Inspections for the day of: Tuesday, December 11, 2018.
Number of inspections: 29
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorBrandon Shaw
TitleBLD-COM/RES INSPECTOR
Phone #208-954-9358
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
BLD18-03324 BLD-Final12/7/201812/11/201812/11/2018 4:50:00 PMPPASS
John Phone #: ###-####
BLD18-03324 DOC - Permit Finaled12/11/201812/11/201812/11/2018 4:49:51 PMPPASS
BLD17-04465 BLD-Wall cover12/11/201812/11/201812/11/2018 4:49:40 PMPPASS
Permission to cover inspection on Units # 115, #117, ; #119
BLD17-04465 BLD-Energy code compliance12/11/201812/11/201812/11/2018 4:49:23 PMPPASS
Interior Insulation inspection on Units # 115, #117, ; #119
BLD17-04465 BLD-Wall Bracing12/11/201812/11/201812/11/2018 4:48:59 PMPPASS
Interior Shear inspection on Units # 115, #117, ; #119
BLD18-03500 BLD-Foundation12/11/201812/11/201812/11/2018 4:47:05 PMPPASS
Work in progress...
Frost protection is required...
BLD18-00995 BLD-Final12/10/201812/11/201812/11/2018 4:46:22 PMPPASS
Phone #: ###-#### Inspection requested via web by Gus Brandon
BLD18-00995 DOC - Permit Finaled12/11/201812/11/201812/11/2018 4:46:09 PMPPASS
BLD18-03827 BLD-Final12/11/201812/11/201812/11/2018 2:29:30 PMPPASS
Please give me a call when you start heading that way. Im on another project just 10 mins away. Thanks Jim Phone #: ###-#### Inspection requested via web by Ryan Allen
BLD18-03827 DOC - Permit Finaled12/11/201812/11/201812/11/2018 2:29:20 PMPPASS
BLD18-04251 BLD-Framing/Rough-in12/11/201812/11/201812/11/2018 1:32:28 PMPPART
Keith Phone #: ###-####,, needs trades 1st,, walk through,, ok to pour footings for the point loads
BLD18-02512 BLD-Framing/Rough-in12/10/201812/11/201812/11/2018 1:06:14 PMPPART
OK to cover
BLD18-04333 BLD-Final12/10/201812/11/201812/11/2018 1:05:44 PMPCANC
Need Fire final...
BLD18-02566 BLD-Footing12/11/201812/11/201812/11/2018 1:05:04 PMPPART
Work in progress...
BLD18-02512 BLD-Energy code compliance12/10/201812/11/201812/11/2018 1:04:34 PMPPASS
Cody Phone #: ###-####
BLD18-02821 BLD-Foundation12/10/201812/11/201812/11/2018 12:16:16 PMPCANC
Please call 1/2 hr prior. Thanks Jim Phone #: ###-#### Inspection requested via web by James Larkin
BLD18-02821 BLD-Foundation12/10/201812/11/201812/11/2018 11:37:41 AMAPASS
Work in progress...
Frost protection is reqired
BLD18-02929 BLD-Framing/Rough-in12/10/201812/11/201812/11/2018 11:07:19 AMAPART
Per plans- (2) 2x8 header needed at suite/bathroom pocket door...
Per plans- HDU5 (2) at interior shear not installed...
Missing nut and washer at hold down, right side of tall wall...
See red paint...
OK to insulate...
BLD18-02929 BLD-Energy code compliance12/10/201812/11/201812/11/2018 11:03:13 AMAPART
Air/foam seal
BLD18-00645 BLD-Final12/6/201812/11/201812/11/2018 11:02:36 AMAPASS
Phone #: ###-#### Inspection requested via web by Clint Wall
BLD18-00645 DOC - Permit Finaled12/11/201812/11/201812/11/2018 11:02:20 AMPPASS
BLD18-00645 BLD-Blower Door Test Results12/6/201812/11/201812/11/2018 11:02:05 AMADONE
ACH50- 4.55
BLD17-04515 BLD-Final12/10/201812/11/201812/11/2018 10:28:32 AMAPASS
Phone #: ###-#### Inspection requested via web by Roger Baumchen
BLD17-04515 DOC - Permit Finaled12/11/201812/11/201812/11/2018 10:28:21 AMPPASS
BLD18-00703 BLD-Framing/Rough-in12/10/201812/11/201812/11/2018 10:28:08 AMAPASS
Interior framing Inspection requested via web by Roger Baumchen
BLD17-03345 BLD-Energy code compliance12/10/201812/11/201812/11/2018 10:27:52 AMAPART
Townhomes - 201, 202, & 203
BLD18-01628 BLD-Final12/10/201812/11/201812/11/2018 9:20:18 AMAPASS
Vince Phone #: ###-####
BLD18-01628 DOC - Permit Finaled12/11/201812/11/201812/11/2018 9:20:02 AMPPASS
BLD18-01468 BLD-Aging Inspection12/11/201812/11/201812/11/2018 8:39:32 AM CANC