MEC19-04180
| Final | 9/20/2019 | 9/20/2019 | 9/20/2019 3:30:48 PM | P | PASS |
|
|
Re-inspection due to no access - please call ahead 30 minutes, we will meet inspector with ladder. Contact Jordan Van Cleave ###-#### or Quality H;C ###-####. Thank you! Phone #: ###-#### Inspection requested via web by Dianne Maxwell - RTU final ok
|
MEC19-04181
| Final | 9/19/2019 | 9/20/2019 | 9/20/2019 3:02:25 PM | P | PASS |
|
|
Please call Kevin on your way - ###-#### Phone #: ###-#### Inspection requested via web by Arielle Hendricks - final ok
|
MEC19-04181
| Pressure Test | 9/19/2019 | 9/20/2019 | 9/20/2019 3:02:12 PM | P | PASS |
|
|
Please call Kevin on your way - ###-#### Phone #: ###-#### Inspection requested via web by Arielle Hendricks - 20lb gas pressure test ok - tagged meter location
|
MEC19-01155
| Rough-in | 9/20/2019 | 9/20/2019 | 9/20/2019 2:31:55 PM | P | PASS |
|
|
Soffit rough in on condos 202 and 206, Antonio is the contact. Phone #: ###-#### Inspection requested via web by stan lillquist - unit 202 R/I duct seal ok/ dryer is well over 60' in length with fittings and straight pipe -unit 206 R/I duct seal ok
|
MEC19-03802
| Conference | 9/20/2019 | 9/20/2019 | 9/20/2019 1:48:54 PM | P | DONE |
|
|
Questions about foundation Phone #: ###-#### Inspection requested via web by Thomas Dubert - Talked with homeowner about the fireplace being installed. Informed the owner that he needs to pull a building permit for the framing being done and changes to the foundation
|
MEC19-04173
| Final | 9/20/2019 | 9/20/2019 | 9/20/2019 1:34:34 PM | P | FAIL |
|
|
Call ahead to Johnston @ ###-#### Phone #: ###-#### Inspection requested via web by Nicole Smith - need 6" branch on return capped off. - A/C needs secured to pad. When walking passed A/C unit shifted
|
MEC19-03441
| Final | 9/17/2019 | 9/20/2019 | 9/20/2019 1:01:27 PM | P | CANC |
|
|
Please call Alisha ###-#### when in route-- Later is better--house is not occupied and she needs a 45 minute heads up to meet Phone #: ###-#### Inspection requested via web by Justin Osterhout - no access to home - talking with homeowner she is going to schedule a time with the contractor to give me access to home at a later date.
|
MEC19-04157
| Final | 9/18/2019 | 9/20/2019 | 9/20/2019 11:58:49 AM | A | FAIL |
|
|
house is empty and homeowner will not be home the back door will be open or unlocked for access for the inspection with any questions the home owners phone number is ###-#### Phone #: ###-#### Inspection requested via web by Amanda Casper - need to see a plumbing permit pulled for water heater - venting of water heater needs to enter common vent above furnace connection
|
MEC19-04183
| Final | 9/19/2019 | 9/20/2019 | 9/20/2019 11:39:30 AM | A | PASS |
|
|
Please inspect Late AM/Early PM and call Louie on your way - ###-#### Phone #: ###-#### Inspection requested via web by Arielle Hendricks - furnace only co ok
|
MEC19-02242
| Final | 9/19/2019 | 9/20/2019 | 9/20/2019 11:39:15 AM | A | PASS |
|
|
Ed Phone #: ###-#### - furnace ac coil and duct work final ok
|
MEC19-04094
| Pressure Test | 9/19/2019 | 9/20/2019 | 9/20/2019 11:38:31 AM | A | PASS |
|
|
Tim Phone #: ###-#### - 60lb underground to meter ok - 60lb line above ground to water heater ok - tagged meter location - talked with contractor installing 7mill BTU water heater about getting a mechanical permit issued
|
MEC19-02242
| Pressure Test | 9/20/2019 | 9/20/2019 | 9/20/2019 10:25:44 AM | A | PASS |
|
|
Ed Phone #: ###-#### - 20lb gas pressure test ok - tagged meter location
|
MEC19-04180
| Final | 9/19/2019 | 9/20/2019 | 9/20/2019 9:36:53 AM | A | FAIL |
|
|
Phone #: ###-#### Inspection requested via web by Dianne Maxwell - no access to roof
|
MEC19-03970
| Pressure Test | 9/19/2019 | 9/20/2019 | 9/20/2019 9:26:19 AM | A | PASS |
|
|
Phone #: ###-#### Inspection requested via web by Dan McFate - 20lb gas pressure test ok - tagged meter location
|
MEC19-03573
| Final | 9/19/2019 | 9/20/2019 | 9/20/2019 9:06:49 AM | A | PASS |
|
|
or ###-#### Phone #: ###-#### Inspection requested via web by Aaron Alandt - final on units 2,4,9 ok
|
MEC18-05424
| Mec-Aging Inspection | 9/20/2019 | 9/20/2019 | 9/20/2019 8:32:30 AM | | DONE |
|
|
R/I passed 11/13/18. BLD is still open. Schedule final inspection if mechanical work is finished. WIP
|
MEC19-02912
| Final | 9/19/2019 | 9/20/2019 | 9/20/2019 8:24:16 AM | A | PASS |
|
|
Phone #: ###-#### Inspection requested via web by Randy Hart - final ok
|