Inspections for the day of: Monday, October 14, 2019.
Number of inspections: 20
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorTell Riley
TitleBLD-COM/RES INSPECTOR
Phone #830-2752
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
BLD19-01048 BLD-Energy code compliance10/12/201910/14/201910/14/2019 3:57:59 PMPPASS
Later the better in the afternoon. Addition is being insulated that morning. Back door will be unlocked. Contact Eric the home owner ###-#### Phone #: ###-#### Inspection requested via web by Eric Mccray
BLD19-03229 BLD-Foundation10/14/201910/14/201910/14/2019 3:48:54 PMPPART
Cergo Phone #: ###-####//WIP//need to install hold downs//
BLD19-03253 BLD-Foundation10/14/201910/14/201910/14/2019 3:48:24 PMPPART
Cergo Phone #: ###-####//WIP// need to install hold downs//
BLD19-03247 BLD-Foundation10/14/201910/14/201910/14/2019 3:47:51 PMPPART
Cergo Phone #: ###-####//WIP//need to install hold downs//
BLD19-03248 BLD-Foundation10/14/201910/14/201910/14/2019 3:47:18 PMPPART
Cergo Phone #: ###-####//WIP// need to install hold downs//
BLD19-03976 BLD-Conference10/14/201910/14/201910/14/2019 2:46:36 PMPDONE
Initial meeting for basement and hall framing plan. Stair plan as well. Anytime after noon works, call Kyle en route. Thanks. Phone #: ###-#### Inspection requested via web by Kyle Bilinski
BLD19-00138 BLD-Final10/10/201910/14/201910/14/2019 2:46:17 PMPPART
Emmanual Phone #: ###-####//temp ok to move equipment in//no card onsite//need verification of accessible restroom from architect-dimensions on plans do not reflect actual//transition is too tall at restroom door//call for final when resolved//
BLD19-00536 BLD-Concrete10/9/201910/14/201910/14/2019 2:06:26 PMPPASS
This is for the slab for our clubhouse. The pour actually takes place on Tuesday 10/15/19 at 6:30am Phone #: ###-#### Inspection requested via web by Matt Perry//vapor barrier ok//no bar for slab//specials will test concrete at time of pour///
BLD19-00534 BLD-Concrete10/14/201910/14/201910/14/2019 2:05:33 PMPPASS
Concrete pour at 1pm. Inspection on reinforcing steel at edges of corridor Phone #: ###-#### Inspection requested via web by Travis Blackburn//ok pending specials//
BLD19-02245 BLD-Final10/14/201910/14/201910/14/2019 12:22:47 PMPPASS
Please call home owner at ###-#### to verify access prior to arrival. Phone #: ###-#### Inspection requested via web by Dustin Collins//final complete//
BLD19-02245 DOC - Permit Finaled10/14/201910/14/201910/14/2019 12:22:26 PMPPASS
BLD19-00535 BLD-Concrete10/9/201910/14/201910/14/2019 11:55:55 AMAPART
We are pouring the stem walls for Building L (This building at 1pm. Phone #: ###-#### Inspection requested via web by Matt Perry//need to meet bar clearances//specials will be completed//ok when specials pass//
BLD19-04098 BLD-Final10/14/201910/14/201910/14/2019 11:54:45 AMPPASS
Inspection requested via web by Ira Rutledge//roof appears to be installed within code requirements//
BLD19-04098 DOC - Permit Finaled10/14/201910/14/201910/14/2019 11:54:03 AMPPASS
BLD19-03924 BLD-Footing10/11/201910/14/201910/14/2019 10:18:27 AMAPART
Phone #: ###-####//footing depth ok//setbacks were reduced from site plans to 6+ feet--zoning review allows 5 ft side setback--all other setbacks same as siteplan//no posts set at time of inspection//ok to set posts and pour footings//
BLD19-02384 BLD-Framing/Rough-in10/11/201910/14/201910/14/2019 9:55:39 AMAPART
Phone #: ###-#### Inspection requested via web by James Jackson//need truss plans and fire blocking at concealed space//ok to insulate only//
BLD19-04050 BLD-Conference10/11/201910/14/201910/14/2019 9:30:52 AMADONE
Scott Phone #: ###-####
BLD18-03484 BLD-Aging Inspection10/14/201910/14/201910/14/2019 8:18:52 AM CANC
entire project almost complete//
BLD19-00239 BLD-Final10/11/201910/14/201910/14/2019 8:18:28 AMACANC
Drew Phone #: ###-####//cancel per Judith//will reschedule//
BLD19-01048 BLD-Energy code compliance10/11/201910/14/201910/12/2019 9:34:37 AMPCANC
Back door is unlocked. Call Eric at ###-#### with questions Phone #: ###-#### >> Inspection requested via web by Eric Mccray Inspection cancelled from web by: Eric Mccray