Inspections for the day of: Monday, October 28, 2019.
Number of inspections: 19
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorTell Riley
TitleBLD-COM/RES INSPECTOR
Phone #830-2752
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
BLD19-01694 BLD-Framing/Rough-in10/28/201910/28/201910/28/2019 3:54:40 PMPPART
Willie Phone #: ###-####//add fireblocking at concealed spaces//add nails to girder trusses per engineering//ok to insulate only//
BLD19-03845 BLD-Final10/28/201910/28/201910/28/2019 3:33:28 PMPPASS
Final Phone #: ###-#### Inspection requested via web by Andrew Sunderland//new roof flashings added//roof appears to be installed within code requirements//
BLD19-03845 DOC - Permit Finaled10/28/201910/28/201910/28/2019 3:31:37 PMPPASS
BLD19-03123 BLD-Framing/Rough-in10/25/201910/28/201910/28/2019 2:59:46 PMAPASS
Gary Phone #: ###-####/
BLD19-03124 BLD-Framing/Rough-in10/25/201910/28/201910/28/2019 2:58:42 PMPPART
Gary Phone #: ###-####//need to add truss clips and anchor bolts at plate ends//
BLD19-03659 BLD-Foundation10/25/201910/28/201910/28/2019 2:30:46 PMPPART
wall... 2 if possible // Mark Phone #: ###-####//ok per plans//forman says blanket crew is on their way to cover//confirmed with Mark//
BLD19-03657 BLD-Foundation10/25/201910/28/201910/28/2019 2:30:09 PMPPART
wall... 2 if possible // Mark Phone #: ###-####//ok per plans//blankets are the way//confirmed with Mark//
BLD19-03424 BLD-Framing/Rough-in10/25/201910/28/201910/28/2019 1:57:33 PMAPASS
James Phone #: ###-####//add bearing under ridge beam//ok to cover//
BLD19-03122 BLD-Energy code compliance10/28/201910/28/201910/28/2019 1:31:22 PMPPASS
Nick Phone #: ###-####//corrections made//ok to cover//
BLD19-01828 BLD-Foundation10/28/201910/28/201910/28/2019 12:45:42 PMPCANC
CMU rebar. Grout pour is scheduled for 1:45 pm. Phone #: ###-#### Inspection requested via web by Michael Zaccheo
BLD19-01873 BLD-Framing/Rough-in10/25/201910/28/201910/28/2019 12:33:55 PMAPART
Phone #: ###-#### Inspection requested via web by Clint Wall//correction notice posted onsite//need a few framing corrections//ok to insulate only//
BLD19-01055 BLD-Framing/Rough-in10/25/201910/28/201910/28/2019 12:23:35 PMANR
call half hour before // John Phone #: ###-####//wanted to do walk through prior to trades rough ins//discussed some issues an noted areas to double check prior to framing inspection//framing inspection will need to be completed after rough ins are inspected and passed//still need engineering fix for garage door areas where hold downs were removed//
BLD19-03837 BLD-Framing/Rough-in10/28/201910/28/201910/28/2019 11:56:44 AMPCANC
Phone #: ###-#### Inspection requested via web by BRS Permitting//no work needed to existing structure--no framing inspeciton needed//
BLD19-02511 BLD-Foundation10/26/201910/28/201910/28/2019 10:44:34 AMAPASS
Phone #: ###-#### Inspection requested via web by Edgar Sanchez//blankets onsite//
BLD19-03555 BLD-Footing10/25/201910/28/201910/28/2019 10:11:28 AMANR
Phone #: ###-#### Inspection requested via web by Christian Mikesell//discussed cold weather concrete practices and inspection prcedures//
BLD18-00847 BLD-Conference10/25/201910/28/201910/28/2019 9:43:49 AMADONE
Dan is helping owner and wants to meet//###-####//
BLD19-02502 BLD-Footing10/25/201910/28/201910/28/2019 9:32:41 AMAPART
Plans will be available on site. Call number if there''s any problem finding them.

Thanks,
Phone #: ###-#### Inspection requested via web by David Snow//will need cold weather protection//no frost present at this time//special inspections will need to be completed per approved plans and engineering//
BLD19-00829 BLD-Final10/25/201910/28/201910/28/2019 9:09:50 AMAPASS
smoke detectors added//final complete//
BLD19-00829 DOC - Permit Finaled10/28/201910/28/201910/28/2019 9:09:22 AMPPASS