/201810/8/201810/8/2018 2:25:15 PMPPART
Work in progress- Misiing hold downs to be installed before framing rough-in...
BLD18-03290 BLD-Wall Bracing10/5/201810/8/201810/8/2018 11:39:16 AMAPART
Work in progress- 3x3 nailing grid and 2x2 washers needed
BLD18-03189 BLD-Foundation10/7/201810/8/201810/8/2018 11:38:05 AMACANC
Wrong permit
BLD17-03890 BLD-Wall Bracing10/5/201810/8/201810/8/2018 11:37:35 AMAPART
Work in progress- hold downs and floor to floor straps
BLD18-01281 BLD-Final10/5/201810/8/201810/8/2018 10:54:22 AMACANC
Joel Phone #: ###-####
BLD18-01292 BLD-Final10/5/201810/8/201810/8/2018 10:51:57 AMAPASS
Brad Phone #: ###-####
BLD18-01292 DOC - Permit Finaled10/8/201810/8/201810/8/2018 10:51:47 AMPPASS
BLD18-01279 BLD-Energy code compliance10/5/201810/8/201810/8/2018 10:51:34 AMAPASS
Phone #: ###-#### Inspection requested via web by Braxton Hansen