Inspections for the day of: Wednesday, September 12, 2018.
Number of inspections: 22
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorBrandon Shaw
TitleBLD-COM/RES INSPECTOR
Phone #208-954-9358
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
BLD18-01830 BLD-Wall Bracing9/12/20189/12/20189/13/2018 8:16:32 AMPFAIL
Anchor bolts to be secured and fastened with washers and nuts...
Anchor bolts to be no more than 12" from ends of sill plate...
Verify 3"x3" nailing pattenfor PHG per detail...
Hold downs to be fastened per manufactures installation instructions...
BLD18-00398 BLD-Framing/Rough-in9/11/20189/12/20189/13/2018 8:11:50 AMAPART
Minimum 1 anchor bolt per sill plate or no more than 12" from end of plate...
Trusses to bear down to foundation...
Need washers and tighten nuts at anchor bolts at garage PHF...
BLD18-02910 BLD-Footing9/12/20189/12/20189/12/2018 4:50:32 PMPPASS
Footing inspection can be done earlier in the PM today if possible. Alex will be doing the installation and his cell number is ###-####. Thanks. Phone #: ###-#### Inspection requested via web by rich prasch
BLD18-02152 BLD-Energy code compliance9/12/20189/12/20189/12/2018 4:50:21 PMPPASS
Phone #: ###-#### Inspection requested via web by Kyle Seick
BLD18-01895 BLD-Final9/12/20189/12/20189/12/2018 4:50:08 PMPPASS
Melony Phone #: ###-####
BLD18-01895 DOC - Permit Finaled9/12/20189/12/20189/12/2018 4:49:59 PMPPASS
BLD18-02693 BLD-Footing9/11/20189/12/20189/12/2018 2:39:29 PMPPASS
John Phone #: ###-####
BLD17-04526 BLD-Final9/12/20189/12/20189/12/2018 1:22:04 PMPPASS
Les Phone #: ###-####
BLD17-04526 DOC - Permit Finaled9/12/20189/12/20189/12/2018 1:21:38 PMPPASS
BLD17-04526 BLD-Blower Door Test Results9/12/20189/12/20189/12/2018 1:21:24 PMPDONE
ACH50- 3.30
ACH50- 3.30
BLD18-03092 BLD-Foundation9/11/20189/12/20189/12/2018 1:20:22 PMPPASS
Phone #: 2086971241 >> Inspection requested via mobile web by Heron
BLD18-02970 BLD-Foundation9/11/20189/12/20189/12/2018 1:19:31 PMPPASS
Work in progress
BLD17-04082 BLD-Energy code compliance9/11/20189/12/20189/12/2018 1:11:19 PMAPASS
Phone #: ###-#### Inspection requested via web by Clint Wall
BLD18-02705 BLD-Wall Bracing9/11/20189/12/20189/12/2018 11:57:51 AMAPASS
Nick Phone #: ###-####
BLD18-00230 BLD-Framing/Rough-in9/11/20189/12/20189/12/2018 11:55:35 AMAPART
Area D corridors- Hat channel and insulation, OK to cover
BLD18-01719 BLD-Framing/Rough-in9/11/20189/12/20189/12/2018 11:17:14 AMAPASS
Strap needed at break in double top plate...
Squash block and full bearing colunm at beam in master bedroom...

OK to insulate
BLD18-00493 BLD-Conference9/12/20189/12/20189/12/2018 9:26:33 AMADEFR
Work in progress
BLD18-00493 BLD-Conference9/12/20189/12/20189/12/2018 9:26:18 AMADEFR
Work in progress
BLD18-00492 BLD-Aging Inspection9/12/20189/12/20189/12/2018 9:25:52 AM CANC
BLD18-00493 BLD-Aging Inspection9/12/20189/12/20189/12/2018 9:25:39 AM CANC
BLD18-03225 BLD-Final9/11/20189/12/20189/12/2018 9:19:12 AMAPASS
Call with any questions Phone #: ###-#### Inspection requested via web by Matt Oranday
BLD18-03225 DOC - Permit Finaled9/12/20189/12/20189/12/2018 9:19:04 AMPPASS