Inspections for the day of: Wednesday, December 4, 2019.
Number of inspections: 13
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorTell Riley
TitleBLD-COM/RES INSPECTOR
Phone #830-2752
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
BLD19-00655 BLD-Aging Inspection12/4/201912/4/201912/5/2019 3:09:01 PM CANC
BLD19-03214 BLD-Framing/Rough-in12/4/201912/4/201912/4/2019 4:40:51 PMPPASS
Jeff Phone #: ###-####//corrections made//framing and insulation ok//
BLD19-04697 BLD-Final12/2/201912/4/201912/4/2019 3:41:05 PMPPASS
Shaun Phone #: ###-####//no changes to existing//matches floor plan//occupancy ok//
BLD19-03197 BLD-Framing/Rough-in12/4/201912/4/201912/4/2019 3:17:50 PMPPASS
Jeff Phone #: ###-####//corrections made//engineering provided for trusses installed backwards--gussetts nailing and added webs installed per engineering//ok to insulate//
BLD19-02327 BLD-Final12/4/201912/4/201912/4/2019 2:43:35 PMPFAIL
Jamie Phone #: ###-####//CN issued add handrail back steps and ramps//verify parking is ok with zoning//
BLD17-03168 BLD-Final12/2/201912/4/201912/4/2019 2:05:07 PMPNR
Chit Phone #: ###-####//need to add sink drain cover per description on two bathrooms//
BLD19-03388 BLD-Other12/4/201912/4/201912/4/2019 12:58:49 PMPPASS
Autin- sheer nail outside of house- pl;ease call prior if possible Phone #: ###-####
MIS19-00345 BLD-Conference12/4/201912/4/201912/4/2019 12:39:53 PMADONE
met with Joe, discussed reason for violation//issued notice of violation 5 day//check back on day six//
BLD19-02732 BLD-Final12/3/201912/4/201912/4/2019 11:23:17 AMAPASS
Phone #: ###-#### Inspection requested via web by Naida Khan
BLD19-02732 DOC - Permit Finaled12/4/201912/4/201912/4/2019 11:23:09 AMPPASS
BLD19-04511 BLD-Footing12/3/201912/4/201912/4/2019 11:16:03 AMAPART
already discussed the setbacks//want to see them drill in the rock anchors///set backs ok//pin in back of lot, inside fence, bumped building forward to meet plans//still may be issues with the rock anchors being installed//
BLD19-00538 BLD-Concrete12/3/201912/4/201912/4/2019 10:19:42 AMAPART
This inspection is for the stem walls for the garbage enclosures around the site. There are are 5 in total. The pour is at 11, please come as close to 10am as possible. Phone #: ###-#### Inspection requested via web by Matt Perry//first 4 trash enclosure stem wall ok, pending specials//
BLD18-03143 BLD-Conference12/3/201912/4/201912/4/2019 9:42:27 AMADONE
Stairwell review Phone #: ###-#### Inspection requested via web by Mike Beeson