BLD19-01461
| BLD-Aging Inspection | 1/10/2020 | 1/10/2020 | 1/13/2020 9:04:26 AM | | CANC |
|
|
|
GRD19-00025
| GRD-Final | 1/8/2020 | 1/10/2020 | 1/10/2020 3:59:24 PM | P | PASS |
|
|
Public works is good see activities. bld inspectors final these // ###-#### Andy // GRD-Public Works Approval 1/8/2020 1/8/2020 1/8/2020 DONE DetailsTiffany Lowery Drainage inspection completed for Public Works to include GRD19-00025 as of 10/14/19.///Bob advised to final based on above inspection and approval by PW department//BLD permits have been issued and under way//
|
BLD19-00527
| BLD-Framing/Rough-in | 1/10/2020 | 1/10/2020 | 1/10/2020 3:55:43 PM | P | PART |
|
|
pre rock areas on 1st and 2nd floors//ok to rock areas to install shower/tubs//
|
BLD19-02579
| BLD-Energy code compliance | 1/10/2020 | 1/10/2020 | 1/10/2020 3:54:11 PM | P | PART |
|
|
Chris Phone #: ###-####//corrections made//need to post R value cert//do not cover area near gas fireplace per mechanical//
|
BLD19-02480
| BLD-Conference | 1/10/2020 | 1/10/2020 | 1/10/2020 3:11:57 PM | P | PART |
|
|
ok//shear nailing ok//will need to see STHD straps//
|
BLD19-02480
| BLD-Foundation | 1/9/2020 | 1/10/2020 | 1/10/2020 3:11:27 PM | A | PART |
|
|
Phone #: ###-#### Inspection requested via web by Joseph Iaccino//west wall ok//will need to see east wall//
|
BLD19-03717
| BLD-Wall Bracing | 1/10/2020 | 1/10/2020 | 1/10/2020 2:11:43 PM | P | PASS |
|
|
Robert Phone #: ###-####//Gyp board shear ok in the two areas noted on plans//
|
BLD19-02364
| BLD-Conference | 1/9/2020 | 1/10/2020 | 1/10/2020 1:51:23 PM | A | DONE |
|
|
Kirk Phone #: ###-####
|
BLD19-00534
| BLD-Wall Bracing | 1/8/2020 | 1/10/2020 | 1/10/2020 12:14:34 PM | A | PART |
|
|
Exterior shear and hardware for cover. Interior at a later date Phone #: ###-#### Inspection requested via web by Travis Blackburn//ok to cover exterior with wrap--DO NOT COVER south wall until approved for straps and fixed sheathing//
|
BLD19-00217
| BLD-Blower Door Test Results | 1/10/2020 | 1/10/2020 | 1/10/2020 11:06:59 AM | A | DONE |
|
|
4.6 ACH 50
|
BLD19-00217
| BLD-Final | 1/9/2020 | 1/10/2020 | 1/10/2020 11:06:44 AM | A | PASS |
|
|
Phone #: ###-#### Inspection requested via web by James Jackson
|
BLD19-00217
| DOC - Permit Finaled | 1/10/2020 | 1/10/2020 | 1/10/2020 11:06:29 AM | P | PASS |
|
|
|
BLD19-03841
| BLD-Framing/Rough-in | 1/9/2020 | 1/10/2020 | 1/10/2020 11:06:15 AM | A | PASS |
|
|
Please call when you make it to the house so that we can discuss the additional engineering reports to address the correction letter. thank you, Brad Phone #: ###-#### Inspection requested via web by Brad Pfannmuller//corrections made//letter from engineer stamped outlining some corrections that he has approved//ok to insulate//
|
BLD19-03385
| BLD-Final | 1/9/2020 | 1/10/2020 | 1/10/2020 9:46:20 AM | A | NR |
|
|
Larry Phone #: ###-####//will need to get electrical permit and final inspection prior to building final//plumbing removed will need to be capped//if bathroom is allowed to stay, scope of permit needs to be updated, as there is no indication of approval for bathroom to stay in garage//
|
BLD19-01150
| BLD-Energy code compliance | 1/9/2020 | 1/10/2020 | 1/10/2020 9:41:24 AM | A | PASS |
|
|
John Phone #: ###-####
|
BLD19-04186
| BLD-Conference | 1/9/2020 | 1/10/2020 | 1/10/2020 8:49:06 AM | A | DONE |
|
|
remodeling inconsistent with the approved plans // Michael Hanson Phone #: ###-####//no one onsite,, posted a CN for plan modification if changes are or will be made in use or construction difereing from the scope of work on permit//
|