Inspections for the day of: Friday, January 10, 2020.
Number of inspections: 16
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorTell Riley
TitleBLD-COM/RES INSPECTOR
Phone #830-2752
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
BLD19-01461 BLD-Aging Inspection1/10/20201/10/20201/13/2020 9:04:26 AM CANC
GRD19-00025 GRD-Final1/8/20201/10/20201/10/2020 3:59:24 PMPPASS
Public works is good see activities. bld inspectors final these // ###-#### Andy //
GRD-Public Works Approval 1/8/2020 1/8/2020 1/8/2020 DONE
DetailsTiffany Lowery
Drainage inspection completed for Public Works to include GRD19-00025 as of 10/14/19.///Bob advised to final based on above inspection and approval by PW department//BLD permits have been issued and under way//
BLD19-00527 BLD-Framing/Rough-in1/10/20201/10/20201/10/2020 3:55:43 PMPPART
pre rock areas on 1st and 2nd floors//ok to rock areas to install shower/tubs//
BLD19-02579 BLD-Energy code compliance1/10/20201/10/20201/10/2020 3:54:11 PMPPART
Chris Phone #: ###-####//corrections made//need to post R value cert//do not cover area near gas fireplace per mechanical//
BLD19-02480 BLD-Conference1/10/20201/10/20201/10/2020 3:11:57 PMPPART
ok//shear nailing ok//will need to see STHD straps//
BLD19-02480 BLD-Foundation1/9/20201/10/20201/10/2020 3:11:27 PMAPART
Phone #: ###-#### Inspection requested via web by Joseph Iaccino//west wall ok//will need to see east wall//
BLD19-03717 BLD-Wall Bracing1/10/20201/10/20201/10/2020 2:11:43 PMPPASS
Robert Phone #: ###-####//Gyp board shear ok in the two areas noted on plans//
BLD19-02364 BLD-Conference1/9/20201/10/20201/10/2020 1:51:23 PMADONE
Kirk Phone #: ###-####
BLD19-00534 BLD-Wall Bracing1/8/20201/10/20201/10/2020 12:14:34 PMAPART
Exterior shear and hardware for cover. Interior at a later date Phone #: ###-#### Inspection requested via web by Travis Blackburn//ok to cover exterior with wrap--DO NOT COVER south wall until approved for straps and fixed sheathing//
BLD19-00217 BLD-Blower Door Test Results1/10/20201/10/20201/10/2020 11:06:59 AMADONE
4.6 ACH 50
BLD19-00217 BLD-Final1/9/20201/10/20201/10/2020 11:06:44 AMAPASS
Phone #: ###-#### Inspection requested via web by James Jackson
BLD19-00217 DOC - Permit Finaled1/10/20201/10/20201/10/2020 11:06:29 AMPPASS
BLD19-03841 BLD-Framing/Rough-in1/9/20201/10/20201/10/2020 11:06:15 AMAPASS
Please call when you make it to the house so that we can discuss the additional engineering reports to address the correction letter.
thank you,
Brad Phone #: ###-#### Inspection requested via web by Brad Pfannmuller//corrections made//letter from engineer stamped outlining some corrections that he has approved//ok to insulate//
BLD19-03385 BLD-Final1/9/20201/10/20201/10/2020 9:46:20 AMANR
Larry Phone #: ###-####//will need to get electrical permit and final inspection prior to building final//plumbing removed will need to be capped//if bathroom is allowed to stay, scope of permit needs to be updated, as there is no indication of approval for bathroom to stay in garage//
BLD19-01150 BLD-Energy code compliance1/9/20201/10/20201/10/2020 9:41:24 AMAPASS
John Phone #: ###-####
BLD19-04186 BLD-Conference1/9/20201/10/20201/10/2020 8:49:06 AMADONE
remodeling inconsistent with the approved plans // Michael Hanson Phone #: ###-####//no one onsite,, posted a CN for plan modification if changes are or will be made in use or construction difereing from the scope of work on permit//