Inspections for the day of: Friday, November 9, 2018.
Number of inspections: 29
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorBrandon Shaw
TitleBLD-COM/RES INSPECTOR
Phone #208-954-9358
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
BLD18-01096 BLD-Final11/9/201811/9/201811/9/2018 5:15:40 PMPPASS
BLD18-01096 DOC - Permit Finaled11/9/201811/9/201811/9/2018 5:15:31 PMPPASS
BLD18-00553 BLD-Other11/9/201811/9/201811/9/2018 5:15:25 PMPPASS
Soffit
BLD18-00553 BLD-Wall Bracing11/9/201811/9/201811/9/2018 5:15:15 PMPPASS
Eber Phone #: ###-####
BLD18-01002 BLD-Footing11/8/201811/9/201811/9/2018 5:15:03 PMPCANC
Retaining wall
BLD18-00570 BLD-Final11/9/201811/9/201811/9/2018 5:14:42 PMPPASS
Kyle-as per Kyle plumbing signed off on a final tag that''s in the garage so i also assigned a plumbing plumbing Phone #: ###-####
BLD18-00570 DOC - Permit Finaled11/9/201811/9/201811/9/2018 5:14:33 PMPPASS
BLD18-02879 BLD-Final11/8/201811/9/201811/9/2018 2:55:39 PMPFAIL
No permit or approved set of plans on site...
No smoke alarms...
BLD18-00570 BLD-Blower Door Test Results11/9/201811/9/201811/9/2018 2:51:15 PMPDONE
ACH50- 3.25
BLD18-00995 BLD-Framing/Rough-in11/9/201811/9/201811/9/2018 2:17:21 PMPDONE
See Documents of Engineering fix for notched beam...
BLD18-00773 BLD-Final11/9/201811/9/201811/9/2018 1:41:52 PMPCANC
Bill Phone #: ###-####
BLD18-00773 BLD-Blower Door Test Results11/9/201811/9/201811/9/2018 1:41:41 PMPNR
BLD18-02655 BLD-Final11/8/201811/9/201811/9/2018 1:29:31 PMPPASS
Home owner will be home after 1pm. Thanks Phone #: ###-#### Inspection requested via web by David Sherman
BLD18-02655 DOC - Permit Finaled11/9/201811/9/201811/9/2018 1:29:24 PMPPASS
BLD18-01096 BLD-Blower Door Test Results11/9/201811/9/201811/9/2018 11:47:02 AMPDONE
ACH50- 3.88

Disregard previous enrty, not applicable to this permit...
BLD18-00554 BLD-Energy code compliance11/8/201811/9/201811/9/2018 11:44:21 AMAPASS
Phone #: ###-#### Inspection requested via web by Clint Wall
BLD15-02093 BLD-Framing/Rough-in11/8/201811/9/201811/9/2018 11:43:20 AMAPART
PORTICO
BLD18-00752 BLD-Final11/8/201811/9/201811/9/2018 11:42:02 AMAPASS
Phone #: ###-#### Inspection requested via web by Braxton Hansen
BLD18-00752 DOC - Permit Finaled11/9/201811/9/201811/9/2018 11:41:53 AMPPASS
BLD18-00752 BLD-Energy code compliance11/9/201811/9/201811/9/2018 11:41:46 AMADONE
ACH50- 5.65
BLD18-00751 BLD-Final11/8/201811/9/201811/9/2018 11:41:25 AMAPASS
Phone #: ###-#### Inspection requested via web by Braxton Hansen
BLD18-00751 DOC - Permit Finaled11/9/201811/9/201811/9/2018 11:41:19 AMPPASS
BLD18-00751 BLD-Blower Door Test Results11/9/201811/9/201811/9/2018 11:41:10 AMADONE
ACH50- 6
BLD18-00750 BLD-Final11/8/201811/9/201811/9/2018 11:40:50 AMAPASS
Phone #: ###-#### Inspection requested via web by Braxton Hansen
BLD18-00750 DOC - Permit Finaled11/9/201811/9/201811/9/2018 11:40:38 AMPPASS
BLD18-00750 BLD-Blower Door Test Results11/9/201811/9/201811/9/2018 11:40:10 AMADONE
ACH50- 6.3
BLD18-03153 BLD-Wall Bracing11/8/201811/9/201811/9/2018 11:37:08 AMAPASS
Work in progress...
Interior OSB shear and missing anchor bolts to be installed before framing rough-in...
BLD18-01096 BLD-Final11/9/201811/9/201811/9/2018 11:31:34 AMPPASS
Work in progress...
Interior OSB shear and missing anchor bolts to be installed before framing rough-in...
BLD18-03937 BLD-Footing11/8/201811/9/201811/9/2018 9:25:46 AMAPASS
Rebar and ground clearance good, OK to pour...