Inspections for the day of: Thursday, October 24, 2019.
Number of inspections: 27
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorTell Riley
TitleBLD-COM/RES INSPECTOR
Phone #830-2752
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
BLD19-01303 BLD-Foundation10/24/201910/24/201910/25/2019 11:47:53 AMPDEFR
Phone #: 2089656103 >> Inspection requested via mobile web by Alvaro//defer to special inspection//spoke with contact and rebar, formwork and concrete testing will be performed//
BLD18-03122 BLD-Final10/24/201910/24/201910/24/2019 4:10:51 PMPPASS
PATT Phone #: ###-####//corrections made//window opening devices installed on windows under 36" sill--only a couple units//all other required inspections complete--verified online//signed card for all units//
BLD19-02871 BLD-Conference10/24/201910/24/201910/24/2019 3:46:50 PMPDONE
met onsite with GC over setbacks//no pins were located--looks to be in location of prior MH based on Google images and parcel data//talked with Bob and discussed situation//should be fine to continue//
BLD19-03880 BLD-Final10/23/201910/24/201910/24/2019 3:15:38 PMPNR
Pls contact Bryce (Foreman) @ ###-#### or Barry (Electrician) @ ###-#### one hr prior or if you have any questions. Thank you. Inspection requested via web by Rob Maes//need to see plans for setbacks on roof eaves and valleys//knocked on door no one home//
BLD19-02062 BLD-Final10/24/201910/24/201910/24/2019 3:11:23 PMPPART
Mike Phone #: ###-####//need to edit description of remodel as basement descrition is not complete//basement bath updated--first floor remodel complete//smoke combos updated per code//
BLD19-04043 BLD-Foundation10/23/201910/24/201910/24/2019 3:11:05 PMPNR
Mike Phone #: ###-####//needs to have geotech report prior to footing//talked with GC he will contact PW department//
BLD19-01000 BLD-Final10/24/201910/24/201910/24/2019 2:15:17 PMPFAIL
Mark Phone #: ###-####//correction notice issued//need to add combo smoke detector//guard too low at upper deck//adjust garage man door hinges//need blower door test//seal separation wall penetrations//
BLD19-02692 BLD-Framing/Rough-in10/24/201910/24/201910/24/2019 1:32:27 PMPPASS
Scott Phone #: ###-####//ok to cover walls and hardlids//
BLD19-02579 BLD-Foundation10/23/201910/24/201910/24/2019 12:58:32 PMPPART
Phone #: 2089109404 >> Inspection requested via mobile web by Ricardo aggregate constru//WIP//will need to demo exisitng crawl access for and add footing per plan for girder truss bearing//
BLD19-02936 BLD-Framing/Rough-in10/24/201910/24/201910/24/2019 12:37:10 PMPPART
Randell Phone #: ###-####//ok when blocking added per structural detail//discussed onsite//front entry upper walls//
BLD19-00125 BLD-Final10/23/201910/24/201910/24/2019 12:01:44 PMAPASS
Please call before. Phone #: ###-#### Inspection requested via web by Vaughn Pruett//approved plans provided//corrections made//upper kitchen moved to interior wall--only difference on plans//final complete per approved plans//
BLD19-00125 DOC - Permit Finaled10/24/201910/24/201910/24/2019 12:00:40 PMPPASS
BLD19-02690 BLD-Foundation10/23/201910/24/201910/24/2019 11:30:04 AMAPASS
Phone #: ###-#### Inspection requested via web by Vaughn Pruett
MIS19-00352 BLD-Conference10/23/201910/24/201910/24/2019 10:59:38 AMADONE
no one was home//left correction notice to obtain permits and contact PDS for setbacks regarding pipline//will check back 1 week//
BLD19-00526 BLD-Concrete10/23/201910/24/201910/24/2019 10:44:00 AMAPASS
Special Inspection on site for reinforcement and concrete testing. Concrete scheduled for 6:30am. I will also take pictures for your reference and see what we can see when you arrive. Phone #: ###-#### Inspection requested via web by Travis Blackburn//pass pending specials//
BLD19-02502 BLD-Footing10/23/201910/24/201910/24/2019 10:13:40 AMANR
Inspection for three building footings. vary in depths Phone #: ###-#### Inspection requested via web by David Snow//need plans and engineering onsite//talekd with David he will get them here and call in for re-inspection//
BLD19-02972 BLD-Energy code compliance10/23/201910/24/201910/24/2019 9:54:45 AMAPASS
please call for access- Vedad Phone #: ###-####//truss rengineering provided for cut trusses//
BLD19-03978 BLD-Final10/17/201910/24/201910/24/2019 9:25:37 AMAPASS
ReRoof Inspection requested via web by Elizabeth Melendez//crew is finishing up//appears to be installed within code requirements//rolled roofing torch down//
BLD19-03978 DOC - Permit Finaled10/24/201910/24/201910/24/2019 9:24:56 AMPPASS
BLD19-02755 BLD-Final10/23/201910/24/201910/24/2019 9:17:00 AMAPASS
Phone #: ###-#### Inspection requested via web by Kaleb Checketts//spoke with contact, reviewed onsite//completed per plans//
BLD19-02755 DOC - Permit Finaled10/24/201910/24/201910/24/2019 9:16:26 AMPPASS
BLD19-03494 BLD-Framing/Rough-in10/23/201910/24/201910/24/2019 9:01:39 AMANR
Ryan Phone #: ###-####//needs mechanical inspection completed//
MIS18-00362 MIS-Aging Inspection10/24/201910/24/201910/24/2019 8:16:12 AM DONE
BLD-Conference 9/13/2018 9/14/2018 9/14/2018 A PASS
DetailsDave Hannah

no work that needs a permit
MIS18-00362 DOC - Permit Finaled10/24/201910/24/201910/24/2019 8:15:58 AMPPASS
BLD19-02148 BLD-Aging Inspection10/24/201910/24/201910/24/2019 8:15:19 AM PASS
final was complete//needed doc final//
BLD19-02148 DOC - Permit Finaled10/24/201910/24/201910/24/2019 8:14:59 AMPPASS
MIS18-00353 MIS-Aging Inspection10/24/201910/24/201910/24/2019 8:14:10 AM CANC