BLD18-03863
| BLD-Wall Bracing | 2/12/2019 | 2/12/2019 | 2/12/2019 5:06:53 PM | P | PASS |
|
|
Work in progress...
|
BLD18-03822
| BLD-Wall Bracing | 2/12/2019 | 2/12/2019 | 2/12/2019 5:06:35 PM | P | PASS |
|
|
Work in progress...
|
BLD18-03500
| BLD-Energy code compliance | 2/11/2019 | 2/12/2019 | 2/12/2019 5:06:13 PM | P | NR |
|
|
Phone #: ###-#### Inspection requested via web by Kyle Seick
|
BLD18-03289
| BLD-Framing/Rough-in | 2/12/2019 | 2/12/2019 | 2/12/2019 5:05:55 PM | P | FAIL |
|
|
Redo all shear nailing... Hold downs to be installed as per plans... Anchor bolts to be no more than 12" from ends of sill plates... Truss hangres to be positively connected to truss/ wall... Interior walls to be positively connected to sub-flooring... Per plans- (2) 11 7/8 LVL to be installed per Engineering... 3 ply truss to bear down to foundation... Per shear pg- CS16 strap with blocking at over height wall... Per framing page, Over height wall framing- (2) 2x6 DF #2 at 16" O.C.
|
BLD18-01868
| BLD-Footing | 2/11/2019 | 2/12/2019 | 2/12/2019 12:58:29 PM | A | PASS |
|
|
Frost protection is required...
|
BLD19-00204
| BLD-Footing | 2/11/2019 | 2/12/2019 | 2/12/2019 12:57:59 PM | A | PASS |
|
|
Mike Phone #: ###-####
|
BLD18-03325
| BLD-Final | 2/11/2019 | 2/12/2019 | 2/12/2019 12:57:33 PM | A | PASS |
|
|
Phone #: ###-#### Inspection requested via web by Gus Brandon
|
BLD18-03325
| DOC - Permit Finaled | 2/12/2019 | 2/12/2019 | 2/12/2019 12:57:21 PM | P | PASS |
|
|
|
BLD18-04462
| BLD-Footing | 2/11/2019 | 2/12/2019 | 2/12/2019 12:49:23 PM | A | CANC |
|
|
Matt Phone #: ###-####
|
BLD18-03325
| BLD-Blower Door Test Results | 2/11/2019 | 2/12/2019 | 2/12/2019 11:06:17 AM | A | DONE |
|
|
ACH50- 4.67
|
BLD18-00553
| BLD-Final | 2/11/2019 | 2/12/2019 | 2/11/2019 9:20:17 AM | A | CANC |
|
|
Phone #: ###-#### >> Inspection requested via web by Clint Wall Inspection cancelled from web by: Clint Wall
|