BLD19-04778
| BLD-Footing | 1/20/2020 | 1/21/2020 | 1/21/2020 3:52:58 PM | P | PART |
|
|
Phone #: 2089109404 >> Inspection requested via mobile web by Ricardo aggregate constru//setbacks set by surveyor//rebar per plans//need to install ufer ground//
|
BLD19-04776
| BLD-Footing | 1/20/2020 | 1/21/2020 | 1/21/2020 3:51:41 PM | P | PART |
|
|
Phone #: 2089109404 >> Inspection requested via mobile web by Ricardo aggregate constru//setbacks set by surveyor//rebar per plans//need to install ufer ground//
|
BLD19-04777
| BLD-Footing | 1/20/2020 | 1/21/2020 | 1/21/2020 3:51:26 PM | P | PART |
|
|
Phone #: 2089109404 >> Inspection requested via mobile web by Ricardo aggregate constru//setbacks set by surveyor//rebar per plans//need to install ufer ground//
|
BLD19-04779
| BLD-Footing | 1/20/2020 | 1/21/2020 | 1/21/2020 3:50:13 PM | P | PART |
|
|
Phone #: 2089109404 >> Inspection requested via mobile web by Ricardo aggregate constru//setbacks set by surveyor marks//rebar ok per plans//need to add Ufer per plans//
|
BLD19-02037
| BLD-Conference | 1/14/2020 | 1/21/2020 | 1/21/2020 2:58:46 PM | P | DONE |
|
|
Phone #: ###-#### Inspection requested via web by Zach Carter
|
BLD19-00556
| BLD-Framing/Rough-in | 1/17/2020 | 1/21/2020 | 1/21/2020 2:36:20 PM | P | PASS |
|
|
damon Phone #: ###-####//corrections made from walk through//ok to insulate only//will need fireplace sign off prior to cover//
|
BLD19-00361
| BLD-Other | 1/21/2020 | 1/21/2020 | 1/21/2020 1:38:49 PM | P | NR |
|
|
Charles- need to cover Phone #: ###-####//need mechanical rough in inspection for vents and added system in bathroom areas//ok to insulate rafters once complete//
|
BLD19-01649
| BLD-Wall cover | 1/21/2020 | 1/21/2020 | 1/21/2020 12:42:29 PM | P | PART |
|
|
attic firewalls; Phone #: ###-####/fire wall per plans//NEED TO FIRE CUALK WIRE AND PIPE PENETRATIONS//
|
BLD20-00098
| BLD-Footing | 1/21/2020 | 1/21/2020 | 1/21/2020 12:25:55 PM | P | PART |
|
|
Pour at 1:30 // Mark Phone #: ###-####//setbacks ok per plans//WIP//
|
MIS19-00074
| MIS-Aging Inspection | 1/21/2020 | 1/21/2020 | 1/21/2020 11:40:51 AM | | DONE |
|
|
ESC-Conference 4/22/2019 5/2/2019 5/10/2019 P PASS
DetailsAndy J. Long Trash pile cleaned up and hauled away. Correction complete. Case closed.
|
MIS19-00074
| DOC - Permit Finaled | 1/21/2020 | 1/21/2020 | 1/21/2020 11:40:24 AM | P | PASS |
|
|
|
BLD19-02583
| BLD-Final | 1/17/2020 | 1/21/2020 | 1/21/2020 11:05:41 AM | A | PASS |
|
|
brandon Phone #: ###-####//corrections made//sreen door removed at accessible entry//accesible entry route signs installed//
|
BLD20-00165
| BLD-Final | 1/17/2020 | 1/21/2020 | 1/21/2020 10:28:47 AM | A | PASS |
|
|
Walter Phone #: ###-####
|
BLD20-00165
| DOC - Permit Finaled | 1/21/2020 | 1/21/2020 | 1/21/2020 10:28:36 AM | P | PASS |
|
|
|
BLD19-03422
| BLD-Foundation | 1/21/2020 | 1/21/2020 | 1/21/2020 10:18:20 AM | A | PART |
|
|
We are pouring the two short return walls and the building face of the utility trench in the future building. Nothing too structural. The pour is scheduled for 11 am with MTI and and RSCI quality control both present. Phone #: ###-#### Inspection requested via web by John Cloninger//rebar clearances ok//Sill plate anchors preset in wall on exterior side//ok pending all specials//
|
BLD12-00075
| BLD-Wall Bracing | 1/20/2020 | 1/21/2020 | 1/21/2020 10:13:52 AM | A | CANC |
|
|
We are pouring the two short return walls and the building face of the utility trench in the future building. Nothing too structural. The pour is scheduled for 11 am with MTI and and RSCI quality control both present. Phone #: ###-#### Inspection requested via web by John Cloninger
|
BLD19-04363
| BLD-Wall Bracing | 1/17/2020 | 1/21/2020 | 1/21/2020 9:15:37 AM | A | PASS |
|
|
shear // Joseph Phone #: ###-####//ok when hot dipped nails added to PT plate-discussed with contractor onsite//
|