Inspections for the day of: Friday, October 25, 2019.
Number of inspections: 31
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorTell Riley
TitleBLD-COM/RES INSPECTOR
Phone #830-2752
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
BLD18-04355 BLD-Aging Inspection10/25/201910/25/201910/29/2019 12:48:36 PM DONE
Expires: 12/10/19
BLD19-03532 BLD-Footing10/25/201910/25/201910/25/2019 4:20:35 PMPPASS
Ed Phone #: ###-####//ok per approved plans//wall and footing//
BLD19-00829 BLD-Final10/24/201910/25/201910/25/2019 4:15:55 PMPNR
Darus Phone #: ###-####//needs to add smoke and carbon monoxide detectors per plans//he will send verification that it is complete//
BLD19-03074 BLD-Framing/Rough-in10/25/201910/25/201910/25/2019 4:02:28 PMPFAIL
MARK Phone #: ###-####//need to add header at bay window per plans//need truss plans onsite//
BLD19-03657 BLD-Footing10/24/201910/25/201910/25/2019 3:21:28 PMPPASS
about 2 it will be ready // mark Phone #: ###-####//per plans//
BLD19-03659 BLD-Footing10/24/201910/25/201910/25/2019 3:21:09 PMPPASS
about 2 it will be ready // mark Phone #: ###-####//per plans//
BLD19-03246 BLD-Final10/24/201910/25/201910/25/2019 2:57:06 PMPPASS
Mierins Rozentals is the on site contact Phone #: ###-#### Inspection requested via web by BRS Permitting//installed per approved plans//
BLD19-03246 DOC - Permit Finaled10/25/201910/25/201910/25/2019 2:56:32 PMPPASS
BLD19-03880 BLD-Final10/25/201910/25/201910/25/2019 2:45:47 PMPPASS
Tell, if you would text homeowner @ ###-#### when your arrive on site, he will put the dogs away so that you can access backyard. Thanks. If any questions regarding project, pls contact Bryce (Foreman) @ ###-####. Thanks again, Rob Inspection requested via web by Rob Maes//installed per approved plans//
BLD19-01976 BLD-Wall Bracing10/24/201910/25/201910/25/2019 2:36:29 PMAPASS
shear.... as late as possible // noah Phone #: ###-####//nailing ok//strapping added and photos sent//
BLD18-00133 BLD-Other10/25/201910/25/201910/25/2019 2:17:07 PMPPASS
Manny- drop celing inspection Phone #: ###-####//1st floor grid ok to cover//
BLD19-02258 BLD-Final10/24/201910/25/201910/25/2019 1:26:59 PMPFAIL
BRYAN Phone #: ###-####//correction notice issued for cable guard at stairs--needs engineer design and site inspection and letter//finish stucco repairs on exterior//
BLD16-00671 BLD-Final10/25/201910/25/201910/25/2019 12:58:42 PMPPASS
Jared- please call ahead Phone #: ###-####//final complete//spoke with Jared--smoke detectors were upgraded per plans--plumbing final complete//
BLD16-00671 DOC - Permit Finaled10/25/201910/25/201910/25/2019 12:57:51 PMPPASS
BLD19-03880 DOC - Permit Finaled10/25/201910/25/201910/25/2019 12:32:41 PMPPASS
BLD19-02871 BLD-Foundation10/24/201910/25/201910/25/2019 11:55:38 AMAPART
late morning-Kyle Phone #: ###-####//wall rebar per plans//vents installed// wip
BLD19-04195 BLD-Wall Bracing10/25/201910/25/201910/25/2019 11:46:48 AMPPASS
nailing ok//will frame in above window //
BLD19-04195 BLD-Framing/Rough-in10/23/201910/25/201910/25/2019 11:41:25 AMANR
LUCAS Phone #: ###-####//left message with contact//will need electrical rough in and mechanical rough in passed per description of project//re inspection for framing will need to be scheduled//
BLD19-03980 BLD-Final10/24/201910/25/201910/25/2019 11:09:35 AMAPASS
Inspection requested via web by Hans Weikl//roof appears to be installed within code requirements//
BLD19-03980 DOC - Permit Finaled10/25/201910/25/201910/25/2019 11:09:06 AMPPASS
BLD19-03558 BLD-Energy code compliance10/24/201910/25/201910/25/2019 11:01:54 AMAFAIL
Shane- please make it late morning Phone #: ###-####//need to add vapor barrier at exterior walls over exposed insulation//add insulation at coffered ceiling where blow in will not be accessible//
BLD19-03778 BLD-Footing10/23/201910/25/201910/25/2019 10:25:11 AMAFAIL
Phone #: 2088675509 >> Inspection requested via mobile web by Rod//no one oniste//no footings formed//also will need to mark property lines///
BLD19-02189 BLD-Framing/Rough-in10/24/201910/25/201910/25/2019 10:15:23 AMAPASS
Soffit and Sheetrock Phone #: ###-#### Inspection requested via web by Clayton Conner//soofits ok per detail on plans//will fire caulk can lights//WIP as they work around the house//ok to continue//
BLD19-03872 BLD-Final10/24/201910/25/201910/25/2019 10:14:21 AMAPASS
Ken Phone #: ###-####//demo complete//excavation for new construction in process....///
BLD19-03872 DOC - Permit Finaled10/25/201910/25/201910/25/2019 10:13:51 AMPPASS
BLD19-01857 BLD-Framing/Rough-in10/24/201910/25/201910/25/2019 9:28:31 AMAPASS
Craig Hammett Phone #: ###-####//most corrections made//still need to nail girder A08//ok to insulate and check girder at energy inspection//
BLD19-04201 BLD-Final10/24/201910/25/201910/25/2019 9:06:50 AMAPASS
Todd Phone #: ###-####//no changes to tennant space//counter is not a sevice counter--only to be used for display of products//
BLD19-01370 BLD-Energy code compliance10/24/201910/25/201910/25/2019 8:53:13 AMAPART
Tim Phone #: ###-####//fire place inspection complete//fire blocking installed for fireplace//insulation ok//still need to verify 1 hr rated wall at property line before final occupancy//correction notice still posted until complete//
BLD19-03601 BLD-Final10/21/201910/25/201910/25/2019 8:41:44 AMAPASS
Inspection requested via web by Naida Khan
BLD19-03601 DOC - Permit Finaled10/25/201910/25/201910/25/2019 8:41:35 AMPPASS
BLD19-03494 BLD-Framing/Rough-in10/24/201910/25/201910/24/2019 2:38:41 PMAPASS
Ryan Phone #: ###-####//mechanical passed 10/24 ok to insulate//