MEC19-00509
| Rough-in | 2/6/2019 | 2/6/2019 | 2/6/2019 4:36:19 PM | P | PASS |
|
|
I will be there untill about 3:30 208 631 6575 Inspection requested via web by jeff jedlick -partial R/I ok only on new floor in garage - will need to see the rest of the house for a R/I inspection
|
MEC19-00380
| Rough-in | 2/6/2019 | 2/6/2019 | 2/6/2019 4:29:03 PM | P | FAIL |
|
|
Phone #: ###-#### Inspection requested via web by Kaila Martarano - still need to see exhaust fan specs - line sets and condensate lines need nail plates - exhaust ducting needs sealed at fan outlets - west unit first floor was locked wasnt able to inspect
|
MEC19-00509
| Conference | 2/6/2019 | 2/6/2019 | 2/6/2019 4:27:04 PM | P | DONE |
|
|
I will be there untill about 3:30 208 631 6575 Inspection requested via web by jeff jedlick
|
MEC18-04840
| Final | 2/6/2019 | 2/6/2019 | 2/6/2019 3:13:21 PM | P | PASS |
|
|
les Phone #: ###-#### - final ok
|
MEC19-00501
| Final | 2/4/2019 | 2/6/2019 | 2/6/2019 2:35:33 PM | P | FAIL |
|
|
Homeowner Brad Bruggeman ###-#### Phone #: ###-#### Inspection requested via web by Mary LaFayette - duct insulation next to b vent is touching. would like to see a heat sheild put in place between vent and duct wrap or duct wrap replace and installed tighter to achieve clearance between b vent
|
MEC19-00487
| Final | 2/5/2019 | 2/6/2019 | 2/6/2019 2:20:45 PM | P | FAIL |
|
|
Please call Dave prior to arrival ###-#### Inspection requested via web by Arielle Hendricks - eletrical contractor needs to pull a permit for work performed on new gas furnace
|
MEC19-00514
| Final | 2/5/2019 | 2/6/2019 | 2/6/2019 2:05:46 PM | P | PASS |
|
|
INSTALLER GERRY ###-#### Phone #: ###-#### Inspection requested via web by Aaron Alandt - range hood final ok
|
MEC19-00526
| Rough-in | 2/5/2019 | 2/6/2019 | 2/6/2019 2:05:21 PM | P | PART |
|
|
Please call the number provided when on the way. The duct will be covered in concrete and needs to be inspected before this happens. Please inspect duct only at this time. The vent will be inspected at a later time. Call with any questions. Phone #: ###-#### Inspection requested via web by Steve Bunch - duct work to be installed in floor ok to be covered - exhaust fan will be installed later in project
|
MEC19-00529
| Rough-in | 2/6/2019 | 2/6/2019 | 2/6/2019 1:24:32 PM | P | PASS |
|
|
Phone #: ###-#### Inspection requested via web by Frank Marturello - R/I ok
|
MEC19-00529
| Pressure Test | 2/6/2019 | 2/6/2019 | 2/6/2019 1:24:15 PM | P | PASS |
|
|
Phone #: ###-#### Inspection requested via web by Frank Marturello - 5lb flue pressure test ok - 20lb gas pressure test ok - tagged meter
|
MEC18-05497
| Pressure Test | 2/6/2019 | 2/6/2019 | 2/6/2019 1:23:40 PM | P | PASS |
|
|
Pressure Test BBQ gas line (back porch). Phone #: ###-#### Inspection requested via web by Frank Marturello - 20lb gas pressure test ok to bbq
|
MEC17-04148
| Final | 2/6/2019 | 2/6/2019 | 2/6/2019 11:55:28 AM | P | NR |
|
|
The inspection is for a final on Phase III to Cover. Please contact Rich Beckstead ###-#### if you have any questions. Phone #: 208-869-45 87 Inspection requested via web by Beka Hereau - green building needs to be reviewed by code offical for temp occ
|
MEC17-04148
| Rough-in | 2/6/2019 | 2/6/2019 | 2/6/2019 11:51:34 AM | P | PASS |
|
|
The inspection is for a final on Phase III to Cover. Please contact Rich Beckstead ###-#### if you have any questions. Phone #: ###-#### Inspection requested via web by Beka Hereau - checked condensates in phase three one ducted split still needs condensate finished - a few locations at branch boxes need insulation finished - dryer duct going through roof was ok below roof line need to check termination on roof still - insulation of duct work ok - ceiling cover is ok just need to see a few locations above ceiling at temp occ inspection
|
MEC17-05457
| Final | 2/5/2019 | 2/6/2019 | 2/6/2019 11:48:05 AM | A | NR |
|
|
Phone #: ###-#### Inspection requested via web by Nicholas Paige - phase lll has not been reviewed by code offical for green building requirements - checked all hydronics, condensate lines and gas pipe in phase lll - gas line is going through phase 3,4 which includes truck bays has not been pressure tested yet will need to see pressure test during phase 4 -
|
MEC19-00098
| Rough-in | 2/5/2019 | 2/6/2019 | 2/6/2019 10:39:53 AM | A | PASS |
|
|
Antonio is your contact Phone #: ###-#### Inspection requested via web by Kim Adams - ceiling cover ok - final ok - no card onsite to sign
|
MEC19-00298
| Final | 2/5/2019 | 2/6/2019 | 2/6/2019 10:02:19 AM | A | PASS |
|
|
Please Call Brett on the way to make sure there is someone there to meet you. Cell number is ###-#### Phone #: ###-#### Inspection requested via web by Brett Shannon - furnace ac coil co ok
|
MEC19-00487
| Pressure Test | 2/5/2019 | 2/6/2019 | 2/6/2019 9:44:30 AM | A | PASS |
|
|
Please call on way: Blake ###-#### Phone #: ###-#### Inspection requested via web by Arielle Hendricks - 20lb gas pressure test ok - tagged meter
|
MEC18-04130
| Final | 2/5/2019 | 2/6/2019 | 2/6/2019 9:24:46 AM | A | PASS |
|
|
Please call one hour ahead so we can meet the inspector with the ladder and code. ###-#### Phone #: ###-#### Inspection requested via web by Monica Lindsay - final ok
|