BLD18-04117
| BLD-Footing | 12/21/2018 | 12/21/2018 | 12/21/2018 4:46:54 PM | P | NR |
|
|
Need soil sub-grade letter submitted and approved by PW...
|
BLD18-03582
| BLD-Footing | 12/21/2018 | 12/21/2018 | 12/21/2018 4:46:02 PM | P | PASS |
|
|
Work in progress... Frost protection is required...
|
BLD18-03581
| BLD-Footing | 12/21/2018 | 12/21/2018 | 12/21/2018 4:45:52 PM | P | PASS |
|
|
Work in progress... Frost protection is required...
|
BLD18-03580
| BLD-Footing | 12/21/2018 | 12/21/2018 | 12/21/2018 4:45:41 PM | P | PASS |
|
|
Work in progress... Frost protection is required...
|
BLD18-03842
| BLD-Footing | 12/21/2018 | 12/21/2018 | 12/21/2018 4:45:25 PM | P | PASS |
|
|
Work in progress... Frost protection is required...
|
BLD18-04196
| BLD-Footing | 12/21/2018 | 12/21/2018 | 12/21/2018 4:44:45 PM | P | PASS |
|
|
Work in progress... Frost protection is required...
|
BLD17-04446
| BLD-Wall Bracing | 12/21/2018 | 12/21/2018 | 12/21/2018 4:43:48 PM | P | PASS |
|
|
Work in progress
|
BLD18-04023
| BLD-Wall Bracing | 12/19/2018 | 12/21/2018 | 12/21/2018 1:20:38 PM | A | PART |
|
|
First floor only... Vertical straps at port hole framing to be installed befotre framing rough-in...
|
BLD18-03768
| BLD-Foundation | 12/20/2018 | 12/21/2018 | 12/21/2018 1:19:15 PM | A | PART |
|
|
South foundation wall... Frost protection is required...
|
BLD18-03888
| BLD-Wall Bracing | 12/20/2018 | 12/21/2018 | 12/21/2018 1:17:55 PM | A | PASS |
|
|
Work in progress... Hold downs and floor to floor straps to be installed before framing rough-in...
|
BLD18-00494
| BLD-Other | 12/20/2018 | 12/21/2018 | 12/21/2018 1:16:18 PM | A | PART |
|
|
Drywall 2nd layer area D, west wing...
|