BLD19-04237
| BLD-Wall Bracing | 12/18/2019 | 12/19/2019 | 12/19/2019 4:47:20 PM | P | NR |
|
|
Phone #: ###-#### Inspection requested via web by Nathan Taylor//need details and shear wall schedule onsite--plan pages refered to are not onsite//
|
BLD19-01949
| BLD-Framing/Rough-in | 12/19/2019 | 12/19/2019 | 12/19/2019 4:23:20 PM | P | PART |
|
|
Call half hour before // Doyle Phone #: ###-####//gyp board on side entry per details//north wall in courtyard framing of accents ok//
|
BLD19-00527
| BLD-Wall Bracing | 12/18/2019 | 12/19/2019 | 12/19/2019 3:19:15 PM | A | FAIL |
|
|
Holddown hardware inspection is the last of the shear inspection. Look for Matt to guide the inspection Phone #: ###-#### Inspection requested via web by Travis Blackburn//not all hold downs are correct//address incorrect hold downs and call for re-inspection//
|
BLD19-00218
| BLD-Blower Door Test Results | 12/19/2019 | 12/19/2019 | 12/19/2019 2:26:27 PM | P | DONE |
|
|
4.1 ACH 50
|
BLD19-00218
| BLD-Final | 12/19/2019 | 12/19/2019 | 12/19/2019 2:25:29 PM | P | PASS |
|
|
Phone #: ###-#### Inspection requested via web by James Jackson
|
BLD19-00218
| DOC - Permit Finaled | 12/19/2019 | 12/19/2019 | 12/19/2019 2:25:20 PM | P | PASS |
|
|
|
BLD18-03877
| BLD-Framing/Rough-in | 12/18/2019 | 12/19/2019 | 12/19/2019 1:50:24 PM | P | CANC |
|
|
clubhouse framing inspection. Phone #: ###-#### >> Inspection requested via web by chad stradley Inspection cancelled from web by: chad stradley
|
BLD19-00316
| BLD-Footing | 12/16/2019 | 12/19/2019 | 12/19/2019 1:46:01 PM | P | PART |
|
|
They will be pouring at 2 pm. Strata will be on site at 145 PM for testing Phone #: ###-#### Inspection requested via web by chad stradley//ok pend specials//cleaning footings to meet frost depth while onsite//blankets onsite//
|
BLD19-03701
| BLD-Wall Bracing | 12/19/2019 | 12/19/2019 | 12/19/2019 1:20:04 PM | P | FAIL |
|
|
Mark Phone #: ###-####//need to add hardware to portal frames//need conversion for staples from engineer//add blockin as discussed//add hot dipped galvanized nails at sill plates//
|
BLD19-03656
| BLD-Footing | 12/18/2019 | 12/19/2019 | 12/19/2019 12:45:17 PM | P | PART |
|
|
Pat Phone #: ###-####//setbacks per plans//rebar in garage openings//will cover after pour//no frost observed in subgrade at time of inspection//
|
BLD19-03250
| BLD-Wall Bracing | 12/18/2019 | 12/19/2019 | 12/19/2019 10:46:39 AM | A | PART |
|
|
Inspection requested via web by Carl Funk//Nailing and hardware ok in most locations--some strapping needs lowered//location near fire separation wall will need tied into shear wall, waiting for engineered detail//
|
BLD19-03249
| BLD-Wall Bracing | 12/18/2019 | 12/19/2019 | 12/19/2019 10:45:51 AM | A | PART |
|
|
Inspection requested via web by Carl Funk//Nailing and hardware ok in most locations--some strapping needs lowered//location near fire separation wall will need tied into shear wall, waiting for engineered detail//
|
BLD19-03251
| BLD-Wall Bracing | 12/18/2019 | 12/19/2019 | 12/19/2019 10:45:21 AM | A | PART |
|
|
Inspection requested via web by Carl Funk//Nailing and hardware ok in most locations--some strapping needs lowered//location near fire separation wall will need tied into shear wall, waiting for engineered detail//
|
BLD19-03252
| BLD-Wall Bracing | 12/18/2019 | 12/19/2019 | 12/19/2019 10:44:56 AM | A | PART |
|
|
Inspection requested via web by Carl Funk//Nailing and hardware ok in most locations--some strapping needs lowered//location near fire separation wall will need tied into shear wall, waiting for engineered detail//
|
BLD18-02854
| BLD-Aging Inspection | 12/19/2019 | 12/19/2019 | 12/19/2019 10:09:43 AM | | DONE |
|
|
Expires: 02/03/20
|
BLD18-02818
| BLD-Aging Inspection | 12/19/2019 | 12/19/2019 | 12/19/2019 10:07:36 AM | | DONE |
|
|
Expires: 02/02/20
|
BLD18-04112
| BLD-Final | 12/18/2019 | 12/19/2019 | 12/19/2019 9:49:45 AM | A | PASS |
|
|
Jay Phone #: ###-####//signed card--final occupancy ok//
|