BLD18-00977
| BLD-Final | 11/25/2019 | 11/25/2019 | 11/25/2019 4:11:50 PM | P | PASS |
|
|
Kevin Phone #: ###-####//final complete//
|
BLD18-00977
| DOC - Permit Finaled | 11/25/2019 | 11/25/2019 | 11/25/2019 4:11:31 PM | P | PASS |
|
|
|
BLD19-03410
| BLD-Footing | 11/22/2019 | 11/25/2019 | 11/25/2019 4:03:13 PM | A | CANC |
|
|
Phone #: ###-#### Inspection requested via web by Andrew Zior
|
BLD19-02936
| BLD-Ceiling Grid Inspection | 11/25/2019 | 11/25/2019 | 11/25/2019 3:55:23 PM | P | PASS |
|
|
Randall Phone #: ###-####
|
BLD19-00676
| BLD-Framing/Rough-in | 11/25/2019 | 11/25/2019 | 11/25/2019 3:16:21 PM | P | PART |
|
|
Peter Phone #: ###-####//front entry--had Pete go down for plan mod for changes on entry//shorter and tied into existing with ridge and rafter--IRC compliant//plan mod to reflect actual//garage already complete//
|
BLD19-01820
| BLD-Energy code compliance | 11/25/2019 | 11/25/2019 | 11/25/2019 2:47:50 PM | P | PASS |
|
|
Willy Phone #: ###-####
|
BLD19-03949
| BLD-Foundation | 11/25/2019 | 11/25/2019 | 11/25/2019 1:55:28 PM | P | PASS |
|
|
Brian Phone #: ###-####
|
BLD19-03399
| BLD-Framing/Rough-in | 11/25/2019 | 11/25/2019 | 11/25/2019 1:06:06 PM | P | PASS |
|
|
Michael Phone #: ###-####//Corrections Made//
|
BLD18-03667
| BLD-Final | 11/25/2019 | 11/25/2019 | 11/25/2019 12:28:13 PM | P | PASS |
|
|
Bob Phone #: ###-####//plan mod for steps at service door and railing complete//final is complete//no signature card to sign//
|
BLD19-02650
| BLD-Final | 11/22/2019 | 11/25/2019 | 11/25/2019 11:40:38 AM | A | CANC |
|
|
Maureen Phone #: ###-####//cancel per contact//
|
BLD19-03841
| BLD-Conference | 11/25/2019 | 11/25/2019 | 11/25/2019 10:54:08 AM | A | FAIL |
|
|
The hold downs missing have been installed and we are ready for the wall bracing inspection please. Thanks Phone #: ###-#### Inspection requested via web by Brad Pfannmuller//need to install hold downs correctly per manufacturers requirements//install hold downs in correct locations//frame portal frames per plans and in correct locations//address hold downs H1 nad H3 have engineer give size//address issue with wall in garage overhanging foundation and bearing of trusses//nailing will need to reflect engineering//
|
BLD19-04306
| BLD-Framing/Rough-in | 11/25/2019 | 11/25/2019 | 11/25/2019 9:52:56 AM | P | PART |
|
|
call for lock box info // Dean Phone #: ###-####//under floor beam fix for damage//beam fix ok per engineering and working on wall stud fixes//under floor ok//need mechanical and plumbing and electrical rough ins completed prior to complete framing//
|
BLD19-03464
| BLD-Framing/Rough-in | 11/23/2019 | 11/25/2019 | 11/25/2019 9:24:25 AM | A | FAIL |
|
|
Phone #: ###-#### Inspection requested via web by greg bauer//need to submit for plan mod for change at front entry and shear changes from engineer//
|
BLD19-04585
| BLD-Final | 11/19/2019 | 11/25/2019 | 11/25/2019 9:03:20 AM | A | CANC |
|
|
Phone #: ###-#### Inspection requested via web by Elizabeth Melendez//cancel per contact//
|
BLD18-04481
| BLD-Aging Inspection | 11/25/2019 | 11/25/2019 | 11/25/2019 6:48:17 AM | | DONE |
|
|
Expires: 01/09/20
|
MIS19-00382
| Set Bond Amount | 11/18/2019 | 11/25/2019 | 11/25/2019 6:47:31 AM | A | DONE |
|
|
follow up....//permit is under review///
|
BLD19-04664
| BLD-Final | 11/22/2019 | 11/25/2019 | 11/25/2019 12:00:00 AM | A | CANC |
|
|
Deborah Phone #: ###-####
|