Inspections for the day of: Friday, February 14, 2020.
Number of inspections: 23
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorTell Riley
TitleBLD-COM/RES INSPECTOR
Phone #830-2752
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
BLD19-01265 BLD-Aging Inspection2/14/20202/14/20202/18/2020 8:25:06 AM PASS
WIP
BLD18-01781 BLD-Aging Inspection2/14/20202/14/20202/18/2020 8:24:10 AM CANC
BLD19-00535 BLD-Wall Bracing2/13/20202/14/20202/14/2020 3:42:59 PMPNR
Exterior shear inspection including hardware if time allows Phone #: ###-#### Inspection requested via web by Travis Blackburn//need to renail the fist 2 stories, nails are over driven//
BLD19-00527 BLD-Framing/Rough-in2/13/20202/14/20202/14/2020 3:42:20 PMAPART
2nd floor inspection to allow insulation Phone #: ###-#### Inspection requested via web by Travis Blackburn//ok// need to provide fix for the cut joists for plumbing//
BLD20-00110 BLD-Framing/Rough-in2/14/20202/14/20202/14/2020 3:30:27 PMPPART
Derek Phone #: ###-####//may need electrical permit to remove wiring for one light//other framing and demo ok//will need to see plumbing capped//
BLD20-00250 BLD-Final2/11/20202/14/20202/14/2020 3:21:18 PMPCANC
Ali Phone #: ###-####
MIS20-00051 BLD-Conference2/14/20202/14/20202/14/2020 2:59:41 PMPDONE
exterior work being done//appears to be new windows and roofing//possible interior work as well based on demo material in truck onsite//check back 5 days//
BLD20-00471 BLD-Final2/14/20202/14/20202/14/2020 2:49:57 PMPFAIL
Walter Phone #: ###-####//windows have not been replaced yet//
BLD20-00130 BLD-Framing/Rough-in2/14/20202/14/20202/14/2020 2:44:33 PMPFAIL
Matt Phone #: ###-####//need electrical inspection//need plumbing permit//
BLD19-00529 BLD-Footing2/14/20202/14/20202/14/2020 2:38:20 PMPPASS
Concrete pour scheduled for Saturday with Special inspections scheduled as well. Phone #: ###-#### Inspection requested via web by Travis Blackburn//ok pending specials//
BLD20-00149 BLD-Footing2/14/20202/14/20202/14/2020 1:48:53 PMPCANC
Phone #: 2089109404 >> Inspection requested via mobile web by Ricardo aggregate constru
BLD19-04306 BLD-Final2/13/20202/14/20202/14/2020 12:54:01 PMAPASS
Dean- call 30 min prior if possible Phone #: ###-####//R-13 added to fill cavity and suported by twine below the r- 19 that was stapled to sub floor//final is complete//
BLD19-04306 DOC - Permit Finaled2/14/20202/14/20202/14/2020 12:52:36 PMPPASS
BLD19-04743 BLD-Foundation2/13/20202/14/20202/14/2020 12:24:18 PMPPASS
Brian Phone #: ###-####//wall ok//
BLD19-00527 BLD-Energy code compliance2/13/20202/14/20202/14/2020 12:02:39 PMAPART
3rd floor cover inspection again for units only after visqueen on the ceiling was installed except for unit 312 Phone #: ###-#### Inspection requested via web by Travis Blackburn//VB isntalled and secure to underside of ceiling//
BLD19-04887 BLD-Footing2/13/20202/14/20202/14/2020 12:02:04 PMAPART
Brett Phone #: ###-####//WIP//setbacks ok per plans//still installing rebar//
BLD20-00032 BLD-Foundation2/13/20202/14/20202/14/2020 10:48:22 AMAFAIL
Matt Phone #: ###-####//contact did not answer//left CN with owner//footings need to be 12" wide and 24" below grade for frost protection//find corner pin to measure setbacks//
BLD19-04033 BLD-Energy code compliance2/13/20202/14/20202/14/2020 10:03:19 AMAPASS
Jeff Phone #: ###-####//corrections made//
BLD19-00362 BLD-Ceiling Grid Inspection2/13/20202/14/20202/14/2020 9:39:43 AMAPART
Troy Phone #: ###-####//cafeteria area only//
BLD20-00445 BLD-Final2/12/20202/14/20202/14/2020 9:17:16 AMADONE
roof inspection - cody Phone #: ###-####
BLD20-00445 DOC - Permit Finaled2/14/20202/14/20202/14/2020 9:17:05 AMPPASS
no access to back of home//new roof flashings installed//roofing appears to be installed within code requirements//
BLD19-04967 BLD-Final2/10/20202/14/20202/14/2020 8:54:44 AMADONE
Will need to be called day before to schedule to have someone there with ladder. Thank you Phone #: ###-#### Inspection requested via web by Kerrie Kuhn
BLD19-04967 DOC - Permit Finaled2/14/20202/14/20202/14/2020 8:54:33 AMPPASS
//back 2/3 of building only//roof appears to be installed per description//new flashing and edge metal installed//