Inspections for the day of: Friday, November 8, 2019.
Number of inspections: 24
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorBrandon Shaw
TitleBLD-COM/RES INSPECTOR
Phone #208-954-9358
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
BLD19-02307 BLD-Framing/Rough-in11/8/201911/8/201911/8/2019 5:00:15 PMPNR
Air seal not done at time of inspection...
BLD19-01485 BLD-Final11/8/201911/8/201911/8/2019 4:59:14 PMPFAIL
Need Mech final...
Provide blower door test results...
BLD19-01486 BLD-Framing/Rough-in11/8/201911/8/201911/8/2019 4:58:07 PMPCANC
A4G truss to be fastened per Truss Engineering...
A4g to bear point load, to Foundation...
See C/N...
BLD16-01542 BLD-Final11/7/201911/8/201911/8/2019 4:55:40 PMPPASS
Blower door test results on Electrical Panel and paper work in HVAC paper work bin. Phone #: ###-#### Inspection requested via web by James Greenwood
BLD16-01542 DOC - Permit Finaled11/8/201911/8/201911/8/2019 4:55:34 PMPPASS
BLD19-00358 BLD-Final11/8/201911/8/201911/8/2019 4:55:19 PMPFAIL
Need PW grading approval...
BLD19-03832 BLD-Footing11/7/201911/8/201911/8/2019 4:54:31 PMPPASS
This footing inspection can be done early in the PM tomorrow. Jimmy will be doing the installation and his cell number is ###-####. Thanks. Phone #: ###-#### Inspection requested via web by rich prasch
BLD19-03227 BLD-Framing/Rough-in11/8/201911/8/201911/8/2019 4:54:22 PMPFAIL
Hold downs not installed per manufacturers reccom...
BLD19-03227 BLD-Energy code compliance11/8/201911/8/201911/8/2019 4:54:09 PMPFAIL
Hold downs not installed per manufacturers reccom...
BLD19-01940 BLD-Footing11/7/201911/8/201911/8/2019 4:52:39 PMAPASS
Work in progress...
BLD16-01542 BLD-Blower Door Test Results11/8/201911/8/201911/8/2019 1:31:46 PMPDONE
ACH50- 3.6
BLD19-03886 BLD-Foundation11/7/201911/8/201911/8/2019 11:55:16 AMAPASS
Work in progress...
BLD17-00787 BLD-Energy code compliance11/7/201911/8/201911/8/2019 11:54:50 AMAPASS
Insulation Inspection Phone #: ###-#### Inspection requested via web by Chris Homeyer
BLD19-03870 BLD-Wall Bracing11/7/201911/8/201911/8/2019 11:51:33 AMAPASS
Raul Phone #: ###-####
BLD19-01787 BLD-Ceiling Grid Inspection11/7/201911/8/201911/8/2019 11:51:09 AMAPART
Pending trades
BLD19-02194 BLD-Foundation11/7/201911/8/201911/8/2019 11:48:55 AMAPASS
Work in progress...
BLD18-02739 BLD-Framing/Rough-in11/7/201911/8/201911/8/2019 11:06:34 AMAPASS
OK to insulate...
BLD19-03831 BLD-Final11/7/201911/8/201911/8/2019 11:05:35 AMAPASS
Please call before to let us know 30 minutes before arriving for the final inspection. Thank you. Phone #: ###-#### Inspection requested via web by Don OConnor
BLD19-03831 DOC - Permit Finaled11/8/201911/8/201911/8/2019 11:05:26 AMPPASS
MIS19-00362 BLD-Conference11/5/201911/8/201911/8/2019 11:04:13 AMADEFR
BLD19-00222 BLD-Aging Inspection11/8/201911/8/201911/8/2019 9:12:12 AM DEFR
BLD19-00222 Extend Permit 90/180 days11/8/201911/8/201911/8/2019 9:11:59 AMPDONE
BLD18-03644 BLD-Aging Inspection11/8/201911/8/201911/8/2019 9:11:05 AM DONE
BLD18-03644 Extend Permit 90/180 days11/8/201911/8/201911/8/2019 9:10:58 AMPDEFR