Inspections for the day of: Thursday, August 9, 2018.
Number of inspections: 19
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorJack Reynolds
TitleMEC INSPECTOR
Phone #208-803-2395
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
MEC18-03265 Final8/9/20188/9/20188/9/2018 4:05:28 PMPPASS
Inspection requested via web by Ron Arnold
- A/C fuses ok- penetration sealed- insulation fixed- A/C coil final ok
MEC18-01885 Rough-in8/9/20188/9/20188/9/2018 3:22:07 PMPPASS
Phone #: ###-#### Inspection requested via web by Krista Boss- exhaust fans ok - dryer vent ok- range vent ok- R/I ok
MEC18-01885 Pressure Test8/9/20188/9/20188/9/2018 3:21:27 PMPPASS
Phone #: ###-#### Inspection requested via web by Krista Boss- 2x 20lb gas pressure test ok
- 5lb flue pressure test ok
MEC18-03853 Final8/6/20188/9/20188/9/2018 2:53:36 PMPPASS
Please call Kyle to ensure install is complete. Thank you! ###-#### Phone #: ###-#### Inspection requested via web by Rick Borg
-furnace ac coil co ok
MEC18-03377 Final8/9/20188/9/20188/9/2018 2:21:35 PMPNH
Bill Doss is Journeyman on site Phone #: ###-#### Inspection requested via web by Ron Arnold- no access to home
MEC18-03377 Pressure Test8/9/20188/9/20188/9/2018 2:21:15 PMPNH
Bill Doss is Journeyman on site Phone #: ###-#### Inspection requested via web by Ron Arnold- no access to home
MEC18-03715 Rough-in8/9/20188/9/20188/9/2018 2:02:50 PMPPASS
Call David for inspection time: ###-#### Phone #: ###-#### Inspection requested via web by Michael Stimpson-R/I ok- would like to see the dryer vent added to your permit
MEC17-05457 Pressure Test8/9/20188/9/20188/9/2018 1:36:12 PMPPASS
hydronics pressure test- 100 lb hydronics test ok on phase 2. The piping R/I for hydronics will go into phase 3 and finish- ok for hydronics insulation in phase 2- hydronics connection to ceiling mount panels ok
MEC17-05457 Rough-in8/9/20188/9/20188/9/2018 1:33:20 PMPPART
Phone #: ###-#### Inspection requested via web by Nicholas Paige- hydronics pressure
MEC18-03889 Final8/8/20188/9/20188/9/2018 12:59:22 PMPPASS
INSTALLER JAROD ###-#### Phone #: ###-#### Inspection requested via web by Aaron Alandt- furnace ac coil co ok
MIS17-00403 MEC-Final8/9/20188/9/20188/9/2018 12:08:25 PMPPASS
Small fryer hood has been deleted and capped off- large pizza hood has two new filters and globes over the lights have been put in place- water heater flue clearances in the attic are ok- signed card
MIS17-00403 MEC-Conference8/9/20188/9/20188/9/2018 12:07:31 PMPDONE
Rich Phone #: ###-####
MEC18-03912 Final8/8/20188/9/20188/9/2018 11:45:07 AMAPASS
Phone #: ###-#### Inspection requested via web by Nicholas Paige- gas pipe on roof for two RTU's ok- final ok
MEC18-03912 Pressure Test8/8/20188/9/20188/9/2018 11:44:19 AMAPASS
Phone #: ###-#### Inspection requested via web by Nicholas Paige- 60lb gas pressure ok for two RTU on roof- access was in the rhino gym next door
MEC18-03811 Rough-in8/8/20188/9/20188/9/2018 11:28:42 AMANR
101,102,201,202,301,302 Phone #: ###-#### Inspection requested via web by Gary Reeves
1st floor crawls not ready- i checked all other floors while i was there and on the 2nd floor 02 room linset insulations needs rip fixed- need to check all exhaust fan connection are sealed with tape. call back in when ready
MEC18-03664 Pressure Test8/8/20188/9/20188/9/2018 11:06:18 AMAPASS
Phone #: ###-#### Inspection requested via web by Nicholas Paige- 20lb gas pressure test ok
MEC18-03083 Final8/8/20188/9/20188/9/2018 10:38:19 AMAPASS
can you please call Gordon when you are on the way his # is ###-#### Phone #: ###-#### Inspection requested via web by Marisa Hone
MEC18-01614 Final8/8/20188/9/20188/9/2018 10:37:13 AMAPASS
Field super: Daryl thomas Phone #: ###-#### Inspection requested via web by Lisa Whitney
MEC17-01063 Final8/8/20188/9/20188/9/2018 10:07:52 AMAPASS
Please call ahead // Elsa Phone #: ###-####
-fireplace final ok