BLD18-01946
| BLD-Framing/Rough-in | 11/26/2018 | 11/26/2018 | 11/26/2018 4:51:56 PM | P | FAIL |
|
|
No plans... No truss engineering... No air/foam seal...
|
BLD18-00094
| BLD-Energy code compliance | 11/26/2018 | 11/26/2018 | 11/26/2018 4:51:02 PM | P | PASS |
|
|
Marla (or alt. contact is Ella ###-####) Phone #: ###-####
|
BLD18-03153
| BLD-Framing/Rough-in | 11/26/2018 | 11/26/2018 | 11/26/2018 4:50:35 PM | P | FAIL |
|
|
Anchor bolts to be with in 12" of sill plate ends, 4 locations... Shear edge nailing missed, 2nd floor SW corner... A7 2 ply truss- fastener schedule, bottom cord, 3 rows, 2" O.C... See Red Paint OK to insulate
|
BLD18-04121
| BLD-Final | 11/21/2018 | 11/26/2018 | 11/26/2018 4:09:41 PM | P | PASS |
|
|
John Phone #: ###-####
|
BLD18-04121
| DOC - Permit Finaled | 11/26/2018 | 11/26/2018 | 11/26/2018 4:09:31 PM | P | PASS |
|
|
|
BLD18-00860
| BLD-Final | 11/26/2018 | 11/26/2018 | 11/26/2018 2:43:06 PM | P | PASS |
|
|
Phone #: ###-#### Inspection requested via web by Braxton Hansen
|
BLD18-00860
| DOC - Permit Finaled | 11/26/2018 | 11/26/2018 | 11/26/2018 2:42:54 PM | P | PASS |
|
|
|
BLD18-00860
| BLD-Blower Door Test Results | 11/26/2018 | 11/26/2018 | 11/26/2018 2:42:43 PM | P | DONE |
|
|
ACH50- 5.3
|
BLD18-02926
| BLD-Energy code compliance | 11/19/2018 | 11/26/2018 | 11/26/2018 11:46:25 AM | A | PASS |
|
|
Corrections SAT...
|
BLD17-04674
| BLD-Framing/Rough-in | 11/26/2018 | 11/26/2018 | 11/26/2018 11:45:57 AM | A | PASS |
|
|
Phone #: ###-#### Inspection requested via web by joey benart
|
BLD18-03186
| BLD-Energy code compliance | 11/19/2018 | 11/26/2018 | 11/26/2018 11:11:29 AM | A | PASS |
|
|
Corrections SAT...
|