MIS19-00081
| MIS-Aging Inspection | 1/23/2020 | 1/23/2020 | 1/27/2020 8:44:27 AM | | DONE |
|
|
BLD-Conference 3/27/2019 3/27/2019 3/28/2019 P DONE DetailsJim Sly Possible work being done on sign without permit being issued Unable to find any work being done on any signs.....
|
MIS18-00353
| MIS-Aging Inspection | 1/23/2020 | 1/23/2020 | 1/27/2020 8:42:42 AM | | CANC |
|
|
|
BLD19-00527
| BLD-Framing/Rough-in | 1/22/2020 | 1/23/2020 | 1/23/2020 4:31:59 PM | P | PART |
|
|
3rd floor inspection of trusses/hardware to start the process of inspections for cover Phone #: ###-#### Inspection requested via web by Travis Blackburn//need to add nails to hangers, fix hangers where noted are wrong, add studs at girder and uplift brackets//bracing ok//trusses only//
|
BLD18-01140
| BLD-Final | 1/23/2020 | 1/23/2020 | 1/23/2020 4:30:49 PM | P | FAIL |
|
|
call for access - John Phone #: ###-####//CN issued--no inspections were completed after the footing inspections//will need engineers as built prior to final//all trades have been finaled//
|
BLD19-03841
| BLD-Wall cover | 1/23/2020 | 1/23/2020 | 1/23/2020 3:46:09 PM | P | PART |
|
|
Drywall Sheer inspection Phone #: ###-#### Inspection requested via web by Brad Pfannmuller//ok when added screws installed as marked on plans//
|
BLD19-04342
| BLD-Framing/Rough-in | 1/23/2020 | 1/23/2020 | 1/23/2020 1:41:59 PM | P | PART |
|
|
Dave Phone #: ###-####//need to complete plan mod for poly deck as plans show attachment to concrete--also added door and window not shown on plans//will need to be completed prior to final inspection//
|
BLD19-02932
| BLD-Framing/Rough-in | 1/22/2020 | 1/23/2020 | 1/23/2020 1:24:08 PM | P | FAIL |
|
|
Graciela Phone #: ###-####//needed shear--failed--discussed onsite//CN issued//will need plan mod for moved wall or meet plans//roof framing does not meet plans either//
|
BLD19-03209
| BLD-Ceiling Grid Inspection | 1/22/2020 | 1/23/2020 | 1/23/2020 12:52:17 PM | P | PART |
|
|
TOM Phone #: ###-####//phase 2 grid//ok pending mechanical this afternoon//wing wall ok//
|
BLD20-00207
| BLD-Final | 1/22/2020 | 1/23/2020 | 1/23/2020 11:23:25 AM | P | CANC |
|
|
Susana Phone #: ###-####//did not pass mechanical for hood or fire life safety//
|
BLD19-04651
| BLD-Footing | 1/21/2020 | 1/23/2020 | 1/23/2020 11:21:11 AM | A | PASS |
|
|
late am // Damon Phone #: ###-####//setbacks tight on sides--will recheck at wall inspection//rebar installed per plans//
|
BLD19-04296
| BLD-Framing/Rough-in | 1/22/2020 | 1/23/2020 | 1/23/2020 10:15:13 AM | A | PASS |
|
|
Billy Phone #: ###-####//will need to add 1hr rated soffits per plans and call for inspection//no penetrations
|
BLD19-03555
| BLD-Framing/Rough-in | 1/22/2020 | 1/23/2020 | 1/23/2020 9:29:17 AM | A | PASS |
|
|
Phone #: ###-#### Inspection requested via web by Christian Mikesell//ok to insulate//will need to check shear on inside//
|