Inspections for the day of: Tuesday, January 21, 2020.
Number of inspections: 17
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorTell Riley
TitleBLD-COM/RES INSPECTOR
Phone #830-2752
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
BLD19-04778 BLD-Footing1/20/20201/21/20201/21/2020 3:52:58 PMPPART
Phone #: 2089109404 >> Inspection requested via mobile web by Ricardo aggregate constru//setbacks set by surveyor//rebar per plans//need to install ufer ground//
BLD19-04776 BLD-Footing1/20/20201/21/20201/21/2020 3:51:41 PMPPART
Phone #: 2089109404 >> Inspection requested via mobile web by Ricardo aggregate constru//setbacks set by surveyor//rebar per plans//need to install ufer ground//
BLD19-04777 BLD-Footing1/20/20201/21/20201/21/2020 3:51:26 PMPPART
Phone #: 2089109404 >> Inspection requested via mobile web by Ricardo aggregate constru//setbacks set by surveyor//rebar per plans//need to install ufer ground//
BLD19-04779 BLD-Footing1/20/20201/21/20201/21/2020 3:50:13 PMPPART
Phone #: 2089109404 >> Inspection requested via mobile web by Ricardo aggregate constru//setbacks set by surveyor marks//rebar ok per plans//need to add Ufer per plans//
BLD19-02037 BLD-Conference1/14/20201/21/20201/21/2020 2:58:46 PMPDONE
Phone #: ###-#### Inspection requested via web by Zach Carter
BLD19-00556 BLD-Framing/Rough-in1/17/20201/21/20201/21/2020 2:36:20 PMPPASS
damon Phone #: ###-####//corrections made from walk through//ok to insulate only//will need fireplace sign off prior to cover//
BLD19-00361 BLD-Other1/21/20201/21/20201/21/2020 1:38:49 PMPNR
Charles- need to cover Phone #: ###-####//need mechanical rough in inspection for vents and added system in bathroom areas//ok to insulate rafters once complete//
BLD19-01649 BLD-Wall cover1/21/20201/21/20201/21/2020 12:42:29 PMPPART
attic firewalls; Phone #: ###-####/fire wall per plans//NEED TO FIRE CUALK WIRE AND PIPE PENETRATIONS//
BLD20-00098 BLD-Footing1/21/20201/21/20201/21/2020 12:25:55 PMPPART
Pour at 1:30 // Mark Phone #: ###-####//setbacks ok per plans//WIP//
MIS19-00074 MIS-Aging Inspection1/21/20201/21/20201/21/2020 11:40:51 AM DONE
ESC-Conference 4/22/2019 5/2/2019 5/10/2019 P PASS



DetailsAndy J. Long
Trash pile cleaned up and hauled away. Correction complete. Case closed.
MIS19-00074 DOC - Permit Finaled1/21/20201/21/20201/21/2020 11:40:24 AMPPASS
BLD19-02583 BLD-Final1/17/20201/21/20201/21/2020 11:05:41 AMAPASS
brandon Phone #: ###-####//corrections made//sreen door removed at accessible entry//accesible entry route signs installed//
BLD20-00165 BLD-Final1/17/20201/21/20201/21/2020 10:28:47 AMAPASS
Walter Phone #: ###-####
BLD20-00165 DOC - Permit Finaled1/21/20201/21/20201/21/2020 10:28:36 AMPPASS
BLD19-03422 BLD-Foundation1/21/20201/21/20201/21/2020 10:18:20 AMAPART
We are pouring the two short return walls and the building face of the utility trench in the future building. Nothing too structural. The pour is scheduled for 11 am with MTI and and RSCI quality control both present. Phone #: ###-#### Inspection requested via web by John Cloninger//rebar clearances ok//Sill plate anchors preset in wall on exterior side//ok pending all specials//
BLD12-00075 BLD-Wall Bracing1/20/20201/21/20201/21/2020 10:13:52 AMACANC
We are pouring the two short return walls and the building face of the utility trench in the future building. Nothing too structural. The pour is scheduled for 11 am with MTI and and RSCI quality control both present. Phone #: ###-#### Inspection requested via web by John Cloninger
BLD19-04363 BLD-Wall Bracing1/17/20201/21/20201/21/2020 9:15:37 AMAPASS
shear // Joseph Phone #: ###-####//ok when hot dipped nails added to PT plate-discussed with contractor onsite//