MEC19-03455
| Pressure Test | 8/6/2019 | 8/12/2019 | 8/12/2019 3:51:36 PM | P | PASS |
|
|
PLEASE CALL PLUMBER ZAK GREEN WHEN ON THE WAY. THANK YOU Phone #: ###-#### Inspection requested via web by Chris Field - 20lb gas pressure test ok
|
MEC19-00240
| Pressure Test | 8/12/2019 | 8/12/2019 | 8/12/2019 3:36:21 PM | P | PASS |
|
|
Contact: Robert Church ###-####. Phone #: ###-#### Inspection requested via web by Brent Lacy - 20lb gas pressure test on 206,202 ,101,102,107 units ok
|
MEC19-00240
| Pressure Test | 8/12/2019 | 8/12/2019 | 8/12/2019 3:35:12 PM | P | PASS |
|
|
3rd floor hydronics // Robert Phone #: ###-#### - 3rd floor 100lb hydronics main ok
|
MEC19-02654
| Final | 8/9/2019 | 8/12/2019 | 8/12/2019 2:32:32 PM | P | FAIL |
|
|
Please inspect after 3:30 and call landlord, Kelly, prior to inspection so he can meet you there. ###-#### Phone #: ###-#### Inspection requested via web by Mary LaFayette - need to install co detector near bedrooms
|
MEC19-03362
| Final | 8/9/2019 | 8/12/2019 | 8/12/2019 2:07:11 PM | P | FAIL |
|
|
Please call Barbra on your way - ###-#### Phone #: ###-#### Inspection requested via web by Arielle Hendricks - need to see electrical permit for relocation of A/C - need co detectors installed upstairs and downstairs - line set at indoor unit has a kink at the floor and is missing insulation
|
MEC19-02852
| Final | 8/12/2019 | 8/12/2019 | 8/12/2019 1:47:03 PM | P | PART |
|
|
this is a "partial final" inspection. No one from Trane will be onsite so please call with any questions. Thank you. Phone #: ###-#### Inspection requested via web by Crystal Grant - phase 1 parial final ok will receive full final when the rest of the remodel is finished
|
MEC19-03476
| Rough-in | 8/12/2019 | 8/12/2019 | 8/12/2019 1:19:43 PM | P | PASS |
|
|
Mechanical Gas Fireplace Rough-in Inspection Phone #: ###-#### Inspection requested via web by Dan Otero - fireplace R/I ok
|
MEC19-02879
| Rough-in | 8/11/2019 | 8/12/2019 | 8/12/2019 1:11:00 PM | P | PASS |
|
|
Phone #: ###-#### Inspection requested via web by yuriy kryachun - R/I ok - plumbing vent going through roof needs to be extended 3' above fresh air on unit downstairs - contractor will pipe out combustion air for both furnaces for final - -
|
MEC19-02879
| Pressure Test | 8/11/2019 | 8/12/2019 | 8/12/2019 1:09:03 PM | P | PASS |
|
|
Phone #: ###-#### Inspection requested via web by yuriy kryachun 2- 5lb flue pressure tests ok -20lb gas pressure test ok - tagged meter location
|
MEC19-03508
| Rough-in | 8/9/2019 | 8/12/2019 | 8/12/2019 12:48:30 PM | A | CANC |
|
|
access code for key lockbox is 9811. Phone #: ###-#### Inspection requested via web by Steve Canfield - went to suite 100 which was cold chain and the lady at the front desk didn't know about any work being done. tried calling Steve with contractor and no answer. It seems that this permit was pulled on the wrong address maybe. reschedule with more information
|
MEC19-02967
| Final | 8/7/2019 | 8/12/2019 | 8/12/2019 12:28:29 PM | A | FAIL |
|
|
Please call RAmiro on your way - ###-#### Phone #: ###-#### Inspection requested via web by Arielle Hendricks - common b vent needs 1" clearances at wall
|
MEC19-03442
| Rough-in | 8/9/2019 | 8/12/2019 | 8/12/2019 11:26:50 AM | A | FAIL |
|
|
Phone #: ###-#### Inspection requested via web by Jon VanderStelt - need access to furnace model numbers - water flue has screws through inner pipe - return duct upstairs needs sealed - fix return flex outter liner upstairs - line set in crawl need supported and rips fixed - fresh air needs to be installed at furnace return plenum - nail plates at dryer vent and pvc flue - 5lb flue test fail - support gas line in attic near range
|
MEC19-03442
| Pressure Test | 8/9/2019 | 8/12/2019 | 8/12/2019 11:24:01 AM | A | FAIL |
|
|
Phone #: ###-#### Inspection requested via web by Jon VanderStelt - 5lb flue pressure test under 5lb - 20lb gas pressure test ok - tagged meter location
|
MEC19-03300
| Final | 8/9/2019 | 8/12/2019 | 8/12/2019 10:57:33 AM | P | PASS |
|
|
Phone #: ###-#### Inspection requested via web by Arielle Hendricks - final ok
|
MEC19-03553
| Pressure Test | 8/12/2019 | 8/12/2019 | 8/12/2019 10:56:57 AM | A | PASS |
|
|
Home #4. Exterior, North side yard. New exterior gas and home both under pressure test. Sean is the contact. Phone #: ###-#### Inspection requested via web by Scott Sparrell - 20lb under ground ok backfill ok - 20lb gas in home ok - tagged meter location - will need to see flex line installed for final
|
MEC19-01022
| Final | 8/7/2019 | 8/12/2019 | 8/12/2019 10:37:05 AM | A | PASS |
|
|
Phone #: ###-#### Inspection requested via web by Nicholas Paige - final ok
|
MEC19-00346
| Rough-in | 8/9/2019 | 8/12/2019 | 8/12/2019 10:32:22 AM | A | FAIL |
|
|
albert Phone #: ###-#### - right side wall has combustibles within 18" of hood - all 3 exhaust fans needs extensions installed -pressure test needs to be 60lb -gas lines on roof need sediment traps and test ports - roof caps need sealed -make up air duct needs insulated and installed per prints -need to see electrical permit pulled - equipment needs to be 6" inside hood - seams on backside and left side of hood need sealed
|
MEC19-03364
| Final | 8/7/2019 | 8/12/2019 | 8/12/2019 8:30:11 AM | A | CANC |
|
|
Call technician Juan when you are on the way to have him meet you onsite for access. Phone #: ###-#### Inspection requested via web by Misty McNabb - no access reschedule
|
MEC19-03422
| Pressure Test | 8/9/2019 | 8/12/2019 | 8/12/2019 7:57:02 AM | A | PASS |
|
|
Jack already took care of this this morning. I forgot to call it in like I was supposed to. Please connect with him on this and/or give me a buzz. -Alyssa Phone #: ###-#### Inspection requested via web by Alyssa Cromwell - 5lb flue pressure test ok
|
MEC19-03422
| Final | 8/12/2019 | 8/12/2019 | 8/12/2019 7:56:35 AM | A | PASS |
|
|
Jack already took care of this this morning. I forgot to call it in like I was supposed to. Please connect with him on this and/or give me a buzz. -Alyssa Phone #: ###-#### Inspection requested via web by Alyssa Cromwell - furnace only co ok
|