Inspections for the day of: Monday, December 30, 2019.
Number of inspections: 18
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorTell Riley
TitleBLD-COM/RES INSPECTOR
Phone #830-2752
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
MIS19-00022 MIS-Aging Inspection12/30/201912/30/201912/31/2019 7:22:50 AM DONE
house has been demolished//
BLD19-01686 BLD-Final12/30/201912/30/201912/30/2019 4:35:59 PMPPASS
Garage 3162 Phone #: ###-#### Inspection requested via web by Kelly Stover//corrections made//
BLD19-01686 DOC - Permit Finaled12/30/201912/30/201912/30/2019 4:35:43 PMPPASS
BLD19-03701 BLD-Wall Bracing12/30/201912/30/201912/30/2019 4:35:29 PMPPART
Mark Phone #: ###-####//exterior ok//will need to make corrections to interior shear locations--check at framing//
BLD19-01150 BLD-Framing/Rough-in12/30/201912/30/201912/30/2019 3:00:45 PMPFAIL
Phone #: 2085149240 >> Inspection requested via mobile web by Andy//need to fireblock penetrations in top and bottom plates//complete air seal//obtain mechanical permit and rough in inspection//CN posted//
BLD19-01860 BLD-Wall Bracing12/30/201912/30/201912/30/2019 2:31:11 PMPPART
craig Phone #: ###-####//area near stairs first floor needs blocked and screwed at 4 in oc//all other areas ok//
BLD19-02406 BLD-Concrete12/27/201912/30/201912/30/2019 2:00:29 PMPPEND
This is for CMU bar and Grout placement at first 4'' Lift. MTI on board for observation and inspection. Ready at 2:00 pm tentatively Any questions please feel free to call me at anytime.
Thank You, Phone #: ###-#### Inspection requested via web by Ron Oswald//added bar in areas needed per plans//pend specials //
BLD19-02869 BLD-Final12/30/201912/30/201912/30/2019 1:21:24 PMPNR
Tom Phone #: ###-####//need special isnpection report//talked with Tom, may need to have pull test as no specials were completed, he will talk with design engineer//
BLD19-04340 BLD-Final12/30/201912/30/201912/30/2019 12:58:28 PMPPASS
Tom Phone #: ###-####
BLD19-04852 BLD-Framing/Rough-in12/27/201912/30/201912/30/2019 12:58:10 PMAPASS
Lynn Phone #: ###-####
BLD19-02700 BLD-Wall Bracing12/27/201912/30/201912/30/2019 12:11:58 PMPFAIL
Brandon Phone #: ###-####//need to add nails for 4" pattern per plans//add blocks and nails at edges on garage//
BLD19-00676 BLD-Final12/27/201912/30/201912/30/2019 11:06:55 AMAPASS
Call for access Pete Phone #: ###-####//corrections made and final complete//
BLD19-00676 DOC - Permit Finaled12/30/201912/30/201912/30/2019 11:06:36 AMPPASS
BLD19-04507 BLD-Foundation12/27/201912/30/201912/30/2019 11:06:07 AMADEFR
dane Phone #: ###-####//foundation was not inspected and poured//contractor assumes all liability//
BLD19-03956 BLD-Final12/27/201912/30/201912/30/2019 10:22:11 AMAPASS
Phone #: ###-#### Inspection requested via web by Scott Smith//roof appears to be installed within code requirements//
BLD19-03956 DOC - Permit Finaled12/30/201912/30/201912/30/2019 10:21:44 AMPPASS
BLD19-04380 BLD-Framing/Rough-in12/27/201912/30/201912/30/2019 9:20:45 AMACANC
Please call Brian Prussia with any questions or concerns at 208.241.5835 Phone #: ###-#### Inspection requested via web by BRS Permitting// No work needed to the existing roof structure per engineer’s roof evaluation.//
BLD12-00075 BLD-Concrete12/28/201912/30/201912/30/2019 9:19:56 AMAPART
A pour is planned for 9 am this is not a footer pour. The pour is for the base of the overflow containment trough that runs around two sides of the external storage tank pad. A rebar inspection was performed and passed by MTI. MTI and RSCI QC will be onsite to collect cylinders and to monitor concrete specifications. It would be a good time to visit about what kind of inspections the City wants to perform. This is a small job but there will be numerous small pours. This pour is 6cy. Phone #: ###-#### Inspection requested via web by John Cloninger//met onsite with GC//specials onsite rebar approved per specials, ok pending all specials//blankets and ground heater onsite//