BLD19-00100
| BLD-Aging Inspection | 12/3/2019 | 12/3/2019 | 12/4/2019 8:30:54 AM | | CANC |
|
|
|
BLD19-03934
| BLD-Conference | 12/3/2019 | 12/3/2019 | 12/3/2019 4:48:20 PM | P | DONE |
|
|
Call 15 mins berfore- Travis Phone #: ###-####
|
BLD19-01756
| BLD-Final | 12/3/2019 | 12/3/2019 | 12/3/2019 3:50:35 PM | P | FAIL |
|
|
Vinnie Phone #: ###-####//back step over 7 3/4"--need to fix//
|
BLD19-03220
| BLD-Energy code compliance | 12/3/2019 | 12/3/2019 | 12/3/2019 3:29:01 PM | P | PASS |
|
|
|
BLD19-03464
| BLD-Wall Bracing | 12/3/2019 | 12/3/2019 | 12/3/2019 3:00:36 PM | P | PASS |
|
|
Phone #: ###-#### Inspection requested via web by greg bauer
|
BLD19-01912
| BLD-Final | 12/2/2019 | 12/3/2019 | 12/3/2019 2:41:16 PM | P | PASS |
|
|
jACK Phone #: ###-####
|
BLD19-01912
| DOC - Permit Finaled | 12/3/2019 | 12/3/2019 | 12/3/2019 2:41:06 PM | P | PASS |
|
|
|
BLD19-03209
| BLD-Final | 12/3/2019 | 12/3/2019 | 12/3/2019 2:06:53 PM | P | PART |
|
|
Tom Phone #: ###-####//phase 1 temp occupancy approved//
|
BLD19-04511
| BLD-Final | 12/2/2019 | 12/3/2019 | 12/3/2019 1:40:26 PM | P | CANC |
|
|
Jerry Phone #: ###-####//not ready//discussed finding property pins for 3 foot setback//will need to visually see pins to verify setbacks//also discussed rock anchors///
|
BLD19-04565
| BLD-Final | 12/3/2019 | 12/3/2019 | 12/3/2019 1:16:06 PM | P | PASS |
|
|
Phone #: ###-#### Inspection requested via web by Ira Rutledge//roof appears to be installed within code requirements//
|
BLD19-04565
| DOC - Permit Finaled | 12/3/2019 | 12/3/2019 | 12/3/2019 1:15:37 PM | P | PASS |
|
|
|
BLD19-00527
| BLD-Other | 12/3/2019 | 12/3/2019 | 12/3/2019 12:22:46 PM | P | FAIL |
|
|
This inspection is for prerock areas behind tubs at party walls and exterior walls prior to setting tub/shower enclosures. Phone #: ###-#### Inspection requested via web by Travis Blackburn//need to remove insulation at exterior wall fur outs to drywall per details //call for re - inspection//
|
BLD19-02871
| BLD-Final | 12/2/2019 | 12/3/2019 | 12/3/2019 12:22:45 PM | A | PASS |
|
|
Katie Phone #: ###-####//corrections made final complete//
|
BLD19-02871
| DOC - Permit Finaled | 12/3/2019 | 12/3/2019 | 12/3/2019 12:22:45 PM | P | PASS |
|
|
|
BLD19-02944
| BLD-Final | 12/2/2019 | 12/3/2019 | 12/3/2019 11:32:45 AM | A | CANC |
|
|
Renae Phone #: ###-####//needs final fire life safety passed prior to inspection//
|
MIS19-00345
| BLD-Conference | 11/20/2019 | 12/3/2019 | 12/3/2019 10:56:11 AM | A | DONE |
|
|
follow up...//talked with owner--said they made contact with Josh at the counter// do not see any permits issued for carport//it now appears to be fully enclosed and a garage door added//left my card for the owners husband to call when he is finished with business call//
|
BLD19-03220
| BLD-Framing/Rough-in | 12/2/2019 | 12/3/2019 | 12/3/2019 10:18:00 AM | A | PASS |
|
|
Phone #: ###-#### Inspection requested via web by Paul Nesbitt//ok per plans//ok to insulate//
|
BLD19-01949
| BLD-Framing/Rough-in | 12/2/2019 | 12/3/2019 | 12/3/2019 10:05:07 AM | A | PART |
|
|
Call 30 mins ahead- Doyle Phone #: ###-####//parapet wall ok//wall accent framing ok--need to add 1 hr protection per plans and call for verifiction//side entry framing ok--add 1 hr rated assembly per plans and call for inspection//
|
BLD19-03197
| BLD-Framing/Rough-in | 12/2/2019 | 12/3/2019 | 12/3/2019 9:20:12 AM | A | FAIL |
|
|
jeff Phone #: ###-####//CN posted//need to fix truss clip north wall//add stud to beam pocket per engineering//add strap to portal frame on interior side per detail//provide engineered truss letter or fix for truss bearing points not lining up on wall per truss plans//
|
BLD19-03214
| BLD-Framing/Rough-in | 12/2/2019 | 12/3/2019 | 12/3/2019 8:58:04 AM | A | FAIL |
|
|
jeff Phone #: ###-####//CN posted//add strap to inside of portal frame header per detail//add truss clips south side of garage//provide truss engineering//
|
BLD19-04619
| BLD-Final | 12/2/2019 | 12/3/2019 | 12/2/2019 2:12:29 PM | A | CANC |
|
|
Jim please call prior Phone #: ###-####
|