Inspections for the day of: Monday, January 27, 2020.
Number of inspections: 12
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorTell Riley
TitleBLD-COM/RES INSPECTOR
Phone #830-2752
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
BLD19-00526 BLD-Wall Bracing1/27/20201/27/20201/27/2020 3:44:57 PMPPART
Shear inspection of exterior panels on bldg A. Phone #: ###-#### Inspection requested via web by Travis Blackburn//need to add nails in areas discussed at area 4//need to add hot dip galvanized nails at PT//
BLD19-03357 BLD-Other1/27/20201/27/20201/27/2020 3:21:57 PMPNR
Inspection for fire rated soffits on the west side of home. Phone #: ###-#### Inspection requested via web by Alex Macdoanld//needs soffits installed//overhang needs cut back to meet the 2 feet min setback for overhangs per the plans//
BLD18-01882 BLD-Final1/27/20201/27/20201/27/2020 3:20:15 PMPPASS
need passing final inspection to close out permit please//final was complete pending other required inspections//
BLD19-03493 BLD-Final1/24/20201/27/20201/27/2020 3:19:36 PMPNR
marcus Phone #: ###-####//needs fire life safety//had a phone conference to discuss other inspections noted,, advised to have electrical and mechanical removed from permit//
BLD19-03015 BLD-Final1/24/20201/27/20201/27/2020 1:02:44 PMPPASS
I''m available anytime after 11:00. Phone #: ###-#### Inspection requested via web by Gary Betts//trades finals complete//structure complete per plans and engineering--revised engineering for lateral bolts reviewed onsite from engineer//
BLD19-03015 DOC - Permit Finaled1/27/20201/27/20201/27/2020 1:01:40 PMPPASS
BLD19-02895 BLD-Final1/27/20201/27/20201/27/2020 12:05:05 PMPPART
Daniel Phone #: ###-####//still needs address # posted//electrical outlet near side door needs cover//steback issue ok per zoning//
BLD19-03422 BLD-Foundation1/27/20201/27/20201/27/2020 11:17:49 AMPDEFR
Footer inspection Phone #: ###-#### Inspection requested via web by John Cloninger//defer to specials//
BLD19-04116 BLD-Framing/Rough-in1/27/20201/27/20201/27/2020 11:04:18 AMANR
Phone #: ###-#### Inspection requested via web by Joel Hirtle//not all corrections were completed//discussed adding bearing under pop out on 2nd floor//
BLD20-00097 BLD-Foundation1/24/20201/27/20201/27/2020 11:02:27 AMAPART
pouring at 12:45 pm- Mark Phone #: ###-####//WIP//
BLD19-04318 BLD-Final1/23/20201/27/20201/27/2020 10:43:20 AMANR
Russel Phone #: ###-####2//need to add smoke CO at 1st floor//
MIS19-00081 DOC - Permit Finaled1/27/20201/27/20201/27/2020 8:43:59 AMPPASS