Inspections for the day of: Monday, November 25, 2019.
Number of inspections: 17
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorTell Riley
TitleBLD-COM/RES INSPECTOR
Phone #830-2752
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
BLD18-00977 BLD-Final11/25/201911/25/201911/25/2019 4:11:50 PMPPASS
Kevin Phone #: ###-####//final complete//
BLD18-00977 DOC - Permit Finaled11/25/201911/25/201911/25/2019 4:11:31 PMPPASS
BLD19-03410 BLD-Footing11/22/201911/25/201911/25/2019 4:03:13 PMACANC
Phone #: ###-#### Inspection requested via web by Andrew Zior
BLD19-02936 BLD-Ceiling Grid Inspection11/25/201911/25/201911/25/2019 3:55:23 PMPPASS
Randall Phone #: ###-####
BLD19-00676 BLD-Framing/Rough-in11/25/201911/25/201911/25/2019 3:16:21 PMPPART
Peter Phone #: ###-####//front entry--had Pete go down for plan mod for changes on entry//shorter and tied into existing with ridge and rafter--IRC compliant//plan mod to reflect actual//garage already complete//
BLD19-01820 BLD-Energy code compliance11/25/201911/25/201911/25/2019 2:47:50 PMPPASS
Willy Phone #: ###-####
BLD19-03949 BLD-Foundation11/25/201911/25/201911/25/2019 1:55:28 PMPPASS
Brian Phone #: ###-####
BLD19-03399 BLD-Framing/Rough-in11/25/201911/25/201911/25/2019 1:06:06 PMPPASS
Michael Phone #: ###-####//Corrections Made//
BLD18-03667 BLD-Final11/25/201911/25/201911/25/2019 12:28:13 PMPPASS
Bob Phone #: ###-####//plan mod for steps at service door and railing complete//final is complete//no signature card to sign//
BLD19-02650 BLD-Final11/22/201911/25/201911/25/2019 11:40:38 AMACANC
Maureen Phone #: ###-####//cancel per contact//
BLD19-03841 BLD-Conference11/25/201911/25/201911/25/2019 10:54:08 AMAFAIL
The hold downs missing have been installed and we are ready for the wall bracing inspection please.
Thanks Phone #: ###-#### Inspection requested via web by Brad Pfannmuller//need to install hold downs correctly per manufacturers requirements//install hold downs in correct locations//frame portal frames per plans and in correct locations//address hold downs H1 nad H3 have engineer give size//address issue with wall in garage overhanging foundation and bearing of trusses//nailing will need to reflect engineering//
BLD19-04306 BLD-Framing/Rough-in11/25/201911/25/201911/25/2019 9:52:56 AMPPART
call for lock box info // Dean Phone #: ###-####//under floor beam fix for damage//beam fix ok per engineering and working on wall stud fixes//under floor ok//need mechanical and plumbing and electrical rough ins completed prior to complete framing//
BLD19-03464 BLD-Framing/Rough-in11/23/201911/25/201911/25/2019 9:24:25 AMAFAIL
Phone #: ###-#### Inspection requested via web by greg bauer//need to submit for plan mod for change at front entry and shear changes from engineer//
BLD19-04585 BLD-Final11/19/201911/25/201911/25/2019 9:03:20 AMACANC
Phone #: ###-#### Inspection requested via web by Elizabeth Melendez//cancel per contact//
BLD18-04481 BLD-Aging Inspection11/25/201911/25/201911/25/2019 6:48:17 AM DONE
Expires: 01/09/20
MIS19-00382 Set Bond Amount11/18/201911/25/201911/25/2019 6:47:31 AMADONE
follow up....//permit is under review///
BLD19-04664 BLD-Final11/22/201911/25/201911/25/2019 12:00:00 AMACANC
Deborah Phone #: ###-####