BLD18-02167
| BLD-Final | 1/3/2020 | 1/6/2020 | 1/6/2020 3:26:17 PM | P | CANC |
|
|
for TCO - after 2pm // Farid//talked with Farid about putting up a guard over window that is not safety glazed for TCO//will call tomorrow when guard is installed//
|
BLD19-02700
| BLD-Wall Bracing | 1/6/2020 | 1/6/2020 | 1/6/2020 3:23:19 PM | P | FAIL |
|
|
brandon Phone #: ###-####//area in garage that needed blocked at joints and nailed has been taped and mudded--cannot see nails to verify blocking//CN still posted//
|
BLD19-02579
| BLD-Framing/Rough-in | 1/6/2020 | 1/6/2020 | 1/6/2020 3:02:53 PM | P | PASS |
|
|
chris Phone #: ###-####//corrections made//ok to insulate//
|
BLD19-04031
| BLD-Wall Bracing | 1/6/2020 | 1/6/2020 | 1/6/2020 2:25:09 PM | P | PASS |
|
|
JEFF Phone #: ###-####//nailing ok//need to add straps at portal frame inside of header--will check at framing//
|
BLD19-04031
| BLD-Foundation | 1/6/2020 | 1/6/2020 | 1/6/2020 2:24:29 PM | P | DEFR |
|
|
no foundation inspection was scheduled//foundation was poured without inspection//contractor assumes all liability on foundation//
|
BLD18-02167
| BLD-Foundation | 1/6/2020 | 1/6/2020 | 1/6/2020 2:23:44 PM | P | CANC |
|
|
|
BLD19-04344
| BLD-Final | 1/6/2020 | 1/6/2020 | 1/6/2020 1:49:23 PM | P | PASS |
|
|
Elaina- may go as early as possible Phone #: ###-####//life safety ok, shower complete//final finishes, flooring and trim work not complete at final//
|
BLD19-04344
| DOC - Permit Finaled | 1/6/2020 | 1/6/2020 | 1/6/2020 1:48:19 PM | P | PASS |
|
|
|
BLD19-04729
| BLD-Final | 1/6/2020 | 1/6/2020 | 1/6/2020 1:16:07 PM | P | PASS |
|
|
call for access // Michael Phone #: ###-####
|
BLD19-04729
| DOC - Permit Finaled | 1/6/2020 | 1/6/2020 | 1/6/2020 1:15:57 PM | P | PASS |
|
|
|
BLD19-00527
| BLD-Wall Bracing | 1/3/2020 | 1/6/2020 | 1/6/2020 12:37:41 PM | A | PART |
|
|
Verify hardware at 1st floor sufficient per RFI Phone #: ###-#### Inspection requested via web by Travis Blackburn//hold downs ok other than those marked-one missing nut-one missing completely//
|
BLD19-00534
| BLD-Wall Bracing | 1/3/2020 | 1/6/2020 | 1/6/2020 12:36:52 PM | A | PART |
|
|
Shear inspection and hardware inspection Phone #: ###-#### Inspection requested via web by Travis Blackburn//nailing ok//need to finish straps//provide documentation on nails in pressure treat or use hot dipped galvanized//will need to check hold downs//
|
BLD19-04050
| BLD-Framing/Rough-in | 1/3/2020 | 1/6/2020 | 1/6/2020 11:07:55 AM | A | PASS |
|
|
Scott Phone #: ###-####//ok, need to maintain clearance at toilet where post will be//
|
BLD19-03717
| BLD-Energy code compliance | 1/3/2020 | 1/6/2020 | 1/6/2020 10:47:29 AM | A | PASS |
|
|
Robert Phone #: ###-####
|
BLD19-03717
| BLD-Framing/Rough-in | 1/6/2020 | 1/6/2020 | 1/6/2020 10:47:13 AM | A | PASS |
|
|
Framing corrections made//Mechancal roughs ok//
|
BLD19-03841
| BLD-Framing/Rough-in | 1/6/2020 | 1/6/2020 | 1/6/2020 10:22:22 AM | A | FAIL |
|
|
Phone #: ###-#### Inspection requested via web by Brad Pfannmuller//CN posted-to many to list see onsite//
|
BLD19-03841
| BLD-Energy code compliance | 1/3/2020 | 1/6/2020 | 1/6/2020 10:21:50 AM | A | CANC |
|
|
Phone #: ###-#### Inspection requested via web by Brad Pfannmuller//needed framing//
|
BLD19-04725
| BLD-Foundation | 1/3/2020 | 1/6/2020 | 1/6/2020 9:16:19 AM | A | PART |
|
|
Brian Phone #: ###-####//outside of garage piers//rebar ok, added ties and j-verts-ok per conversation with design engineer//specials were done for epoxy rebar//pend specials required for concrete on #310 form//
|
MIS18-00322
| DOC - Permit Finaled | 1/6/2020 | 1/6/2020 | 1/6/2020 8:51:02 AM | P | PASS |
|
|
BLD18-00055 Finaled BLD-Final 10/26/2018 10/26/2018 10/26/2018 P PASS
|