Inspections for the day of: Thursday, December 27, 2018.
Number of inspections: 13
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorBrandon Shaw
TitleBLD-COM/RES INSPECTOR
Phone #208-954-9358
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
BLD18-03022 BLD-Energy code compliance12/26/201812/27/201812/27/2018 4:59:12 PMPPASS
Garage Code 6365 Phone #: ###-#### Inspection requested via web by Jessica Bradley
BLD18-01912 BLD-Energy code compliance12/26/201812/27/201812/27/2018 4:58:38 PMPPASS
Phone #: ###-#### Inspection requested via web by Joel Hirtle
BLD17-04568 BLD-Conference12/27/201812/27/201812/27/2018 4:58:10 PMPDONE
Drop ceiling grid to be installed as per Manufactures installations instructions...
BLD18-00494 BLD-Other12/27/201812/27/201812/27/2018 4:56:11 PMPPART
Drywall layer inspection Area D, East wing...
BLD18-02154 BLD-Framing/Rough-in12/26/201812/27/201812/27/2018 4:55:38 PMPNR
Late as possible. I have air seal coming tomorrow. Phone #: ###-#### Inspection requested via web by Gus Brandon
BLD18-02168 BLD-Energy code compliance12/26/201812/27/201812/27/2018 12:49:20 PMAPASS
Shaer corrections SAT, see latter from Engineer of record in Documents tab...
MIS18-00477 BLD-Conference12/26/201812/27/201812/27/2018 12:47:27 PMADONE
Three sided enclosure for 2 Hydo Massage beds. Walls to be no more than 6' in height, area about 12'x12'. Electrical permit needed as well.
BLD18-02427 BLD-Wall Bracing12/26/201812/27/201812/27/2018 12:39:09 PMAPASS
All hold downs to be installed before framing rough-in...
Work in progress
BLD18-02428 BLD-Framing/Rough-in12/26/201812/27/201812/27/2018 12:37:57 PMAPASS
Charley Phone #: ###-####
BLD18-02719 BLD-Final12/26/201812/27/201812/27/2018 11:43:03 AMANR
Need Electrical rough and final...
No other issues
BLD18-04062 BLD-Final12/26/201812/27/201812/27/2018 10:21:54 AMAPASS
Don Phone #: ###-####
BLD18-04062 DOC - Permit Finaled12/27/201812/27/201812/27/2018 10:21:42 AMPPASS
BLD18-04086 BLD-Ceiling Grid Inspection12/27/201812/27/201812/27/2018 9:58:43 AMAPASS
Office space