BLD19-01265
| BLD-Aging Inspection | 2/14/2020 | 2/14/2020 | 2/18/2020 8:25:06 AM | | PASS |
|
|
WIP
|
BLD18-01781
| BLD-Aging Inspection | 2/14/2020 | 2/14/2020 | 2/18/2020 8:24:10 AM | | CANC |
|
|
|
BLD19-00535
| BLD-Wall Bracing | 2/13/2020 | 2/14/2020 | 2/14/2020 3:42:59 PM | P | NR |
|
|
Exterior shear inspection including hardware if time allows Phone #: ###-#### Inspection requested via web by Travis Blackburn//need to renail the fist 2 stories, nails are over driven//
|
BLD19-00527
| BLD-Framing/Rough-in | 2/13/2020 | 2/14/2020 | 2/14/2020 3:42:20 PM | A | PART |
|
|
2nd floor inspection to allow insulation Phone #: ###-#### Inspection requested via web by Travis Blackburn//ok// need to provide fix for the cut joists for plumbing//
|
BLD20-00110
| BLD-Framing/Rough-in | 2/14/2020 | 2/14/2020 | 2/14/2020 3:30:27 PM | P | PART |
|
|
Derek Phone #: ###-####//may need electrical permit to remove wiring for one light//other framing and demo ok//will need to see plumbing capped//
|
BLD20-00250
| BLD-Final | 2/11/2020 | 2/14/2020 | 2/14/2020 3:21:18 PM | P | CANC |
|
|
Ali Phone #: ###-####
|
MIS20-00051
| BLD-Conference | 2/14/2020 | 2/14/2020 | 2/14/2020 2:59:41 PM | P | DONE |
|
|
exterior work being done//appears to be new windows and roofing//possible interior work as well based on demo material in truck onsite//check back 5 days//
|
BLD20-00471
| BLD-Final | 2/14/2020 | 2/14/2020 | 2/14/2020 2:49:57 PM | P | FAIL |
|
|
Walter Phone #: ###-####//windows have not been replaced yet//
|
BLD20-00130
| BLD-Framing/Rough-in | 2/14/2020 | 2/14/2020 | 2/14/2020 2:44:33 PM | P | FAIL |
|
|
Matt Phone #: ###-####//need electrical inspection//need plumbing permit//
|
BLD19-00529
| BLD-Footing | 2/14/2020 | 2/14/2020 | 2/14/2020 2:38:20 PM | P | PASS |
|
|
Concrete pour scheduled for Saturday with Special inspections scheduled as well. Phone #: ###-#### Inspection requested via web by Travis Blackburn//ok pending specials//
|
BLD20-00149
| BLD-Footing | 2/14/2020 | 2/14/2020 | 2/14/2020 1:48:53 PM | P | CANC |
|
|
Phone #: 2089109404 >> Inspection requested via mobile web by Ricardo aggregate constru
|
BLD19-04306
| BLD-Final | 2/13/2020 | 2/14/2020 | 2/14/2020 12:54:01 PM | A | PASS |
|
|
Dean- call 30 min prior if possible Phone #: ###-####//R-13 added to fill cavity and suported by twine below the r- 19 that was stapled to sub floor//final is complete//
|
BLD19-04306
| DOC - Permit Finaled | 2/14/2020 | 2/14/2020 | 2/14/2020 12:52:36 PM | P | PASS |
|
|
|
BLD19-04743
| BLD-Foundation | 2/13/2020 | 2/14/2020 | 2/14/2020 12:24:18 PM | P | PASS |
|
|
Brian Phone #: ###-####//wall ok//
|
BLD19-00527
| BLD-Energy code compliance | 2/13/2020 | 2/14/2020 | 2/14/2020 12:02:39 PM | A | PART |
|
|
3rd floor cover inspection again for units only after visqueen on the ceiling was installed except for unit 312 Phone #: ###-#### Inspection requested via web by Travis Blackburn//VB isntalled and secure to underside of ceiling//
|
BLD19-04887
| BLD-Footing | 2/13/2020 | 2/14/2020 | 2/14/2020 12:02:04 PM | A | PART |
|
|
Brett Phone #: ###-####//WIP//setbacks ok per plans//still installing rebar//
|
BLD20-00032
| BLD-Foundation | 2/13/2020 | 2/14/2020 | 2/14/2020 10:48:22 AM | A | FAIL |
|
|
Matt Phone #: ###-####//contact did not answer//left CN with owner//footings need to be 12" wide and 24" below grade for frost protection//find corner pin to measure setbacks//
|
BLD19-04033
| BLD-Energy code compliance | 2/13/2020 | 2/14/2020 | 2/14/2020 10:03:19 AM | A | PASS |
|
|
Jeff Phone #: ###-####//corrections made//
|
BLD19-00362
| BLD-Ceiling Grid Inspection | 2/13/2020 | 2/14/2020 | 2/14/2020 9:39:43 AM | A | PART |
|
|
Troy Phone #: ###-####//cafeteria area only//
|
BLD20-00445
| BLD-Final | 2/12/2020 | 2/14/2020 | 2/14/2020 9:17:16 AM | A | DONE |
|
|
roof inspection - cody Phone #: ###-####
|
BLD20-00445
| DOC - Permit Finaled | 2/14/2020 | 2/14/2020 | 2/14/2020 9:17:05 AM | P | PASS |
|
|
no access to back of home//new roof flashings installed//roofing appears to be installed within code requirements//
|
BLD19-04967
| BLD-Final | 2/10/2020 | 2/14/2020 | 2/14/2020 8:54:44 AM | A | DONE |
|
|
Will need to be called day before to schedule to have someone there with ladder. Thank you Phone #: ###-#### Inspection requested via web by Kerrie Kuhn
|
BLD19-04967
| DOC - Permit Finaled | 2/14/2020 | 2/14/2020 | 2/14/2020 8:54:33 AM | P | PASS |
|
|
//back 2/3 of building only//roof appears to be installed per description//new flashing and edge metal installed//
|