BLD19-03004
| BLD-Framing/Rough-in | 1/10/2020 | 1/13/2020 | 1/13/2020 4:55:45 PM | P | PASS |
|
|
call for access- Ben Phone #: ###-####
|
BLD19-03003
| BLD-Framing/Rough-in | 1/10/2020 | 1/13/2020 | 1/13/2020 4:55:33 PM | P | PASS |
|
|
call for access- Ben Phone #: ###-####
|
BLD19-03794
| BLD-Final | 1/10/2020 | 1/13/2020 | 1/13/2020 3:23:14 PM | P | PASS |
|
|
Phone #: ###-#### Inspection requested via web by Cindy Zickgraf//roof appears to be installed within code requirements//
|
BLD19-03794
| DOC - Permit Finaled | 1/13/2020 | 1/13/2020 | 1/13/2020 3:22:12 PM | P | PASS |
|
|
|
BLD19-03261
| BLD-Final | 1/13/2020 | 1/13/2020 | 1/13/2020 2:43:54 PM | P | PASS |
|
|
Chad Phone #: ###-####//ok when fire sprinkler pipes are caulked at penetrations in garage//
|
BLD19-03261
| DOC - Permit Finaled | 1/13/2020 | 1/13/2020 | 1/13/2020 2:43:12 PM | P | PASS |
|
|
|
BLD19-03261
| BLD-Blower Door Test Results | 1/13/2020 | 1/13/2020 | 1/13/2020 2:41:58 PM | P | DONE |
|
|
4.81 ACH 50
|
BLD19-00403
| BLD-Final | 1/13/2020 | 1/13/2020 | 1/13/2020 1:29:03 PM | P | NR |
|
|
noah Phone #: ###-####//talked with contractor and sent info about smoke and CO detectors and location//need plumbing and electrical permits per the description of work//
|
BLD19-02895
| BLD-Final | 1/13/2020 | 1/13/2020 | 1/13/2020 12:08:59 PM | P | FAIL |
|
|
daniel Phone #: ###-####//CN posted//Setbacks have not been verified and no property pins are visible-talked with contractor on 8/2/2019 about this//sub panel and wires on ground at heat pump hook up//need to install house number// mechanical permit will be needed if heat pump to be installed//
|
BLD19-00533
| BLD-Concrete | 1/13/2020 | 1/13/2020 | 1/13/2020 11:50:52 AM | P | DEFR |
|
|
Sorry forgot to add this inspection. We are pouring the corridor for building J today at 11. Thanks Phone #: ###-#### Inspection requested via web by Matt Perry//specials will be onsite//defer to special inspections//
|
BLD19-02972
| BLD-Wall cover | 1/10/2020 | 1/13/2020 | 1/13/2020 11:06:05 AM | A | CANC |
|
|
Vedad Phone #: ###-####
|
BLD19-02972
| BLD-Energy code compliance | 1/10/2020 | 1/13/2020 | 1/13/2020 11:05:55 AM | A | NR |
|
|
Vedad Phone #: ###-####//for final will need R 49 per Res check trade offs//
|
BLD19-04363
| BLD-Wall Bracing | 1/10/2020 | 1/13/2020 | 1/13/2020 10:30:12 AM | A | FAIL |
|
|
shear // Nate Phone #: ###-####//CN posted//need hot dipped in PT and need to add anchor bolts per plans//see plans for header sizes//
|
BLD19-03422
| BLD-Footing | 1/10/2020 | 1/13/2020 | 1/13/2020 9:14:57 AM | A | DEFR |
|
|
rebar- rues Phone #: ###-####//defer to specials, they will be onsite for rebar, formwork and concrete//
|
MIS19-00049
| MIS-Aging Inspection | 1/13/2020 | 1/13/2020 | 1/13/2020 9:07:51 AM | | DONE |
|
|
permits were issued//BLD is still open//
|
MIS19-00049
| DOC - Permit Finaled | 1/13/2020 | 1/13/2020 | 1/13/2020 9:07:27 AM | P | PASS |
|
|
|
MIS19-00039
| DOC - Permit Finaled | 1/13/2020 | 1/13/2020 | 1/13/2020 9:02:26 AM | P | PASS |
|
|
Shed is gone//house is permitted and being built on this lot//
|