Inspections for the day of: Thursday, December 19, 2019.
Number of inspections: 17
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorTell Riley
TitleBLD-COM/RES INSPECTOR
Phone #830-2752
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
BLD19-04237 BLD-Wall Bracing12/18/201912/19/201912/19/2019 4:47:20 PMPNR
Phone #: ###-#### Inspection requested via web by Nathan Taylor//need details and shear wall schedule onsite--plan pages refered to are not onsite//
BLD19-01949 BLD-Framing/Rough-in12/19/201912/19/201912/19/2019 4:23:20 PMPPART
Call half hour before // Doyle Phone #: ###-####//gyp board on side entry per details//north wall in courtyard framing of accents ok//
BLD19-00527 BLD-Wall Bracing12/18/201912/19/201912/19/2019 3:19:15 PMAFAIL
Holddown hardware inspection is the last of the shear inspection. Look for Matt to guide the inspection Phone #: ###-#### Inspection requested via web by Travis Blackburn//not all hold downs are correct//address incorrect hold downs and call for re-inspection//
BLD19-00218 BLD-Blower Door Test Results12/19/201912/19/201912/19/2019 2:26:27 PMPDONE
4.1 ACH 50
BLD19-00218 BLD-Final12/19/201912/19/201912/19/2019 2:25:29 PMPPASS
Phone #: ###-#### Inspection requested via web by James Jackson
BLD19-00218 DOC - Permit Finaled12/19/201912/19/201912/19/2019 2:25:20 PMPPASS
BLD18-03877 BLD-Framing/Rough-in12/18/201912/19/201912/19/2019 1:50:24 PMPCANC
clubhouse framing inspection. Phone #: ###-#### >> Inspection requested via web by chad stradley Inspection cancelled from web by: chad stradley
BLD19-00316 BLD-Footing12/16/201912/19/201912/19/2019 1:46:01 PMPPART
They will be pouring at 2 pm. Strata will be on site at 145 PM for testing Phone #: ###-#### Inspection requested via web by chad stradley//ok pend specials//cleaning footings to meet frost depth while onsite//blankets onsite//
BLD19-03701 BLD-Wall Bracing12/19/201912/19/201912/19/2019 1:20:04 PMPFAIL
Mark Phone #: ###-####//need to add hardware to portal frames//need conversion for staples from engineer//add blockin as discussed//add hot dipped galvanized nails at sill plates//
BLD19-03656 BLD-Footing12/18/201912/19/201912/19/2019 12:45:17 PMPPART
Pat Phone #: ###-####//setbacks per plans//rebar in garage openings//will cover after pour//no frost observed in subgrade at time of inspection//
BLD19-03250 BLD-Wall Bracing12/18/201912/19/201912/19/2019 10:46:39 AMAPART
Inspection requested via web by Carl Funk//Nailing and hardware ok in most locations--some strapping needs lowered//location near fire separation wall will need tied into shear wall, waiting for engineered detail//
BLD19-03249 BLD-Wall Bracing12/18/201912/19/201912/19/2019 10:45:51 AMAPART
Inspection requested via web by Carl Funk//Nailing and hardware ok in most locations--some strapping needs lowered//location near fire separation wall will need tied into shear wall, waiting for engineered detail//
BLD19-03251 BLD-Wall Bracing12/18/201912/19/201912/19/2019 10:45:21 AMAPART
Inspection requested via web by Carl Funk//Nailing and hardware ok in most locations--some strapping needs lowered//location near fire separation wall will need tied into shear wall, waiting for engineered detail//
BLD19-03252 BLD-Wall Bracing12/18/201912/19/201912/19/2019 10:44:56 AMAPART
Inspection requested via web by Carl Funk//Nailing and hardware ok in most locations--some strapping needs lowered//location near fire separation wall will need tied into shear wall, waiting for engineered detail//
BLD18-02854 BLD-Aging Inspection12/19/201912/19/201912/19/2019 10:09:43 AM DONE
Expires: 02/03/20
BLD18-02818 BLD-Aging Inspection12/19/201912/19/201912/19/2019 10:07:36 AM DONE
Expires: 02/02/20
BLD18-04112 BLD-Final12/18/201912/19/201912/19/2019 9:49:45 AMAPASS
Jay Phone #: ###-####//signed card--final occupancy ok//