Inspections for the day of: Monday, January 13, 2020.
Number of inspections: 17
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorTell Riley
TitleBLD-COM/RES INSPECTOR
Phone #830-2752
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
BLD19-03004 BLD-Framing/Rough-in1/10/20201/13/20201/13/2020 4:55:45 PMPPASS
call for access- Ben Phone #: ###-####
BLD19-03003 BLD-Framing/Rough-in1/10/20201/13/20201/13/2020 4:55:33 PMPPASS
call for access- Ben Phone #: ###-####
BLD19-03794 BLD-Final1/10/20201/13/20201/13/2020 3:23:14 PMPPASS
Phone #: ###-#### Inspection requested via web by Cindy Zickgraf//roof appears to be installed within code requirements//
BLD19-03794 DOC - Permit Finaled1/13/20201/13/20201/13/2020 3:22:12 PMPPASS
BLD19-03261 BLD-Final1/13/20201/13/20201/13/2020 2:43:54 PMPPASS
Chad Phone #: ###-####//ok when fire sprinkler pipes are caulked at penetrations in garage//
BLD19-03261 DOC - Permit Finaled1/13/20201/13/20201/13/2020 2:43:12 PMPPASS
BLD19-03261 BLD-Blower Door Test Results1/13/20201/13/20201/13/2020 2:41:58 PMPDONE
4.81 ACH 50
BLD19-00403 BLD-Final1/13/20201/13/20201/13/2020 1:29:03 PMPNR
noah Phone #: ###-####//talked with contractor and sent info about smoke and CO detectors and location//need plumbing and electrical permits per the description of work//
BLD19-02895 BLD-Final1/13/20201/13/20201/13/2020 12:08:59 PMPFAIL
daniel Phone #: ###-####//CN posted//Setbacks have not been verified and no property pins are visible-talked with contractor on 8/2/2019 about this//sub panel and wires on ground at heat pump hook up//need to install house number// mechanical permit will be needed if heat pump to be installed//
BLD19-00533 BLD-Concrete1/13/20201/13/20201/13/2020 11:50:52 AMPDEFR
Sorry forgot to add this inspection. We are pouring the corridor for building J today at 11. Thanks Phone #: ###-#### Inspection requested via web by Matt Perry//specials will be onsite//defer to special inspections//
BLD19-02972 BLD-Wall cover1/10/20201/13/20201/13/2020 11:06:05 AMACANC
Vedad Phone #: ###-####
BLD19-02972 BLD-Energy code compliance1/10/20201/13/20201/13/2020 11:05:55 AMANR
Vedad Phone #: ###-####//for final will need R 49 per Res check trade offs//
BLD19-04363 BLD-Wall Bracing1/10/20201/13/20201/13/2020 10:30:12 AMAFAIL
shear // Nate Phone #: ###-####//CN posted//need hot dipped in PT and need to add anchor bolts per plans//see plans for header sizes//
BLD19-03422 BLD-Footing1/10/20201/13/20201/13/2020 9:14:57 AMADEFR
rebar- rues Phone #: ###-####//defer to specials, they will be onsite for rebar, formwork and concrete//
MIS19-00049 MIS-Aging Inspection1/13/20201/13/20201/13/2020 9:07:51 AM DONE
permits were issued//BLD is still open//
MIS19-00049 DOC - Permit Finaled1/13/20201/13/20201/13/2020 9:07:27 AMPPASS
MIS19-00039 DOC - Permit Finaled1/13/20201/13/20201/13/2020 9:02:26 AMPPASS
Shed is gone//house is permitted and being built on this lot//