Inspections for the day of: Friday, August 9, 2019.
Number of inspections: 14
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorBrandon Shaw
TitleBLD-COM/RES INSPECTOR
Phone #208-954-9358
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
BLD19-02323 BLD-Footing8/8/20198/9/20198/9/2019 5:12:46 PMPPASS
Work in progress...
BLD19-02476 BLD-Footing8/8/20198/9/20198/9/2019 5:12:25 PMPNR
Erme Phone #: ###-####
BLD19-01818 BLD-Framing/Rough-in8/9/20198/9/20198/9/2019 5:12:15 PMPPASS
Provide blocking as per Engineering, see plans...
OK to insulate...
BLD18-04196 BLD-Final8/9/20198/9/20198/9/2019 5:11:19 PMPPASS
Bill Phone #: ###-####
BLD18-04196 DOC - Permit Finaled8/9/20198/9/20198/9/2019 5:11:11 PMPPASS
BLD19-01075 BLD-Framing/Rough-in8/9/20198/9/20198/9/2019 5:11:01 PMPFAIL
Need Ele rough-in...
Provide truss Engineering...
BLD18-01002 BLD-Conference8/8/20198/9/20198/9/2019 5:10:00 PMADONE
Eric Phone #: ###-####
BLD18-04196 BLD-Blower Door Test Results8/9/20198/9/20198/9/2019 1:48:47 PMPDONE
ACH50- 3.58
BLD19-00363 BLD-Footing8/7/20198/9/20198/9/2019 11:45:47 AMAPASS
Inspection of rebar In footings. Special inspection done by Geotek.
Ok after spec inspection sign offs...
BLD19-00363 BLD-Footing8/7/20198/9/20198/9/2019 11:45:28 AMAPASS
Inspection of rebar In footings. Special inspection done by Geotek.
Ok after spec inspection sign offs...
BLD19-02071 BLD-Footing8/8/20198/9/20198/9/2019 11:44:46 AMAPASS
Work in progress...
BLD19-02072 BLD-Footing8/8/20198/9/20198/9/2019 11:44:32 AMAPASS
Work in progress...
BLD19-02073 BLD-Footing8/8/20198/9/20198/9/2019 11:44:19 AMAPASS
Work in progress...
BLD19-02048 BLD-Footing8/8/20198/9/20198/9/2019 11:43:32 AMAPASS
Work in progress...