BLD18-02557
| BLD-Grading Inspection | 12/10/2018 | 12/10/2018 | 12/10/2018 5:08:40 PM | P | PART |
|
|
Ceiling grid, south end of office... OK to cover...
|
BLD18-02729
| BLD-Foundation | 12/10/2018 | 12/10/2018 | 12/10/2018 5:07:52 PM | P | PASS |
|
|
Work in progress... Frost protection is required...
|
BLD18-00486
| BLD-Wall Bracing | 12/10/2018 | 12/10/2018 | 12/10/2018 5:07:19 PM | P | PASS |
|
|
Jose Phone #: ###-####
|
BLD18-03326
| BLD-Wall cover | 12/7/2018 | 12/10/2018 | 12/10/2018 5:07:04 PM | P | PASS |
|
|
Insulation, OK... OK to cover...
|
BLD18-03500
| BLD-Footing | 12/10/2018 | 12/10/2018 | 12/10/2018 3:52:47 PM | A | PASS |
|
|
Work in progress... Frost protection required...
|
BLD18-00487
| BLD-Framing/Rough-in | 12/3/2018 | 12/10/2018 | 12/10/2018 11:13:52 AM | A | PASS |
|
|
OK to insulate
|
BLD18-00513
| BLD-Final | 12/4/2018 | 12/10/2018 | 12/10/2018 11:13:30 AM | A | PASS |
|
|
Phone #: ###-#### Inspection requested via web by Clint Wall
|
BLD18-00513
| BLD-Blower Door Test Results | 12/4/2018 | 12/10/2018 | 12/10/2018 11:13:06 AM | A | DONE |
|
|
ACH50- 4.4
|
BLD18-02996
| BLD-Final | 12/7/2018 | 12/10/2018 | 12/10/2018 11:12:41 AM | A | PASS |
|
|
Chris Phone #: ###-####
|
BLD18-02996
| DOC - Permit Finaled | 12/10/2018 | 12/10/2018 | 12/10/2018 11:12:33 AM | P | PASS |
|
|
|