MEC18-03914
| Final | 8/10/2018 | 8/14/2018 | 8/14/2018 4:20:22 PM | P | PASS |
|
|
Field Super: Chad Robertson Phone #: ###-#### Inspection requested via web by Lisa Whitney - RTU final ok
|
MIS18-00046
| MEC-Conference | 8/14/2018 | 8/14/2018 | 8/14/2018 3:19:58 PM | P | FAIL |
|
|
per Jim Storey-work being done w/o permits - Mechanical permit will be required for exhaust fans that will need to be installed in bathrooms and the ductless split system on the north side of the house
|
MEC18-03961
| Final | 8/14/2018 | 8/14/2018 | 8/14/2018 2:53:09 PM | P | FAIL |
|
|
Landlord Charlene Bragg lives next door at 3605 W Normandie Dr if no one answers door at 3602. Her number is ###-#### Phone #: ###-#### Inspection requested via web by Mary LaFayette - insulation in the crawl space in touching furnace B vent- need b vent clearances of 1" everything else checked out ok
|
MEC18-03894
| Final | 8/14/2018 | 8/14/2018 | 8/14/2018 2:31:01 PM | P | PASS |
|
|
Phone #: ###-#### Inspection requested via web by Mary LaFayette- A/C coil co ok
|
MEC18-03675
| Rough-in | 8/10/2018 | 8/14/2018 | 8/14/2018 2:21:15 PM | P | FAIL |
|
|
Steve-call for access code Phone #: ###-####- need a drip leg in gas line at furnace- B vent coming through floor needs 1" clearances- furnace needs service discconect and light in crawl- access opening into crawl is too small needs to be 22x 30 - make sure that toe kicks in two locations are ducted all the way to the register- need to see 6" fresh air intake
|
MEC18-03968
| Final | 8/14/2018 | 8/14/2018 | 8/14/2018 1:29:11 PM | P | PASS |
|
|
Please call on way: Tyrel ###-#### Phone #: ###-#### Inspection requested via web by Krista Boss- A/C coil co ok
|
MEC18-03809
| Rough-in | 8/13/2018 | 8/14/2018 | 8/14/2018 11:50:05 AM | A | FAIL |
|
|
Phone #: ###-#### Inspection requested via web by Gary Reeves -need to perform a flue pressure test on both furnace and water heater - duct seal at bypass damper both return and supply side
|
MEC18-03809
| Pressure Test | 8/13/2018 | 8/14/2018 | 8/14/2018 11:48:25 AM | A | FAIL |
|
|
Phone #: ###-#### Inspection requested via web by Gary Reeves - need to perform 5lb flue test on both water heater and furnace - 20lb gas pressure test ok
|
MEC18-03810
| Rough-in | 8/13/2018 | 8/14/2018 | 8/14/2018 11:47:31 AM | A | FAIL |
|
|
Phone #: ###-#### Inspection requested via web by Gary Reeves - line set insulation has rips -trunk line duct work in attic needs insulation wrap -duct seal at bypass both return and supply - water heater 5lb flue test under 5lb
|
MEC18-03810
| Pressure Test | 8/13/2018 | 8/14/2018 | 8/14/2018 11:45:36 AM | A | FAIL |
|
|
Phone #: ###-#### Inspection requested via web by Gary Reeves- water heater 5lb flue test fail gauge was under 5lb and wouldnt zero- 20lb gas pressure test ok- furnace 5lb flue test ok
|
MEC18-03014
| Final | 8/13/2018 | 8/14/2018 | 8/14/2018 10:47:57 AM | A | PASS |
|
|
PLEASE CALL JIM (LEAD INSTALLER) AT ###-####, HE NEEDS A HOUR NOTICE TO MEET YOU THERE.
IF YOU HAVE ANY QUESTIONS PLEASE CALL JIM.
THANKS
MARY JANE Phone #: ###-#### Inspection requested via web by Trina DeBoard -final ok
|
MEC18-02236
| Rough-in | 8/13/2018 | 8/14/2018 | 8/14/2018 10:31:57 AM | A | FAIL |
|
|
Call for access Phone #: 2088718789 >> Inspection requested via mobile web by Albert - light test fail- also need clearances on exhuast fans to make-up unit on roof- a beam on the back side of the hood is within 18 " of hood top
|
MEC18-03932
| Final | 8/13/2018 | 8/14/2018 | 8/14/2018 9:14:44 AM | A | PASS |
|
|
Please call John at ###-#### when in route, customer is going out of town so much do inspection in the am the earlier the better please. Phone #: ###-#### Inspection requested via web by Sabrina DeHority -furnace ac coil co ok
|
MEC18-03545
| Final | 8/14/2018 | 8/14/2018 | 8/14/2018 8:47:37 AM | A | PASS |
|
|
needed this inspection in the am not pm - 5lb flue pressure test ok- furnace ac coil co ok
|
MEC17-05308
| Mec-Aging Inspection | 8/14/2018 | 8/14/2018 | 8/14/2018 8:27:23 AM | | DONE |
|
|
called TML to schedule inspection.
|
MEC18-03545
| Final | 8/7/2018 | 8/14/2018 | 8/14/2018 8:24:35 AM | P | CANC |
|
|
Carlon will be there by 10am to do the flue test. Phone #: ###-#### Inspection requested via web by Amber Orr - cancelled this pm inspection and scheduled for am
|
MEC18-03545
| Conference | 8/14/2018 | 8/14/2018 | 8/14/2018 8:23:03 AM | A | CANC |
|
|
needed this inspection in the am not pm
|
MEC18-03545
| Final | 8/14/2018 | 8/14/2018 | 8/14/2018 8:21:40 AM | P | CANC |
|
|
needed to this inspection to be am not pm
|
MEC18-03932
| Final | 8/13/2018 | 8/14/2018 | 8/13/2018 10:17:58 AM | P | CANC |
|
|
Call Doug at ###-#### to coordinate - installing a/c in the am please call Doug when in route. Phone #: ###-#### >> Inspection requested via web by Sabrina DeHority Inspection cancelled from web by: Sabrina DeHority
|
MEC18-03932
| Final | 8/10/2018 | 8/14/2018 | 8/13/2018 10:14:47 AM | A | CANC |
|
|
Please call John at ###-#### when in route - customer is going out of town so need to have inspection done in the early morning please. Phone #: ###-#### >> Inspection requested via web by Sabrina DeHority Inspection cancelled from web by: Sabrina DeHority
|