Inspections for the day of: Tuesday, July 2, 2019.
Number of inspections: 8
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorBrandon Shaw
TitleBLD-COM/RES INSPECTOR
Phone #208-954-9358
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
BLD19-01616 BLD-Footing7/2/20197/2/20197/2/2019 5:04:10 PMPPASS
inspection for rebar placed in pool in back yard. All plans and permits are on site in a PVC pipe secured to a T post. Phone #: ###-#### Inspection requested via web by Brandy McConkey
BLD18-02733 BLD-Framing/Rough-in7/2/20197/2/20197/2/2019 5:03:58 PMPPART
Verify Strong Wall (North East side, Garage) anchoring...
As per walk through- fire block furred basement wall and landings...
BLD18-00772 BLD-Footing7/2/20197/2/20197/2/2019 5:01:50 PMPDEFR
Refer to BLD18-01815 for New constrution permit...
BLD18-01815 BLD-Footing7/2/20197/2/20197/2/2019 5:00:28 PMPPASS
See permit BLD18- 0072 for previous inspections- basement footing and foundation...
Footing inspection for revised floor plan...
BLD18-04240 BLD-Framing/Rough-in7/1/20197/2/20197/2/2019 12:41:00 PMAPASS
Brian Phone #: ###-####
BLD19-00514 BLD-Energy code compliance7/1/20197/2/20197/2/2019 12:40:51 PMAPASS
Les Phone #: ###-####
BLD19-00283 BLD-Footing7/1/20197/2/20197/2/2019 12:40:26 PMAPASS
Phone #: ###-#### Inspection requested via web by Noah Richter
BLD19-01921 BLD-Framing/Rough-in7/1/20197/2/20197/2/2019 12:40:14 PMAPASS
Please give us a 15 minute warning so we can be present for the inspection. Once this inspection is complete we will finish the air seal and insulation to prepare for the energy inspection. Phone #: ###-#### Inspection requested via web by Dustin Collins