Inspections for the day of: Tuesday, January 14, 2020.
Number of inspections: 16
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorTell Riley
TitleBLD-COM/RES INSPECTOR
Phone #830-2752
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
MIS19-00057 MIS-Aging Inspection1/14/20201/14/20201/15/2020 3:18:21 PM DONE
MIS19-00054 MIS-Aging Inspection1/14/20201/14/20201/15/2020 3:17:01 PM CANC
does not look like issue was resolved//
BLD19-00534 BLD-Wall Bracing1/14/20201/14/20201/14/2020 3:53:09 PMPPART
Shear inspection on last wall and h2.5''s to be covered at eves Phone #: ###-#### Inspection requested via web by Travis Blackburn//shear area on exterior south wall ok//see CN for other areas requested to look at//
MIS20-00010 Set Bond Amount1/14/20201/14/20201/14/2020 3:30:24 PMPCANC
BLD19-02972 BLD-Final1/13/20201/14/20201/14/2020 3:30:09 PMAPASS
call prior vedad Phone #: ###-####//final complete when bollard added to protect mechanical-discussed with Vedad onsite//
BLD19-02972 DOC - Permit Finaled1/14/20201/14/20201/14/2020 3:29:25 PMPPASS
MIS20-00010 Set Bond Amount1/13/20201/14/20201/14/2020 3:29:11 PMADONE
Andrea or David Phone #: ###-####//ok with $10,600 bond on file//total of 5 buildings//
BLD19-03841 BLD-Energy code compliance1/14/20201/14/20201/14/2020 2:42:30 PMPPASS
Phone #: ###-#### Inspection requested via web by Brad Pfannmuller
BLD19-00362 BLD-Ceiling Grid Inspection1/14/20201/14/20201/14/2020 1:21:45 PMPPART
Troy Phone #: ###-####//area C classrooms ok to cover//

Note: fire wall will need to be inspected for penetrations and fire caulking in the end rooms and hallway//
BLD19-02972 BLD-Blower Door Test Results1/14/20201/14/20201/14/2020 12:46:19 PMADONE
3.95 ACH 50
BLD19-02382 BLD-Blower Door Test Results1/14/20201/14/20201/14/2020 10:43:36 AMADONE
4.8 ACH 50
BLD19-02382 BLD-Final1/13/20201/14/20201/14/2020 10:36:59 AMAFAIL
Phone #: ###-#### Inspection requested via web by James Jackson//CN posted on electrical panel--need to seal gyp board behind and around furnace--need to fix smoke detector in 1st floor bedroom, battery not installed/or dead//
BLD19-02384 BLD-Final1/13/20201/14/20201/14/2020 10:35:49 AMAFAIL
Phone #: ###-#### Inspection requested via web by James Jackson//CN posted on electrical panel--need bollard for mechanical protection-need to seal gyp board behind furnace//
BLD19-02384 BLD-Blower Door Test Results1/14/20201/14/20201/14/2020 10:14:40 AMADONE
5.0 ACH 50
BLD19-01380 BLD-Conference1/13/20201/14/20201/14/2020 9:45:11 AMADONE
Still waiting for HVAC final but thought since you would be checking the property next door that you could review and tell us if there are any items we should do before final. Thanks Phone #: ###-#### Inspection requested via web by Braden Holbrook
BLD18-02912 BLD-Framing/Rough-in1/13/20201/14/20201/14/2020 9:44:58 AMAPASS
Phone #: ###-#### Inspection requested via web by Braden Holbrook//ok to insulate//still need to add truss bracing//