BLD19-02384
| BLD-Final | 1/14/2020 | 1/15/2020 | 1/15/2020 3:44:09 PM | P | PASS |
|
|
Phone #: ###-#### Inspection requested via web by James Jackson//corrections made//final complete//
|
BLD19-02384
| DOC - Permit Finaled | 1/15/2020 | 1/15/2020 | 1/15/2020 3:43:49 PM | P | PASS |
|
|
|
BLD19-02382
| BLD-Final | 1/14/2020 | 1/15/2020 | 1/15/2020 3:32:57 PM | P | PASS |
|
|
Phone #: ###-#### Inspection requested via web by James Jackson//corrections made final complete//
|
BLD19-02382
| DOC - Permit Finaled | 1/15/2020 | 1/15/2020 | 1/15/2020 3:32:39 PM | P | PASS |
|
|
|
MIS19-00057
| DOC - Permit Finaled | 1/15/2020 | 1/15/2020 | 1/15/2020 3:18:09 PM | P | PASS |
|
|
ELE-Final 3/11/2019 3/11/2019 3/11/2019 A PASS DetailsTom Saunders permit was pulled ELE19-00805 inspected and resulted 3/7/19
|
BLD19-03912
| BLD-Framing/Rough-in | 1/14/2020 | 1/15/2020 | 1/15/2020 3:00:40 PM | P | CANC |
|
|
Rocky Phone #: ###-####//cancel per Darren//was needing electrical rough in//
|
BLD19-01949
| BLD-Framing/Rough-in | 1/15/2020 | 1/15/2020 | 1/15/2020 2:48:24 PM | P | PASS |
|
|
Doyle- call for access Phone #: ###-####//final framing for wall accents, installed ledgers with lags and a 35 clips per plans//sheathing was installed at time of inspeciton//
|
BLD19-04186
| BLD-Final | 1/14/2020 | 1/15/2020 | 1/15/2020 1:23:53 PM | P | CANC |
|
|
Suman Phone #: ###-####//needs fire life safety inspection completed//
|
BLD19-03234
| BLD-Final | 1/14/2020 | 1/15/2020 | 1/15/2020 12:16:18 PM | A | NR |
|
|
verify tenant has vacated // Gemma Phone #: ###-####//discussed getting final on fire alarm with Todd, inspection scheduled, and he will get finals scheduled as well//Also let Jason know//
|
BLD19-03228
| BLD-Wall Bracing | 1/13/2020 | 1/15/2020 | 1/15/2020 10:44:47 AM | A | FAIL |
|
|
Phone #: ###-#### Inspection requested via web by Gus Brandon//CN posted//see plans pg S2 for red marks and details//
|
BLD19-02697
| BLD-Wall Bracing | 1/13/2020 | 1/15/2020 | 1/15/2020 10:24:53 AM | A | FAIL |
|
|
Phone #: ###-#### Inspection requested via web by Gus Brandon//CN posted//still need to add straps and nails straps at 2nd floor--add SDS screws at shear walls//3rd floor needs 16d nails in plates at shear walls//
|